Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development of the Rainy River Gold Project and Processing PlantBy Paolo Toscano, Dave Hall
"This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m
Jan 1, 2016
-
An Automated Approach to Blast Optimization Through Performance Monitoring of Blast Hole Drills and Mining ShovelsBy M Scoble
This paper will report on the application of data collected through the performance monitoring of large diameter surface rotary blasthole drii and electric mining shovels, in an integrated approach to
Jan 1, 1992
-
Measurement Of Typical Joint Characteristics In South African Gold Mines And The Use Of These Characteristics In The Prediction Of Rock FallsBy H. Gumede
The occurrence of fracturing due to high stress levels is a major factor in hangingwall stability in deep level gold mine stopes. However, rock falls cannot be the result of these fractures alone. Roc
Jan 1, 2007
-
Bias testing of cross-belt samplers - SynopsisBy G. Lyman
The cross-belt sampler is a device that is very widely used even though it has not been ratified by the Standards associations. This paper is concerned with the bias testing of two cross-belt sampler
Jan 1, 2010
-
Developing a Softwall Mining MachineBy K. S. Mortensen
The softwall mining system is a novel, new method of mining mineral deposits in soft, shallow, nonrock ground conditions. This method can mine the ore layer without substantially disturbing the exist
Jan 1, 2003
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay CampusBy Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Removal of Hg(II) from Aqueous Solutions Using Spent GrainBy Liyuan Chai
In this study, spent grain was used as an adsorbent for the removal of Hg(II) from aqueous solutions, the process parameters such as contact time, solution pH, adsorbent dose, and initial Hg(II) conce
Jan 1, 2009
-
The Production of Gold in AustraliaGOLD has played a part in the development of Australia. The total yield exceeds SIX hundred million pounds sterling, while the glamour of gold-mining and the unfailing demand for the product have enha
Jan 1, 1924
-
Comparison of stereological correction procedures for liberation measurements: discussionBy C. L. Schneider, C. O. Gomes, R. P. King, J. A. Finch, D. Lin
Discussion is presented by Prof. King and Dr. Schneider of the paper by Lin, Gomez and Finch published in Trans.IMM C, vol.104, 1995, p.C155-C161. They conclude that the correction procedures used for
Jun 19, 1905
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Sulphuric Acid Production at Port PirieThe production of sulphuric acid at Port Pirie by the contact process began in March 1924 with the commissioning of the Electrolytic Zinc Co.'s roasting and acid plant. This plant, operated by B.
Jan 1, 1956
-
Interlocking Caisson WallsBy William E. Lardner
Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi
Jan 1, 1987
-
Modification Of Waelz Kiln Processing Of La Oroya Zinc FerriteBy P. C. Holloway
La Oroya zinc ferrite (19.5% Zn, 26.6% Fe, 0.052% Ga, 0.075% In) was roasted with coal under conditions more oxidizing than normally used in a Waelz kiln, and the roasted residues were leached with 20
Jan 1, 2008
-
RI 5961 Behavior Of Clays Associated With Low-Rank Coals In Coal-Cleaning Processes ? Introduction And SummaryBy H. F. Yancey
About 65 percent of the more than 400 million tons of coal produced annually in the United States is mechanically cleaned to remove the inorganic impurities before being sent to market. The impurities
Jan 1, 1962
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
Preparation of Iron Oxide Feed Stock for Pig Iron/Sponge Iron Production - Role of NMDCBy Sahoo K. C
Traditionally, the blast furnace (BF) has maintained a dominant position as the primary source of iron units. Notwithstanding the efficient nature of the process in respect of its material and energ
Jan 1, 1999
-
Correct Identification Of Chrysotile Asbestos In OresBy Allison
During the 1980’s, laboratories opened throughout the United States to serve the analysis needs of a rapidly growing asbestos abatement industry. The samples analyzed were either collected during the
Jan 1, 2005
-
CrusherMapperTM - A New Tool for Crusher Condition MonitoringCrusherMapperTM - A New Tool for Crusher Condition Monitoring The efficiency of mineral processing plants is entirely dependent on the availability of the plant equipment critical path. This typicall
Sep 13, 2010
-
Experiences with Underground Sampling of Emplaced Hydraulic FillThe methods and equipment developed and used at the Mount Isa mine to obtain samples of uncemented hydraulic fill lying above major horizontal pillars are described. From existing underground developm
Jan 1, 1976