Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Karangahake Gold-Silver Deposit
The Karangahake gold-silver deposit is located 11 km west of Waihi in the southern part of the Hauraki Goldfield. Historically it was the second largest bullion producer in the goldfield with a past p
Jan 1, 1987
-
Drawbacks in Sluice box operating Practices in Papua New Guinea
Sluice box operating practices in Papua New Guinea (PNG), and published work on sluice boxes are briefly reviewed. Some recent work on sediment entrainment mechanisms occurring in sluice boxes hav
Jan 1, 1991
-
Tapping Water by Diamond Drill Holes
ON mineral lease 38 of the Sulphide Corporation Limited, Broken Hill, a shaft was sunk in the early days Ior prospecting purposes and at the present time it is accessible as far as the 1000-ft. level
Jan 1, 1919
-
Implementation of Fine-Screening in Preparation of KGHM PM SA Sandstone-Carbonate Copper Ore for Flotation
Implementation of Fine-Screening in Preparation of KGHM PM SA Sandstone-Carbonate Copper Ore for Flotation
Sep 13, 2010
-
Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real Options
By H M. Ahmed, W S. Dunbar
Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of
May 9, 2016
-
Permitting the Grey River Dredge
By E Breese
The Grey River dredge is the first large scale alluvial operation to be permitted under the Mining Act 1971 and the Water and Soil Conservation Act 1967. The experience of Grey River Gold MiningLimite
Jan 1, 1989
-
In Situ Rehabilitation of Concentrate Tailings at Macraes Mine: A Contingency Option
By D Craw, D Wilson, D Chappell
Gold is extracted by cyanidation of a sulphide-rich concentrate at Macraes mine, and after cyanidation, the concentrate is discharged to tailings impoundments. The concentrate tailings were discharged
Jan 1, 1998
-
Some Notes on Dry Crushing.
The sphere of operations of dry crushing has been so much enlarged of late years that the following notes with reference to its advantages and limitations, and also some practical results in connectio
-
Features of the New Lead Refinery at Port Pirie
A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the
Jan 1, 1963
-
Analysing and Rehabilitating Rock Mass Failure in Critical Mine Infrastructure
To optimise the haulage of the large tonnages produced from stopes in this high production gold mine, an ore pass and feeder system was introduced. This ore pass was designed and developed in 2006 and
Nov 25, 2010
-
Pilot Plant Testing in Mineral Process Plant Design
By Dunlop GA
Pilot Plant confirmatory testing of the treatment route developed in the Metallurgical Laboratory is an essential factor in the development of complex ore bodies. Objectives should be well defined t
Jan 1, 1990
-
A comparison of X-ray and electron-based analysis techniques for characterising the mineralogy and alumina distribution in iron ores
By M I. Pownceby, C M. MacRae, A Torpy
Electron probe microanalysis (EPMA) and quantitative X-ray diffraction (QXRD) techniques are capable of providing high-quality quantitative information regarding the phase mineralogy and distribution
Jul 24, 2017
-
Performance of Model Predictive Control on the Crushing Circuit at Sishen Mine
By E K. Leeka
Process control limitations have led to suboptimal performance of the crushing section of Sishen MineÆs Jig Plant. The performance of the PID (proportional-integral-derivative) controller implemented
Aug 12, 2013
-
The Gold-Antimony Veins of Costerfield, Victoria
THE township of Costerfield is situated in the parish of Costerfield, county of Dalhousie, and lies 6 miles east of Heathcote and 30 miles south-east of Bendigo. It is separated from Heathcote by the
Jan 1, 1922
-
Development of an On-Site Mineralogy Solution for Metallurgists
By D van der Wal, R Dobbe, K Moeller
"Ore mineralogy and texture are primary variables controlling mill recovery efficiency in flotation plants. However, tracking daily variations of key mineralogical characteristics such as species-by-s
Jul 15, 2013
-
The Market, the Mining Geologist and Booms and Busts
After a five year period representing the strongest resource and commodity rally ever experienced, we are now faced with a subdued recovery following the global financial crisis. This renewed economic
Jan 1, 2009
-
The Thermal Decomposition of Sodium Ethyl Xanthate Adsorbed on Activated Carbon
By Chamberlain A. C, Fisher N, Avraamides J
The thermal decomposition of sodium ethyl xanthate (SEX) adsorbed onto activated carbon was studied by coupled thermogravimetric analysis-Fourier transform infrared spectroscopy (TG-FTIR). Two disc
Jan 1, 1996
-
Rock Mass Classification is Only Part of the Answer to Assess Raise Boring
By J Wallis
The stability of a raise bore is often assessed using the rock mass classification system published by McCracken and Stacey as a modification of the Q system. Often the assessment is done using a spre
Jan 1, 2008
-
Property Rights and Mineral Law Reform
In understanding the consequence of existing law, and the likely implications of its reform, it is necessary to comprehend the logic of the situation that the law provides individual decision makers a
Jan 1, 1988
-
The North Lyell Tunnel, Tasmania
THIS tunnel, which is an adit 7000 ft. long, was undertaken by the Mount Lyell Mining and Railway Company Limited to connect its treatment works with the North Lyell mine at depth, with a view to effe
Jan 1, 1929