Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Novel Dewatering Aids for Mineral Concentrates and Coal
By M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu
"According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus
Jan 1, 2005
-
Discounted cash flow analysis — Methodology and discount rates
By L. D. Smith
"This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of
Jan 1, 2002
-
Modelling and Resource Estimation of a Thin-Layered Lignite Deposit
By Ioannis K. Kapageridis
The lignite deposits of the Kozani-Ptolemais-Amyntaio basin in western Macedonia (North-West Greece) present a difficult modelling problem. Each deposit consists of several thin lignite layers ranging
Oct 1, 2009
-
Enabling Advanced Energy Management Practice for Minerals Operations
By Dean L. Millar
Measures taken by mining companies around the world to reduce their carbon footprints are becoming increasingly important in the sector securing its social licence to operate. The options for measures
May 1, 2011
-
Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy
By J. Châteauneuf, R. Dupéré, D. Mrabet
"In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a
Jan 1, 2016
-
Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities
By Ian Bruce
Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp
May 1, 2002
-
The Role of Applied Biotechnology in Decommissioning Mining Operations
By Margarete Kalin
"Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma
Jan 1, 1998
-
Cultivator shank manufacture and evaluation
By R. W. Pugh, D. G. Bellow
"This paper will describe how cultivator shanks are made in one company and how the manufacturing was studied with a view to increasing product consistency and reducing manufacturing cost. The product
Jan 1, 1982
-
Moly-Cop Tools Applications for the Assessment of Grinding Media Performance at Full Industrial Scale
By J. E. Sepulveda, R. Morrow
"The Linear Wear Theory provides a reliable framework for the assessment of grinding media performance at full scale. This theory can be applied for analyzing grinding media consumption rates in any g
Jan 1, 2014
-
1995 Federal Budget Targeting expenditure
By Robert B. Parsons
"Finance Minister Paul Martin's second budget might be good for Canada's mining industry in the long run, but the budget raises a number of concerns for the industry in the near term. The bu
Jan 1, 1995
-
Human Aspects of Automation - The Diamond Drilling Case Study
By Helen Francis
Over the last decade, lower ore grades and deeper mine environments have demanded that mining companies develop new technologies (tools and processes) to ensure a mine?s economic sustainability. At In
May 1, 2002
-
Gold Mineralization at the Anomaly A Deposit, Clarence Stream Area, Southwestern New Brunswick: Distal Deposits of a Syn-Deformational Intrusion-Related Gold System?
By M. J. McLeod, S. Watters, G. G. Lutes, S. Castonguay
"Gold-bearing mineralization at Anomaly A occurs in polydeformed Ordovician turbidites of the Kendall Mountain Formation of the St. Croix belt in southwestern New Brunswick, and is hosted by WSWtrendi
Jan 1, 2008
-
The Bethlehem Molybdenum Plant
By E. A. Lowe, A. F. Bellamy, J. W. Smith
"In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall
Jan 1, 1980
-
Elimination of the Pre-Aeration and Primary Filtration Circuits From the Dome Mill Flowsheet
"Placer Dome Inc.'s Dome Mine is located in South Porcupine, Ontario and has been in production since 1910. In the past, the mill leach circuit was preceded by preaeration and primary filtration circu
Jan 1, 1992
-
Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral Processing
By R. W. Lawrence
"In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc
Jan 1, 2007
-
Assessing the Returns to Copper Exploration, 1989-2008
By R. A. Leveille, M. D. Doggett
"Economic returns for the copper industry have been assessed by building cash flow models for each of the 100 new mines brought into production over the past 20 years. Ninety-one of the 100 new mines
Jan 1, 2009
-
Model-based control of column flotation: Toward industrial application and real-time optimization
By André Desbiens, Jocelyn Bouchard, René del Villar
"The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la
Jan 1, 2003
-
Mine Site Hydrogen Storage and Delivery Model
By M. C. Bétournay
Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A
May 1, 2007
-
Graphical-Analytical Model of the Generation of Methods and Variants of Methods of Digging, respectively of the Technologies and Technological Variants of the Execution of the Underground Mining Work
By Nicolae Dobritoiu
The literature in this field and the practical activity record that a method, respectively the technology used for an underground mining work have many components which, in order to be applied, demand
Oct 1, 2009
-
Requirements for Underground Mine Backfill Monitoring
By David O. DeGagné
While mine backfill plants are becoming increasingly more automated and instrumented, especially with paste fill operations, underground backfill distribution systems have hardly changed over the year
May 1, 2001