Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Wakamarina Gold-Scheelite-Quartz Lodes, Marlborough, New Zealand (9bf77519-b580-47e8-9eb8-9b83d23a66f7)

    By Brathwaite RL

    The gold-scheelite-quartz lodes of the Wakamarina valley were the most productive of the mesothermal gold-bear in the Marlborough Schist. Most of the production came from the Empire City and Golden Ba

    Jan 1, 1995

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre Reinforcement

    By R Winterberg

    Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special

    Mar 8, 2011

  • AUSIMM
    Study on Improving Roasting Behaviours and Metallurgical Properties of Brazilian Hematite Pellets by Adding Magnetite with High Sulfur Content

    By Z Li, J Pan, D Zhu, W Zhou

    In order to enhance the roasting behaviours and metallurgical properties of hematite pellets, which have the problems of high roasting temperature and low compressive strength, a process of producing

    Aug 12, 2013

  • AUSIMM
    Computerised Underground Diamond Drilling

    Diamond drilling is a relatively new commodity in terms of drilling. The first known diamond drilling activities were carried out in the Swiss Alps around 1863 when the Swiss engineer M Leschot des

    Jan 1, 1995

  • AUSIMM
    Stratigraphy and Geochemistry of the Flynn Subgroup Volcanic Rocks

    By Morrison R. S, Doennilan N

    Recent mapping (1989-1992) by the Northern Territory Geological Survey in the Tennant Creek 1:250 000 map sheet area has resulted in substantial revision of the lithostratigraphy of the Tennant Cre

    Jan 1, 1994

  • AUSIMM
    The Weipa Kaolin Project (37afd6f9-e7cd-4419-b3aa-f6892748e3dc)

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operations at Weipa. The plant will produce 100,000 tonnes p

    Jan 1, 1988

  • AUSIMM
    Flotation as an Operation of Macromolecular Mass Transfer

    By M R. Drumond

    The present work presents a new theoretical interpretation of the flotation process, which can also be applied to other mineral processing physical unit operations. This interpretation is part of the

    Jan 1, 2005

  • AUSIMM
    Towards an Integrated Framework for Asset and Process Health Monitoring and Optimisation on a Milling Circuit

    By G T. Jemwa, F Rousseau, F J. Wolfaardt, J A. M Rademan, P W. Smit

    Mining companies are increasingly faced with the challenge of reducing operating costs while maximising throughput and profitability. At the same time, the grade and quality of treated ores are becomi

    Sep 26, 2013

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    A Due Diligence Approach to Environmental and Social Business Performance Assessment

    The modern resource extraction enterprise is a complex capital intensive business operating in a world of constantly evolving social, environmental and economic scrutiny. Investors, government, media

    Jun 1, 2010

  • AUSIMM
    Coal in the Context of Sustainable Development ù Implications for the Minerals Industry

    The concept of æsustainabilityÆ can largely be defined as development that will not compromise the ælivabilityÆ of the planet for future generations. It has multiple dimensions, such as the triple bot

    Jan 1, 2004

  • AUSIMM
    Assessment of main factors contributing to the height of fracturing above longwall panels – a review and case-based numerical study

    By M W. Chen, I Canbulat, S Saydam, C G. Zhang

    The height of fracturing (HoF) measures the propagation distance of continuous fracturing from the mining horizon and is also termed the height of cracking (Hebblewhite, 2020; Khanal et al, 2019) or h

    Nov 29, 2022

  • AUSIMM
    A waste fines cell with a multitude of concurrent activities

    By J J. Boshoff

    This iron ore mine site, located in the Pilbara region of Western Australia, commenced operations in 1998, with ore derived by mining of open-cut pits in Channel Iron Deposits (CIDs). A portion of the

    Jul 23, 2018

  • AUSIMM
    Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block Cave

    Optimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in

    Jan 1, 1995

  • AUSIMM
    Resource Saving Technology of Comminution

    By Yeliseyev AK, Shestakov AM

    Comminution is the most power-intensive process in the technology for ferrous quartzite concentration. That is why improving comminution efficiency leads to the most appreciable economic effect on

    Jan 1, 1993

  • AUSIMM
    Oxidation of Zinc Sulfide in a Fluidised Bed of Very Low Oxygen Concentration

    By Miyatani J. Asaki Z, Kondo Y

    The oxidation of sphalerite particles of 60 to 100 mesh size was studied in a fluidized bed of low 02 concentration at 900¦C. Par- tial pressure of 02 in the fluidizing 02-N2 gas mixture was chosen

    Jan 1, 1980

  • AUSIMM
    An Introduction to the Planning of Development of the Brown Coal Open Cuts of the State Electricity Commission of Victoria

    The brown coal resources of the Latrobe Valley, which include over thirty thousand million tons of coal suitable for open cutting, provide the main source of fuel for the power generation for the Stat

    Jan 1, 1960

  • AUSIMM
    Determining Gold Particle Size in Gravity Ores for Sampling and Metallurgical Characterisation - Discussion and Test Protocol

    Sampling protocols and metallurgical flow sheets should be designed to suit the style of mineralisation in question. In support, the a priori need for evaluation programs is the characterisation of th

    Aug 1, 2010