Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Installation And Testing Of Instrumented Tieback Anchors - IntroductionBy Joan Stoupa
The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili
Jan 1, 1990
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
Elimination Of Heave Forces On Lightly Loaded Piles In Swelling Clay - SummaryBy Basem Sh. Hazzan
In the last four decades significant effort has been devoted to designing piles in expansive clay soils. Nevertheless, only a scant effort has been devoted to the elimination of heave forces acting on
Jan 1, 1999
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge ConsortiumBy Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
An Investigation of Grouted Pile Capacity Using Instrumented Pile Load TestsBy Hayel M. El-Naggar, Sherif A. Akl
Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese
Jan 1, 2018
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Design Of Pile Foundations For The Sand Creek Byway, Sandpoint, IdahoBy Dean E. Harris
The realignment of U.S. Highway 95 in Sandpoint, Idaho, is being designed on a site underlain by glaciolacustrine soil that includes very thick deposits of soft, sensitive clay to estimated depths of
Jan 1, 2003
-
Deep Excavations And Foundations For Locks ? SynopsisBy B. H. Moore
Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f
Jan 1, 2010
-
Eglinton Crosstown, a New Step in Toronto’s Subway SystemBy Lars Richter, Franz-Werner Gerressen
"The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation
Jan 1, 2017
-
Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay BridgeBy Jacob Chacko
The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new
Jan 1, 2002
-
Secant Pile Walls - Design, Construction And Case HistoryBy Ketan H. Trivedi
This paper describes the method of analyses used for the design of temporary and permanent Secant Pile Walls, describes various aspects of construction including, guide walls, sequence of pile install
Jan 1, 2006
-
Time Dependent Open-End Pipe Pile Capacity Assessment By Dynamic And Quasi-Static MethodsBy Derrick D. Dasenbrock
Three piers of a new river bridge are supported on 1.067 m diameter open-end steel pipe piles. At time of drive, and after pile re-strikes, high-strain dynamic capacity values at plan tip elevations,
Jan 1, 2006
-
Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - SynopsisBy L. P. Weber
During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for
Jan 1, 1991
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
New Possibilities for Quality Assurance of Diaphragm Wall JointsBy Joram M. Amir, Ernst Niederleithinger, Nikolaus Schneider
"Abstract: Diaphragm walls are used to provide a stable and watertight confinement for the construction of tunnels, underground railway stations, deep basements and other structures requiring deep exc
Jan 1, 2014
-
A Historic Capitol And A Deep ExcavationBy Richard F. Sliwoski
The Virginia State Capitol was designed by Thomas Jefferson and constructed in 1785. The Capitol is of great historic and architectural significance to not only the Commonwealth of Virginia but to the
Jan 1, 2006
-
Bearing Capacity Of Long Piles Driven Into Soft Soil ? SynopsisBy F. Z. Suo
Baoahan Iron and Steel Complex is situated at lower beaches of the Yangtze River. The subsoils 50~70 M below the surface is a deposite of Yangtze River delta, consisting mainly of weak silty clay and
Jan 1, 2010
-
6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River TramwayBy Aly M. Mohammad
The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h
Jan 1, 2002
-
Use Of Helical Piles Set Into Soft Rock For 1500-Ton Screw Press FoundationBy David C. Kraft
A major manufacturer and user of machine tools had the need to install a screw press machine at its plant site with the following design load requirements: (1) Vertical Compression Live Load = 2000 ki
Jan 1, 2003