Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)By C. R. Edwards
"The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U
Jan 1, 2002
-
The Cinola Project, Process and EnvironmentBy C. J. A. Davie
"SUMMARY A practical application of nitric acid oxidation of sulphides, based on the principles of the Arseno process, has been developed for the Cinola ore. Development of the process has been based
Jan 1, 1989
-
The circumstances, events and politics leading the closure of the U.S. Bureau of Mines ? was it the correct decision?By J. Harrison Daniel
Were the legislators and politicians responsible for the closing of the U.S. Department of the Interior?s Bureau of Mines (Bureau) in March 1996 fully aware of what they were doing? Throughout the Uni
Jan 4, 2010
-
The CMI NESA Pyrolysis, An Attractive Process For The Treatment Of Sewage And Industrial Sludge And By-ProductsBy Paul-Dominique Oudenne
For many years, CMI NESA has gained considerable experience in the field of alternative thermal processing processes by which useful by products result in addition to the destruction of the raw wastes
Jan 1, 2006
-
The Coal Cleaning Plant at Michel, B.C.By Paul F. Grundy
The ever changing conditions in the coal-mining industry and the increasing competition of other fuels such as oil, natural gas, wood refuse, etc., have made it imperative that the coal operator be in
Jan 1, 1934
-
The Coal Industry of New South WalesAs it is probable that a large proportion of the members of the Institute attending this meeting are connected with the metalliferous side of mining, the writer thought that, as coal and coke are requ
Jan 1, 1918
-
The Coal Mining Industry - Bituminous Output Gains - More Mechanization and Cleaning - Better PlanningBy Eugene McAuliffe
AS this is written, the probability A is that the bituminous coal out- put for 1936 will approximate 420,000,000 tons (of 2000 lb.) with an average working time for all mines of 205 days. The results
Jan 1, 1937
-
The Coal Mining Industry ? Foreword - More Mechanization and Improved Preparation Seen - Economics Studied on Wide Front - New LegislationBy J. B. Morrow
BITUMINOUS COAL production for 1937 up to Nov. 27, was 400,000,000 ions, an increase of 3.43 per cent over the comparative period in 1936. The in- crease in consumption, however, was not so great as t
Jan 1, 1938
-
The Coal Problem of SaskatchewanBy E. W. Garner
THE greatest problem confronting business managers in modern times is not production, but distribution. It would be easy to expand productive output, but it is difficult to find markets for all that i
Jan 1, 1936
-
The Coal Quality Expert: Introduction To The Acid Rain Advisor (beae044d-7b5d-4d01-8abc-f3b7c00f313b)By C. D. Harrison
The 1990 Clean Air Act Amendments specify national objectives for reducing sulfur dioxide emissions from coal-fired power plants System-wide reductions can be achieved by combining various emissions c
Jan 1, 1992
-
The Coal Quality Impact Model, On-Line Analysis And Linear Programming For SO2 Compliance Optimal Utility Fuel Planning In The Competitive 1990'sBy C. K. Blankenship
The competitive forces now driving the electric utility industry and the constraints of regulation at all levels are changing the way we will all do business now and into the next century. Utilities a
Jan 1, 1995
-
The coarse particle recovery processBy G. S. Hill, B. J. Huls
This paper on coarse particle recovery (CPR) summarizes a process to capture coarse particles that are not recoverable by regular flotation. Several porphyry copper operations in the world operate ana
Jan 1, 2006
-
The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of ViewThe objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference
Jan 1, 2008
-
The Composition of Ore from the Lloyd Copper Mine, Burraga, N.S.WIn an earlier paper (Stanton, 1953) a brief account was given of the geological environment and structure of the Lloyd Copper Mine orebody, Burraga, N.S.W. The present paper is concerned with the chem
Jan 1, 1955
-
The Composition of The Lead-Zinc Ores at CaptainÆs Flat, NSWThe following observations on the mineral composition of the lead-zinc ores at Captain's Flat, New South Wales, are based upon the examination of a collection of specimens made during a brief vis
Jan 1, 1943
-
The Computerised Evaluation of Mining Data at MacraesA Sun SPARCstation based computer network is utilised to store and process mining data at the Macraes Gold Mine. Techbase and Medsystem software running on the SunOS unix platform is used to generate
Jan 1, 1992
-
The Computerized Design Program for Tunnel BlastingBy Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim
In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model
Jan 1, 2005
-
The Concentration of Ore from the Read-Rosebery Mines of Electrolytic Zinc Company of Australasia LimitedDESCRIPTION OF OREThe ore consists, in general, of a very finely grained mixture of sphalerite, galena, and pyrite, with a gangue of quartz and schistose material, and contains about one ounce of silv
Jan 1, 1927
-
The Concurrent Construction Of Two Side By Side Declines Utilizing An Atm-105 Road Header As The Primary Means Of ExcavationBy A. J. Dudzik
In 2006 Arch Materials initiated the development of an underground limestone mining complex. The decision to proceed with the project was the end result of several years of market research and geologi
Jan 1, 2010
-
The Construction And Performance Of Prestressed Ground Anchors In Soils And Weak Rocks: A Personal Overview - SummaryBy Donald A. Bruce
The paper reviews aspects of the construction and performance of prestressed ground anchors installed in soils and weak rocks. Attention is focused on good practice for drilling, tendon fabrication an
Jan 1, 1991