Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds
The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise
Jan 1, 1998
-
Broken Hill Vughs-Occurrence and Some Probable Causes
Although these subterranean cavities are common to the Broken Hill big lode, yet the Broken Hill Proprietary is the most prolific in their occurrence, loud they have been found of various dimensions a
-
Summary of results of an international X-ray diffraction round robin for mineralogical analysis of iron ores
By S L. Birch, M D. Raven
X-ray diffraction (XRD) is a well-recognised, invaluable tool to provide detailed mineralogical analysis on a wide range of applications. However, despite the wide use of XRD in many industries, there
Jul 24, 2017
-
Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002
The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must
May 1, 2010
-
The effect of high geo-temperature environment on spontaneous combustion – an experimental study
By Y Xiao, C Lei, C Shu, W Wang, K Wang, J Deng
To investigate the effect on coal spontaneous combustion with high geo-temperature, an experimental apparatus was developed to measure characteristic parameters of two kinds of coal samples at differe
Aug 28, 2017
-
Some Calculations Dealing with Mine Timber
ONE of the phases of mining wide ore-bodies, such as are found in Broken Hill, is the laying-out and design of the sill floor gangway timber, When, in the above operation, a detail has to be repeated
Jan 1, 1923
-
Design and Engineering of Flotation Circuits (in Australia)
By D Mcleod, S Brindley, S Green
The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit
Jan 1, 2005
-
Managing the Transition from Exploration to Feasibility and Project Development
The transition from exploration to feasibility is a stage in the development of mineral resource projects that is frequently not handled well. The transition marks a point in the project development p
Jan 1, 2004
-
Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in Jarosite
By A M. L Smith, W E. Dubbin, K A. Hudson-Edwards
Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an
Jan 1, 2008
-
Mount Morgan Limited Gold Clean-up Practice at Oxide Mill
At the present time this plant is treating by direct cyanidation 1,000 tons of ore from Open Cut mining and dumps, and 1,200 tons of current flotation tailing obtained from the Sulphide Mill, per day.
Jan 1, 1939
-
-
How Can You Get Mining Equipment to Work to its Real Capacity?
Most mining operations have been happy to live in blissful ignorance of what their equipment is really capable of. Shareholders have been shown increasing tonnes output per employee (due to rationalis
Jan 1, 2009
-
A National Code for Reporting Coal Resources and Reserves
In November 1986 the Australian Minerals and Energy Council (AMEC) endorsed an "Australian Code for Reporting Identified Coal Resources and Reserves" for use by the Federal and all State Governments
Jan 1, 1987
-
Repartitioning of River Water Trace Metals Following Addition of Minor Amounts of Ferrous Iron
By K Hskansson
In earlier studies along a mining region recipient (the river VormbScken, northern Sweden), the fraction of certain trace metals recovered in the particulate phase has been found to increase with incr
Jan 1, 2003
-
-
The Building Stone Industry - Its Resurgence in Otago
Dimension stone is the term generally given to rock used in building construction. During early European history in Otago, locally available dimension stone products were easily obtained. Crude rock s
Jan 1, 1992
-
Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’
By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler
The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w
Aug 29, 2018
-
Effects of Acidity on Bacterial Sulfate Reduction and the Bioprecipitation of Metals in Groundwater
By B M. Patterson, A J. McKinley, M E. Grassi
Large-scale column experiments were undertaken to determine the effect of a step decrease in groundwater pH on metal remediation by bioprecipitation. Metal contaminated groundwater at pH 5.5 was amend
Jan 1, 2004
-
Maintaining Operational Competitiveness in the Australian Open Cut Coal Industry
Faced with low prices and weak demand in an oversupplied market, the Australian coal industry must seek to further reduce its costs. The paper examines minesite competitiveness of the open cut coa
Jan 1, 1987
-
Can robots break the drill and blast bottleneck in underground roadway development in hard rock?
By M Berner, N A. Sifferlinger, E Fimbinger
Today, the advance rate of underground roadway development by drill and blast operation is limited by the need to ventilate the toxic blast fumes after each cycle. In deep mines this usually is only p
Sep 1, 2024