Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Chemical Kiloton Experiment the Utilization of 50/50 Heavy ANFO at the Nevada Test SiteBy Don Larson, Gordon Coleman
The United States Department of Energy, through its contractor Lawrence Livermore National Laboratory, has entered into a contract with Alpha-IRECO, Inc. for the emplacement of approximately 2.9 milli
Jan 1, 1994
-
Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill &Blast Engineering Focused ProjectsBy Manuel Calderón
Chile is responsible for 30% of the global copper production; the world ́s largest. However, significant challenges are faced in this industry; declining grades (1.13% in 2002 to 0.61% in 2015), high
-
Use of Basic Statistics for the Overlapping Timing Analysis of a Single Blast HoleBy Lifent Li, Jhon Silva-Castro
Since millisecond-delay detonators were first introduced, at least two variables, among others, have been more closely considered when timing a mining blast: the accuracy and the precision of the init
Jan 1, 2015
-
Shock and Transient Gas Pressure Damage to Electronic DetonatorsBy G. Adderley, Rob. Farnfield, L. Bermingham
The benefits of using electronic detonators within the drilling and blasting process in both surface and underground mining operations are well established and the use of this technology is widespread
Jan 1, 2024
-
Fewer Surprises When You Measure the SizesBy Tom C. Palangio
Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co
Jan 1, 2016
-
Rebuild of a Flash Smelting Furnace Using ExplosivesBy Scott G. Giltner, Terry Millar, Ben Bringhurst
"Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo
Jan 1, 2016
-
Chilean Challenges in Underground Mining - Electronic Initiation System (IS) and Drill & Blast Engineering Focused ProjectsBy Manuel Villalobos Calderón
This paper presents the Enaex group approach to addressing the blasting challenges and outlines the solutions created. Aspects such as rock mass damage occurrence as a function of blast vibration freq
Feb 1, 2020
-
Missouri S&T Experimental Mine Expansion and Associated Risk Safety AnalysisBy Patrick Cahill, Jacob Miller, Nolan Mundwiller, Catherine Johnson
"The Experimental Mine at the Missouri University of Science and Technology is undergoing major developments. The underground workings are being expanded to include a ramp down to a second level which
Jan 1, 2017
-
Potential Impact of Blast Layout, Sequence and Detonator Timings on Air Overpressure from BlastingBy Shazad Hosein, Bill Birch, Catherine Johnson, Toby White, Liam Bermingham
Air overpressure (AOP) from blasting can give rise to a significant number of blasting complaints from residents living adjacent to blasting operations from mines, quarries or civil engineering projec
Jan 1, 2018
-
Detailed Planning Underscores Expansion of Vulcan's Chattanooga QuarryBy R L. Mayville
The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse
Jan 1, 1984
-
Application of the NIOSH-Modified Holmberg-Persson Approach to Perimeter Blast DesignBy Chick Kerkering, Stephen Iverson
Perimeter control blasting is common in civil construction projects but not as common in mining. A poorly designed and executed underground mine development blast design can result in unwanted wall ro
Jan 1, 2008
-
Measurement of Pressure VariancesBy Jason Baird, Philip Mulligan, Caleb Baumgart
This report details the pressure variances, measured at four pressure sensors placed equidistant from the center of an airburst explosion, as the blast pressure from a single charge expands radially.
Jan 1, 2014
-
Journal: Vibration Control Through Better PredictionsBy Keith Best
It has been said that when a person does something right no one remembers but when they do something wrong no one forgets. This statement, when applied to the explosives industry, has never been truer
Jan 1, 2008
-
New Methodology in Measuring Experimental Results of Linear Shaped Charges Using Digital SoftwareBy Kevin Phelps, Jason Baird, Philip Mulligan, Dominique Nolan
Determining the transitions from run-up to optimal cut length and optimal cut length to run down, without bias, from the penetration of a linear shaped charge (LSC) is difficult. The stresses applied
Jan 1, 2013
-
Underwater Blast Pressures From A Confinded Rock Removal During The Miami Harbor Deepening ProjectBy Terri Jordan, Gregory Hempen, Thomas Keevin
Water-borne blast pressures from confined blasts were recorded as part of a submerged blasting program in Florida for channel deepening. The blasting was confined within the rock floor by stemming. Sh
Jan 1, 2007
-
Removing Booster Influences from Toxic FumesBy Michael S. Wieland
"This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is
Jan 1, 1999
-
Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried MinesBy Damien Bretall, William Fourney
Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro
Jan 1, 2009
-
Journal: 100 Years / Scientific American New York December 2, 1911 The First National Mine Safety Demonstration Study Of A Real Mine Explosion By Charles L. Wright, Fuel Engineer, Bureau Of MinesBy Robert Hopler
THE work that is being done by the Government to reduce the dangers of mining was brought out strikingly in the First National Mine-Safety Demonstration which occurred at Pittsburgh, Pa., on October 3
Jan 1, 2012
-
Burden Profiling: Do You Measure What You Think You Do?By Greg Shapiro, Paul Dr. Worsey
Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,
Jan 1, 2019
-
Efficient Blasting for Bench Stability and Fragmentation Results ImprovementBy Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda
Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro
Feb 6, 2023