Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    Anglo Platinum Extra Low Profile (XLP) Mechanised Equipment Implementation ? An Update - Synopsis

    By GA Harrison

    The introduction of Extra Low Profile (XLP) mechanised equipment within Anglo Platinum is aligned with the overall New Mining Technologies strategy to focus on continuing modernization of our mining

    Jan 1, 2008

  • SAIMM
    Numerical modelling of brittle rock failure using a combined finite-discrete element approach: implications for rock engineering design

    By R. J. Pine, J. M. Rance, J. S. Coggan

    ABSTRACT: The safe design of excavations created in a fractured rock mass is of paramount importance in rock engineering. Depending on the nature of the stress regime acting on an excavation, and the

    Jan 1, 2003

  • AUSIMM
    Enhancing magnetite concentrate granulation by blending with hematite ore

    By J Addai-Mensah, M Adam, W Skinner, J Begelhole, K Quast

    Granulation of iron ore fines into robust granules is critical to successful sintering and blast furnace operations in iron and steelmaking. Iron and steelmakers desire iron ore granules with high str

    Jul 24, 2017

  • SAIMM
    DC Arc Smelting Of Silicon: Is It Technically Feasible?

    By M. Abdellatif

    Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p

    Jan 1, 2011

  • CIM
    Risk Assessment Applied to Excavation Ground Support

    By William Pitman

    Ground instability and subsequent rock falls are a major concern in underground mines. As a result, several mining companies are conducting risk assessments of the ground support installed in their mi

    May 1, 2004

  • SME
    Assessment Of Potential Groundwater Flow Within Sub-Permafrost Groundwater At Red Dog Mine, Alaska

    By J. Kulas, J. Weaver, K. Hagley

    An assessment of potential groundwater movement beneath the tailing impoundment at the Red Dog Mine was performed, and has indicated a unique aquifer situation within sub-permafrost groundwater at the

    Jan 1, 2002

  • SME
    Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3

    By Yifan Ding, Shemek Oginski, Patrick Finn

    The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,

    Jan 1, 2007

  • CIM
    Application at Ok Tedi Mining of a Neural Network Model within the Expert System for SAG Mill Control

    By Murray Wood, Michael Schaffer, Makat Katom

    "An expert system applied to the control of mineral process unit operations is, by its nature, the site best operating practice, having been designed by the local experts in conjunction with consultin

    Jan 1, 2003

  • SME
    A Billion Dollar Success Story Remediation And Rebirth Of The Omaha, NE Riverfront

    By J. M. Dempsey, R. A. Litle

    Asarco Incorporated’s Omaha, Nebraska refinery site and the City of Omaha’s downtown redevelopment projects are the perfect example of the marriage of the Brownfield and Sustainable Development strate

    Jan 1, 2004

  • SME
    History and Evolution of Rubber Liner Systems For Grinding Mills

    By Stuart F. McTavish

    Mechanically suitable grinding mills became available to the mining industry in 1908. Since then, mill operators have been searching for the best material and design with which to line the mills. T

    Jan 1, 1990

  • SME
    China and East Asia – Potential Resources, Specific Projects

    By William R. Yernberg

    The “China & East Asia Mineral and Energy Re-sources Symposium — CEAR 2000” was held Jan. 23-26, 2000 in Denver, CO. Conference sponsors included Resources and Technology Symposia of Colorado and the

    Jan 1, 2000

  • SME
    Challenges And Solutions To Designing Deep Excavations For Urban Transit Stations

    By Ching-Liu Wu, John Hawley, Andrew H. Liu, James Chai

    The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the

    Jan 1, 2007

  • SAIMM
    Criteria For Utilization Of By-Products From The Ferro-Alloy Industry

    By Willem C. A. van Niekerk, David A. Baldwin, Nardus Potgieter, Willie A. Gericke

    Authorities that regulate environmental issues pertaining to industrial wastes in South Africa regard landfill disposal as the only effective environmental management option for slag and other inorgan

    Jan 1, 2007

  • CIM
    The Wabush Mines Concentrator

    By Timothy R. Eby

    "The Wabush Mines project was formed in 1956 to develop a large iron ore property in Western Labrador. The town of Wabush along with the mining and concentrating facilities are located 640 air miles f

    Jan 1, 1978

  • SME
    Mini Symposium - Crushing And Grinding Large Diameter Mill Drives - Gears For Large Diameter Mills Drives

    By Russell G. Shomperlen

    Grinding mills in excess of 5 meter diameter and 3500 kilowatts per mesh are putting new demands on big gears. This paper returns to the basics of ring gear design beginning with the fundamental power

    Jan 1, 1981

  • SME
    Diesel Particulate Matter –So What’s The Big Deal?

    By E. A. Metz

    Perfect combustion in an engine would produce only water vapor, carbon dioxide and nitrogen as by-products; however, complete combustion is never achieved. As a mobile power plant, the diesel engi

    Jan 1, 2001

  • CIM
    The David Bell Mine Water Quality Management Strategy (e343643b-635a-4023-9840-0613ce7068b5)

    By K. Meyer, M. E. Goddfellow

    "At Teck-Corona Operating Corporation's David Bell Mine, a water quality management strategy is employed to produce both a chemically and biologically clean effluent prior to discharge to the environm

    Jan 1, 1991

  • SME
    Construction Of The MCUA Tunnel And Force Mains Under The Raritan River, New Jersey: A Case History

    By Bob Rautenberg

    The Construction of Tunnel and Edison Force Mains contract involves the installation of two new force mains to provide a redundant means for sewage conveyance from Middlesex County Utility Authority?s

  • TMS
    Lattice Parameter Determinations Of KNO3-NH4NO3 Solid Solutions By X-Ray Diffraction Method

    By Wen-Ming Chien

    Keywords: AN-KN Phase Transition, Lattice Parameters of AN-KN, X-ray Diffraction The lattice parameters of the low and high temperature phase of KNO3-rich (in NH4NO3) solid solutions have been dete

    Jan 1, 2005

  • IIMP
    Concentradora Atacocha: Reingeniería alta rentabilidad

    By Marcos Villegas

    El presente texto describe el desarrollo del sistema de gestión de riesgos en la reingeniería de procesos, justificando la inversión en gestión de riesgos de la concentradora Atacocha donde se protege

    Sep 9, 2007