Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development and Application of Impact-Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas

    By Kevin Jinrong Ma

    Underground mines often experience roof falls in entries, crosscuts, and intersections of active mining sections, main travel ways, and belt entries. Roof fall heights greater than 20 ft (6 m) make re

    Jan 1, 2011

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    Analysis of Extensometer Data from a Room Widening Experiment Designed to Induce a Roof Fall

    By Dennis R. Dolinar

    Roof falls, even of supported roof, still constitute a major hazard in underground mines. However, associated with any fall or instability is a pattern of roof movement. Therefore, the National Instit

    Jan 1, 1997

  • SME-ICGCM
    Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic Survey

    By Wolfgang Schott

    The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h

    Jan 1, 2003

  • SME-ICGCM
    Geological Conditions At Continuous Miner Sections; Examples From Marrowbone Development Company, Mingo County, West Virginia

    By J. Marc Coolen

    Marrowbone Development Company operates a large drift mining complex in the central Appalachian coal field. In 1997, five continuous miner supersections produced close to 9 million tons of raw plant f

    Jan 1, 1999

  • SME-ICGCM
    Roof Sounding Device - A Loose Rock Detector

    By Richard C. Repsher

    The U.S. Bureau of Mines has developed a method and device designed to detect lose rock material in underground mines. The technology is designed to be an aid to mine workers in detecting hazardous ro

    Jan 1, 1990

  • SME-ICGCM
    Moranbah North Tests the Critical Caving Theories Every Geotech Engineer?s Dream, the Ability to Get More than Two Points on a Curve

    By Chris Strawson

    Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Austr

    Jan 1, 2007

  • SME-ICGCM
    Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground Conditions

    By Kirk W. McCabe

    RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un

    Jan 1, 1981

  • SME-ICGCM
    Alternatives For Controlling Cutter Roof In Coal Mines

    By Nicholas P. Kripakov

    The unpredictable massive collapse of roof in openings developed under apparently safe and stable roof conditions in coal mines of the United States has been of much concern for many years. One type o

    Jan 1, 1982

  • SME-ICGCM
    Remote Sensing Techniques In Mine Planning - Applications And Limitations

    By D. E. Winston

    Roof falls are the major cause of fatalities in the, coal mining industry and the prevention of roof failure is a major concern of mine management. Many ground failures observed underground are associ

    Jan 1, 1982

  • SME-ICGCM
    Spatial Trends In Rock Strength - Can They Be Determined From Coreholes? (51393e91-3e75-4a8d-ac36-e107a993fe35)

    By Christopher Mark

    Mine planning for a new reserve is based on information obtained from exploratory coreholes. A critical component of an exploration program is the geotechnical evaluation. Poor assumptions about roof

    Jan 1, 2004

  • SME-ICGCM
    Analyses of Valley Fill Slope Stability - Three Case Studies

    By Shiva P. B. Kolli

    Surface mining of multiple scams by mountaintop mining methodology is complex in the Appalachian region of West Virginia. Excess spoil from the removal of overburden and interburden is disposed in the

    Jan 1, 2001

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    Regional Horizontal Surface Displacements Due To Mining Beneath Severe Surface Topography

    By Bruce K. Hebblewhite

    Tower Colliery is a longwall mine operated by BHP Coal Illawarra Collieries, Southwest of Sydney, Australia It mines the Bulli Seam at a depth of approximately 450m. The surface topography overlying t

    Jan 1, 2000

  • SME-ICGCM
    Development Cooperation Between Operator And Manufacturer - Point Anchor Resin Bolts

    By C. C. White

    Much benefit can be achieved by a mining company and a manufacturer if both parties can communicate effectively with each other and assist in product development; mutually beneficial ideas and product

    Jan 1, 1982

  • SME-ICGCM
    Underground High Resolution Seismic Method As A Low Cost Alternative For Mapping Sandstone Replacement Channels In Coal Mines

    By Rene Rodriguez

    Sandstone paleo-channels encountered during coal mining operation can significantly slow down the advance in mining, and often completely shut-down coal mine production, with consequent extensive econ

    Jan 1, 1994

  • SME-ICGCM
    Geotechnical Investigation For A Single Entry Design For Longwall Mining

    By Madan M. Singh

    Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c

    Jan 1, 1982

  • SME-ICGCM
    The Influence Of Certain Geologic And Geotechnical Factors On Coal Mine Floor Stability - A Case Study - Introduction

    By Robert C. Speck

    Floor heave or deformation of the mine floor into the mine opening is a problem which has plagued coal mines in this country and others. In mining areas where room and pillar mining is practiced, floo

    Jan 1, 1981

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000

  • SME-ICGCM
    Current Trends In Roof Truss Hardware

    By C. P. Mangelsdorf

    The success of the Birmingham roof truss (Figure 1) in supporting some difficult roof conditions, particularly in the Illinois coal basin, has given impetus to the development of a number of alternate

    Jan 1, 1982