Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Inco roast-reduction smelting of nickel concentrate (eaf8b517-9c46-4962-8c74-3e37ab47ff1e)

    By C. Díaz, A. D. Dalvi, C. E. O'Neill

    Roast-reduction smelting (RRS) of nickel concentrate, combined with flash smelting of copper concentrate, was one of the process options that Inco considered as a means of meeting its 1994 sulphur dio

    Jan 1, 1994

  • CIM
    Economic Factors of Hydraulic Rock Drilling Equipment

    By R. G. Bradbury

    The paper uses two hypothetical, but typical, situations to show that hydraulic rock drilling equipment has very significant economic advantages over pneumatic equipment both in drifting applications

    Jan 1, 1979

  • CIM
    The Contribution of the Classifiers to Comminution and Separation Processes in Mineral Processing

    "Classification is an important aspect of mineral processing plants and if not operated efficiently can compromise both the throughput and recovery of the circuit. This paper discusses the benefits th

    Jan 1, 2016

  • CIM
    Employee assistance programs for hourly and salaried employees

    By K. MacMaster

    "This paper deals with the history, development, present and future of the Employee Assistance Programs in place at the Inco Ltd. operations in Thompson, Manitoba. It should be noted that, although ma

    Jan 1, 1989

  • CIM
    Microstructure and Corrosion Properties of Additively Manufactured Aluminium Alloy AA2024

    By N. Birbilis, S. Kairy, C. R. Hutchinson, D. Jiang, D. R. Feenstra, O. Gharbi

    "Recent developments in metal-based additive manufacturing (AM) technology have generated considerable interest in multiple industries, owing to flexibility in design and the ability to produce final

    Jan 1, 2018

  • CIM
    Precious Metals Leaching from Electronic Wastes

    By F. Rashchi, N. Naseri Joda

    Recycling of electronic wastes is an important subject both from an environmental point of view and also the recovery of valuable materials. In this research, PC board scraps were leached to recover C

    Jan 1, 2011

  • CIM
    Water quality control at Bell Mine for a supernatant discharge to Babine Lake

    By E. Goodwin

    "Maclaren Forest Products Inc.Lime is commonly used for the neutralization of acid, and the removal of heavy metals in mine waste waters. However, the precipitation of heavy metals as hydroxides must

    Jan 1, 1986

  • CIM
    Fleet imbalance and the impact on production

    By Jean-Luc Collins

    "The paper deals with the impact of fleet imbalance on a deterministic evaluation of shovel fleet productive capacity. It shows that if the fleet imbalance is overlooked, then estimated fleet producti

    Jan 1, 1980

  • CIM
    Two Dimensional Numerical Simulation of Fault Reactivation and Induced Seismicity

    By R. R. Song, Q. Li, H. Xing, X. C. Wei

    Geomechanical modelling of fault stability is an important part of CO2 capture and storage (CCS) research program to ensure its viability and long-term safety. Storage of CO2 in deep subsurface reserv

    Jan 1, 2015

  • CIM
    Electric LHD operation at Inco Limited, Ontario Division

    By M. E. Sirkka

    "INTRODUCTIONInco Ltd. has ten operating mines in the Sudbury district. Over the last ten years mining methods have changed at Inco with special emphasis on the introduction of bulk mining replacing c

    Jan 1, 1989

  • CIM
    Overcoming Challenges of Rock Mass Characterization for Underground Construction in Deep Mines

    By P. K. Kaiser, F. Amann

    "Rock mass characterization for deep underground construction and mining offers many challenges. This paper first describes some of the key challenges when characterizing highly stressed brittle rocks

    Jan 1, 2015

  • CIM
    Agglomeration of Superfine Fly Ash in High Velocity Gas Streams

    By G. K. Lee, E. R. Mitchell

    Designers of combustion processes may select aerodynamic conditions which produce only superfine fly ash. Although it is not usually anticipated that this will create a problem, such as has been found

    Jan 1, 1962

  • CIM
    The design and installation of a mine monitoring and control system

    By D. Lauzon, H. de Ruiter

    "In 1988a decision was taken to design and install a computerized mine monitoring and control system. This system had to monitor and control all pumping and ventilation underground. The operation of t

    Jan 1, 1991

  • CIM
    Recovery and of Uranium Steel

    The methods employed for the addition of uranium to steels and cast iron in the Physical Metallurgy Division are outlined. It has been found that the segregation of? uranium is a major problem in alum

    Jan 1, 1964

  • CIM
    Transforming Modern Mining

    By Paul Johnston

    or is it? Mining Automated Loader Technology Application ? Intelligent software mounted in hardware on a remotely controlled scoop. ? Led by INCO, Sudbury, with ? C-CORE, St. John?s ? Automated

    May 1, 2008

  • CIM
    Tankhouse modernization at CCR

    By J. Thiriar

    The electrolytic tan/chouse at CCR was recognized by management as lagging behind modem refineries in terms of productivity, energy efficiency and controls. The operation was also burdened by high mai

    Jun 1, 1993

  • CIM
    Beneficiation of Low Grade Manganese Ore by Jigging in a Specially Designed Ore Dressing Unit

    By Simon B. Blancher, Malo Rousseau, Renato Contessotto, Thomas Wallmach

    The Manganese division of the ERAMET group extracts manganese ore in Gabon and produces manganese alloys for the steel industry. ERAMET has an economic interest to maximize the ore throughput without

    Jan 1, 2016

  • CIM
    Ventilation Design and Operating Issues Relating to Underground Mines with High Elemental Sulphur Content

    "The ventilation-related risks from mines with elemental sulphur include dust explosions, spontaneous combustion with emission of heat and toxic sulphur dioxide or hydrogen sulphide gases, reactions w

    Jan 1, 2019

  • CIM
    Productivity and safety improvements at United Keno Hill Mines Limited

    By T. P. Riordon

    "Major swings in the silver price since 1979, along with the ever constant fight to maintain ore reserves has forced United Keno Hill Mines Limited through several unique series of events in order to

    Jan 1, 1988

  • CIM
    Coping with wall failures

    By F. J. Munn

    "Since 1976, Cardinal River Coal s Ltd. has completed mining in eight pits. In each of these pits, at least one wall has failed, none by design, although not totally unexpected, yet there was no loss

    Jan 1, 1985