Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recovery of Metallic Zinc from Steelmaking Dusts by the Reduction-Vapour Depositions Process

    The extinction of zinc from steelmaking dusts has been studied with a laboratory scale reduction-vapour deposition (RVD) process in the absolute pressure and temperature ranges of 13 - 1300 Pa and 1

    Jan 1, 1993

  • AUSIMM
    The Mineral Industry's Responsibility to the Environment - Acceptance and Performance

    For some time the-mining industry has been criticised, completely unjustifiably, by certain people who style themselves conservationists but are actually preservationists. The criticism of the minin

    Jan 1, 1971

  • AUSIMM
    Boundary Classification for Automated Geological Modelling

    By P Hatherly, A Melkumyan, D Wyman

    Chemical species distributions in rock sequences can be modelled using Gaussian processes (GPs) to predict the weight percentage between known data points. This method can be improved by dividing the

    Sep 26, 2011

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and control

    By M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy

    Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a

    Aug 29, 2018

  • AUSIMM
    Dry versus Wet Magnetic Separation – Horses for Courses

    By J Elder

    Magnetic separation equipment has long been used to upgrade and beneficiate a wide variety of minerals and materials. Over the years, significant advances in both wet and dry magnetic separators have

    Oct 5, 2011

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    ROES« û A Low-Cost, Remotely Operated Mining Method

    By A Castleden, G Cavanough, M Kochanek, J Cunningham

    ROES« is a proposed new mining system for underground hard rock mines. Ore is accessed from within a shaft, which is located close to or within the stope, and pitched either vertical or within approxi

    Jan 1, 2008

  • AUSIMM
    Application of Risk-Cost-Benefit Analysis to Highway Subsidence Due to Mining

    By J Joy, A Bye, G V. Kizil

    This paper demonstrates an application of a recently developed Risk-Cost-Benefit (RCB) Framework to environmental risk management in the mining industry. The environmental application of the RCB Frame

    Jul 10, 2012

  • AUSIMM
    The Preparation of Pastefill and its Use at Some Canadian Mines (6e4bc1a5-4335-470a-b421-2dd830dbe3e2)

    Two key elements in the design of a pastefill or high density hackfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owin

    Jan 1, 1998

  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022

  • AUSIMM
    Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes

    By M Allen

    Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta

    Aug 8, 2011

  • AUSIMM
    Creating the Optimal Coal Working Section

    By P Lukic

    The definition of the working sections that will be used in a mine is usually initially made in the field by the geologist supervising the drilling program. These initial definitions are often made on

    Sep 26, 2011

  • AUSIMM
    Improving Blasting by a Team Approach at the Henty Gold Mine

    By R Wedmaier

    Henty Gold Mine is an underground operation producing 100 000 ounces of gold per annum. The original mining method used was flatbacking with paste fill. However, a non-entry method û uphole benching û

    Jan 1, 2001

  • AUSIMM
    Consideration of asymmetric drive geometry and conditions on the loading capacity of pastefill barricades

    By M Revell, B Sainsbury, D Sainsbury

    This paper extends the existing knowledge associated with the design and placement of prefabricated pastefill barricades through a consideration of asymmetric drive geometry and conditions. The load c

    Nov 29, 2022

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • AUSIMM
    A Study of Anomalous Copper-Lead-Zinc Values in Relation to Rock Types and Weathering Profiles in an Area North of Mount ISA

    In an area north of Mowit Ica chip sampling of limonitic outcrops on a regional scale led to the investigation of a number of areas considered to be geochemically anomalous for copper and zinc. Th

    Jan 1, 1973