Search Documents

  • SME
    Eskay Creek Mine and Mill – A Continuing Success

    By Garry Biles

    The Eskay Creek Mine is a high-grade gold and silver underground mine in northwestern British Columbia. The mine started operations in late1994. For the first three years, ore was crushed to -50 mm(-

    Jan 1, 2000

  • CIM
    Combining Dynamic Logistics Simulation with Process Modeling to Support Capacity Expansion Studies: Experience at ArcelorMittal Mines Canada Pellet Plant

    By Jean-Pierre Côté, Alexandre Noiseux

    "Hatch and ArcelorMittal Mines Canada have combined their expertise to develop a dynamic model of the latter’s Iron Ore Pellet Plant in Quebec, Canada. This model was used to predict the benefits of d

    Jan 1, 2010

  • CIM
    Sélection optimale des quantités d'explosifs basée sur des contraintes de production et un résultat d'analyse de régression multiple

    By J. L. Collins

    "Une recherche debutee en 1987 tente de cerner divers éléments ayant un impact sur la productivite miniére, de facon à améliorer la planification des operations souterraines. II a été possible de recu

    Jan 1, 1990

  • AUSIMM
    The Effect of Ionic Contaminants on the Setting Behaviour of Geopolymeric Gels

    By J S. J van Deventer

    Geopolymerisation is a new technology that processes and transforms aluminosilicate minerals into mechanically strong and chemically stable products. In this investigation, minerals such as fly ash an

    Jan 1, 2000

  • CIM
    An Update on Reaching Nameplate Throughput and Continuous Improvement at Mount Milligan

    By J. Yue

    "Mount Milligan mine is located in northern British Columbia. The concentrator employs conventional SABC grinding circuit with bulk sulphide flotation processes. Commissioning started in September of

    Jan 1, 2017

  • AUSIMM
    Characteristics, Timing and Formation of Diatreme Breccias at the Kelian Gold Deposit, East Kalimantan, Indonesia

    By J B. Gemmell, D R. Cooke

    Recent mapping at the Kelian epithermal gold deposit in East Kalimantan, Indonesia has delineated intrusive and extrusive-phreatomagmatic breccias, their magmatic roots, and late-stage endogenous dome

    Jan 1, 1999

  • CIM
    The Need to Innovate: Celebrate the Past....Look to the Future

    By Dominic Fragomeni

    "The mineral processing industry has had a long history of innovation that is recognized but not often celebrated. These include significant advances in mineral measurement, testing, comminution, min

    Jan 1, 2017

  • SME
    Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)

    By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang

    Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak

  • CIM
    Use of gravity drainage and quasi-homogeneous dykes for containment of oil sand tailings (df9a2317-173a-4976-8412-bf4feb957a4f)

    By L. Nichols, H. Keele, K. Czajewski

    "The oil sands industry in northern Alberta disposes of the by-products of bitumen extraction into tailings ponds. The mix of tailings sand and mature fines, with gypsum added as a flocculent, constit

    Jan 1, 2008

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • NIOSH
    OFR-26-86 Development Of The Claw Hammer Scaling Tool

    By James D. Eklund

    Towards the goal of improving safety, economy and efficiency of scaling in underground metal/nonmetal mines, Battelle developed a combination prying/hammering scaling tool. A prototype was subject

    Jan 1, 1983

  • IIMP
    Aplicación del Sistema MIMS a Estadísticas de Producción en la Planta de Cerro Verde

    By José Arango

    El presente texto describe la aplicación del sistema MIMS en las estadísticas de producción de la Sociedad Minera Cerro Verde S.A. El sistema fue instalado inicialmente para el control de mantenimient

    May 25, 1998

  • SAIMM
    Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor

    By A. Bascetin

    One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g

    Jan 1, 2007

  • IIMP
    Innovación en Voladura Detonadores Electrónicos Sociedad Minera Cerro Verde

    By Gualberto Salas Torrelly

    El avance tecnológico en los sistemas de iniciación en voladura abarca desde el sistema convencional (Mecha de Seguridad y Fulminantes hasta el sistema de iniciación electrónica, donde a través de un

    Sep 12, 2005

  • SME
    Importance Of Iron Oxides As Carriers For Heavy Metals In Contaminated Soils And Prospects For Their Separation

    By H. Hoberg, M. Langen, B. Hamacher

    Since the term "abandoned hazardous sites" was first coined in the 1978 environmental report of the Council of Environmental Specialists, a number of different types of technology has been developed i

    Jan 1, 1995

  • SAIMM
    Air Pollution Control System Upgrade At Tubatse Ferrochrome

    By Luthie Els, Chris Coetzee, Roedolf Koekemoer, Casper Els, Olof Vorster, Frank Fereday

    Three electric arc furnaces (EAFs) were constructed by Union Carbide at Tubatse Ferrochrome (TFC) in1975. This plant was expanded to four furnaces at the East Plant in 1985 and the gas cleaning system

    Jan 1, 2007

  • ISEE
    Overburden Blast Cast Designs, Economics and Case Histories

    By Conny Postupack

    The first principle one usually learns about blasting is that competence in this field is best gained by experience in making blasts rather than by reading a book or by listening to a lecture. The rea

    Jan 1, 1991

  • CIM
    Sustainable Development Perspectives Of RTB BOR Copper Mines After The Consolidation

    By S. L. Zekovic

    This paper analysis the medium and long-term perspectives, framework and considered possibilities of sustainable development of RTB "Bor" (Copper mines in East Serbia) after consolidation in the perio

    Jan 1, 2007

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (bdb34c0f-eece-4038-82e2-fac055da3c4a)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • CIM
    A Comparison of the Energy Requirements of an HPGR / Stirred Mill Circuit and Conventional Grinding Circuits for the Comminution of Mesaba Ore

    By Steve Wilson, Bern Klein, Jeff Drozdiak, Stefan Nadolski, Andrew Bamber

    "In the adaptation of high pressure grinding rolls (HPGRs) to hard-rock mining applications, circuit development has mainly focused on placing HPGRs in the role of tertiary crusher in the preparation

    Jan 1, 2010