DFI and NDT – Parallel Histories and Mutual Benefits
By Bernard H. Hertlein
"When the Deep Foundations Institute (DFI) was founded, quality assurance and quality control (QA/QC) of foundation construction was rudimentary. Nondestructive testing (NDT) was a nascent technology,
Jan 1, 2017
-
Injecting Sustainability into Deep Soil Mixing Projects
By Paul R. Lear
Sustainability continues to be an important aspect of remediation and infrastructure projects. Deep soil mixing (DSM), a common construction and remedial technology, can easily incorporate the followi
Sep 8, 2021
-
High And Low Strain Testing Of Bouncing Piles
By Kyle L. Murrell
Along the southeast United States coast, clayey silt and silty clay marine formations may cause pile installation and integrity problems. More specifically, excess pore pressures which develop in the
Jan 1, 2008
-
A Seismic Construction Of Piling Head ? Synopsis
By K. Oshima
In Japan, earthquakes are experienced frequently. Many buildings and structures in Japan are supported on pile foundations. For these pile foundations, the joint section between the piles and footing
Jan 1, 2010
-
Use Of Cone Penetration Test (CPT) Results For Accurate Assessments Of Pile Capacities
By Anand J. Puppala
This paper provides information on various evaluation studies conducted to assess the CPT based interpretation methods. Salient findings from these evaluations are summarized. Additionally, a comprehe
Jan 1, 2002
-
Effects Of Environment On Deep Foundation Elements - Synopsis
By Subhash B. Bhide
Deep foundations are affected by the presence of sulphates, chlorides, organic contents and water currents present in the soil. The sulphates in soil and ground water interfere first with setting of c
Jan 1, 1996
-
Construction Of A Bicycle And Pedestrian Path West Of The Henry Hudson PWY
By David Coleman
This paper presents a case history involving the installation of drilled in piles with rock sockets for the Bicycle and Pedestrian Path project located west of the Henry Hudson Parkway within the Rive
-
Inspection and Observation Methods
"Full time inspection of drilled shafts by qualified personnel is a necessary part of construction. Detailed inspection procedures for routine inspection are provided in the Drilled Shaft Inspector’s
Jan 1, 2004
-
The Potential Impacts Of Questionable Instrumenation Data
By Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
Design Practice Of Circular Diaphragm Wall Structure With Large Diameter ? Synopsis
By X. Y. Hou
The design practice of several circular underground projects with large diameter is summarized. By taking the advantages of load-bearing of circular structure, a rational annular tensile bar support s
Jan 1, 2010
-
Effects Of Permanent And Temporary Loads On Allowable Bearing Capacity Of Piles Subjected To Nagative Skin Friction
By Mohammad T. Izadi
Piles are, often, used for transferring load from the super structure through soft consolidating strata onto relatively stiff uncompressible soils. Downward movement of the soft soil strata develops
Jan 1, 2001
-
Full Scale Loading Tests Of NF Pile ? Synopsis
By M. Nomura
This paper describes the results and field measurements of two long-term observation tests and two short-term loading tests to confirm the effectiveness of NF piles in reducing negative skin friction.
Jan 1, 2010
-
Corroboration and Remediation Options
"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Assessment of Existing Bulkhead Walls for Dredging Impacts
By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Session 29 "Grouting for Tunnels 1"
By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
Engineering Sustainability
"What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som
Jan 1, 2009
-
Micropiles Take Off at Dulles Airport
By Eric Rehwoldt, Walt Rabe, Jesús Gómez, Tim Myers
"An expansion plan for Washington Dulles International Airport is currently underway to prepare for growth at this northern Virginia facility in the future. While Dulles currently serves more than 20
Jan 1, 2009
-
Foundation Code8 And Linit 8tatb Partial Factoring - Synopsis
By W. G. K. Fleming
The codification of foundation design and construction is a subject of extensive discussion in Europe and all current code proposals are based on limit state partial factoring. For simplicity, it is c
Jan 1, 1996
-
Utilizing Drones to Improve Project Workflows
By Barritt Lovelace
Collins Engineers has been researching and implementing the use of drones on Civil Engineering Projects since 2015. Applications include bridge inspection, asset management, mapping, construction site
Jan 1, 2019
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"
By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990