Search Documents

  • CIM
    Innovative Digital Instrumentation for Geotechnical Monitoring Systems

    By A. J. Hyett

    Due to the ongoing revolution in electronics and communications more cost-effective geotechnical instruments can be manufactured using digital technology. This new generation of digital instruments ha

    Oct 1, 2004

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • CIM
    Mineralogical Evaluation of Au-Sb-As Mineralization from the ADMW Zones, Clarence Stream Property, New Brunswick

    By Louis J. Cabri, Donald Hoy

    "Samples with contrasting gold mineralization were studied quantitatively prior to metallurgical tests. The AD samples are coarser-grained and characterized by abundant Sb minerals (jamesonite, berthi

    Jan 1, 2007

  • NIOSH
    Roof Monitoring in Limestone-Experience with the Roof Monitoring Safety System (RMSS)

    By Thomas E. Marshall, Michael Dunn, L. J. Prosser, Anthony T. Iannacchione

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) examined and characterized conditions at a majority of the undergroun

  • AIME
    Institute of Metals Division - Strain Measurement on Wires at High Temperature (TN)

    By T. Price, H. A. Holl, A. P. Greenough, A

    UdIN, Shaler, and ulff' first used wires for the determination of the surface energy of a solid metal. A gage length was marked by tying knots in the wires, which were then suspended in a cylinde

    Jan 1, 1964

  • NIOSH
    OFR-107-80 Design And Develop Standardized Controls In Roof Bolting Machines - Preliminary Design

    By Terry L. Muldoon

    The report describes the development of preliminary requirement specifications for standardized operating controls for roof bolting machines used in underground coal mining. According to recent st

    Jan 1, 1980

  • AUSIMM
    Environmental Issues Deriving from the Energy Winning Activities in the Gippsland Basin

    By Grynberg H, Lindon P, Wardrop J

    The Gippsland Basin is unique in Australia in that it is a major resource based industry centre within a sensitive and special environmental context supplying Melbourne, a major urban/industrial en

    Jan 1, 1992

  • SME
    Allegheny River Tunnel Crossing Project

    By Paul A. Roy

    The North Shore Connector Project for the Port Authority of Allegheny County constructs twin Tunnel Boring Machine (TBM) tunnels through cohesive soils and rock beneath the Allegheny River and a narro

    Jan 1, 2008

  • SME
    Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38

    By J. S. Peterson, G. P. Cole

    The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll

    Feb 24, 1997

  • ISEE
    Journal: 100 Years / The Colliery Guardian London July 15, 1904

    By Robert Hopler

    In accordance with the 57th section of the Explosives Act, 1875, the following report on the working of the Act during the year ending December 31, 1903, is submitted. There have been no modifications

    Jan 1, 2006

  • AUSIMM
    Taxation of Mineral Mining Operations in New Zealand

    Consents Required for Overseas Persons Overseas Investment Regulations 1

    Jan 1, 1982

  • AUSIMM
    Study on Basic Theory of the Grain Settlement in Fluidised Bed

    Study on Basic Theory of the Grain Settlement in Fluidised Bed This paper takes thick goal grains (less than 1.5 cm) as research object. According to different densities and particle sizes, thick goa

    Sep 13, 2010

  • AUSIMM
    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Real-Time Integration of Mining and Metallurgical Information for Efficient Use of Energy and Water

    Sep 13, 2010

  • ISEE
    Determination of the Dynamic Uniaxial Tensile Strength of Laurentian Granite Using an Explosivesly-Impacted Hopkinson Pressure Bar

    By P D. Katsabanis

    The dynamic tensile strength of geomaterials is known to be highly dependent on the strain rate of the load applied. This is significant in applications where the material is subjected to shock waves

    Jan 1, 2010

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • SAIMM
    Utility-based framework for optimal mine layout selection, subject to multiple-attribute decision criteria

    By F. M. C. C. Vieira

    Four mining alternatives for exploiting an ultra-deep orebody were assessed through a multidisciplinary evaluation process which involved: the generation of a 3D geological model; the design and sched

    Jan 1, 2003

  • AUSIMM
    The Uses of Polyacrylamide Flocculating Agents at Risdon, Tasmania (a9bd0f1a-dda5-4c15-9aa4-94f6b560e7cd)

    Polyacrylamide flocculating agent has been used in the Leaching Division 'of the Risdon Works of the Electrolytic Zinc Company of Australasia Limited since October, 1960. The number of thickeners

    Jan 1, 1963

  • AUSIMM
    A Petrographic Basis for Classifying Australian Coals

    The proposed classification scheme is based on two primary parameters, one for petrographic composition and the other for rank, both being determined with microscopic techniques. The scheme has been a

    Jan 1, 1970

  • SME
    Dewatering, Interpretation Of Landform, And Installation Of Steel Arches For Reinforcement Of Tunnel Section

    By D. J. Gilbert

    As a preventive action, the geotechnical department at the mine analyzed the original topography overlying a conveyor tunnel at the mine. Several dewatering drains were installed to intercept water co

    Jan 1, 2011

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011