Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Micropiles for Seismic Retrofits

    By Rob Jameson

    "Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar

    Jan 1, 2009

  • DFI
    Dynamic Load Testing Of Non-Uniform Piles

    By Thai Nguyen Ph. D

    Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes

    Oct 1, 2022

  • DFI
    Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d Fea

    By Sailesh S. Author

    The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using

  • DFI
    Soil Mixing Monitoring System Quality Control for the SR-83 Project in Florida

    By Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni

    "SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl

    Jan 1, 2017

  • DFI
    Mansueto Library: Drama below Ground and Above

    By Patrick J. Lydon, Gregory A. Terri

    "The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The

    Jan 1, 2013

  • DFI
    Tresfjord Bridge -Pile Works

    By Andreas Andenæs, Arne Schram Simonsen

    "AbstractThe Tresfjord bridge is with its variety in foundation concepts and difficult soil conditions one of the most geotechnically challenging projects in Norway at the time. The project comprises

    Jan 1, 2014

  • DFI
    Soil Fatigue Analysis for Pile Driving Simulations Using an Impact Hammer

    By Peter Middendorp, David J. Tara, Gerald E. Verbeek, Jan Fischer

    "For pile driving simulation the model used must be accurate for the entire process, i.e. from the start of pile driving until the pile has reached its target depth. Of the various model components (h

    Jan 1, 2017

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f

    Jan 1, 2013

  • DFI
    Resonance Pile Driving with Zero Ground Vibration

    By Mark Johnson, Mathew Janes

    "The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl

    Jan 1, 1900

  • DFI
    Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics

    By Peter Middendorp, Gerald E. H. Verbeek

    "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o

    Jan 1, 2005

  • DFI
    Producing Sealing Walls And Sealing Slabs By Applying The Soilcrete Process

    By E. W. Raabe

    The paper discusses the increasing role of specialist grouting techniques to form water seals or cut-offs for deep basement construction. Raabe and Toth discuss the various grouting methods available

    Jan 1, 1989

  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017

  • DFI
    Shoring Design of Historic LA Metro Station

    By Babak Mamaqani

    The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi

    Apr 1, 2022

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Wolf Creek Dam Foundation Remediation – An Innovative Solution

    By Fabio Santillan, Lyndon Bedford

    "This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra

    Jan 1, 2015

  • DFI
    Rock Excavation and Underpinning below a 19-Story Building

    By Kevin P. Gleckler, Steven C. Highfill

    "Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which

    Jan 1, 2016

  • DFI
    San Diego Courthouse Commons Shaft Shoring And Tunnel Canopy Tubes

    By Ali Nasirian Ph. D., Gabriel Carvajal

    To facilitate the safer and more secure transportation of inmates from San Diego Central Jail to the new San Diego Courthouse, the County of San Diego committed to building a new transfer facility as

    Oct 1, 2022

  • DFI
    Pile Driving Hammers In Centrifuge Modelling - Synopsis

    By Daniel Levacher

    Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install

    Jan 1, 1996

  • DFI
    Session 15 "Jet Grouting IV"

    By Mitsuhiro Shibazki

    I can't answer that question but I am looking at Andy, my co-author, and he says we didn't measure it. No movement. If I understand it correctly, how do we handle lateral forces in shear? T

    Feb 10, 2003

  • DFI
    Development of Environmental Double Pile (EDP) for Improvement of Contaminated Soft Ground

    By Hyunsuk Yoon, Kiho Lee, Juhyng Lee, Younghoon Jung, Junboum Park

    "The environmental double pile method is presented as a device to improve the engineering properties and to clean up contamination of low-permeability soil. This method is one of the novel technologie

    Jan 1, 2005