Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Concrete Aggregates for British Columbia Construction ProjectsBy P. J. Routledge
THE purpose of this paper is to discuss the practical aspects of locating gravel deposits and of establishing efficient, portable concrete aggregate beneficiation plants for use on construction projec
Jan 1, 1962
 - 
                    
                Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mineBy U. Olsson, M. Ramström
"The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen
Jan 1, 2005
 - 
                    
                A Novel Approach to Recover Precious Values from Low-Grade Canadian OresBy V. I. Lakshmanan, D. A. Mackie
"1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven
Jan 1, 1989
 - 
                    
                The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora NorthBy D. Wolfe, R. Cleminson
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss
Jan 1, 2013
 - 
                    
                POWERPLAY - Realizing Savings Through Energy ManagementBy Andy Lemay
Vale (previously known as CVRD) is: ? The second-largest mining company by market capitalization (NYSE:RIO) ? Headquartered in Brazil ? Global workforce of over 100,000 employees including outsourc
May 1, 2008
 - 
                    
                Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process SupportBy J. Sliwinski, J. Oliveira
"The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo
Jan 1, 2013
 - 
                    
                A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand SilosA key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings
May 1, 2007
 - 
                    
                High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?By James A. Finch, Stéphanie Somot
"The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc
Jan 1, 2006
 - 
                    
                Hydraulic Hoisting & Long Distance Pumping of CoalBy R. E. McElvain
"Hydraulic transportation of solids in suspension with water or other carriers, such as oil is becoming more practical as economic situations develop with respect to the railroads and other carriers.
Jan 1, 1978
 - 
                    
                Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)By C. S. Maggs, L. Shwydiuk, H. W. Newcomen
The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s
Jan 1, 2003
 - 
                    
                The Development of a Small Scale Test for Rapid Characterisation of Flotation Response (JKMSI)"The characterisation of resources and description of variability across different ore domains is key to accurate prediction of probable metallurgical performance. Such characterisation testwork often
Jan 1, 2013
 - 
                    
                Narrow-vein Mining Experiences at the Ashanti Mine: A Case StudyBy Fidelis T. Suorineni
The Ashanti mine, located in Obusai, Ghana, West Africa, has been in production for over 100 years, and is currently the second largest single gold producer in Africa. The mine covers a concession are
Oct 1, 2001
 - 
                    
                The Operating Range Method for Backfill HydraulicsBy D. J. Hallbom
This paper presents a novel methodology for the hydraulic design of mine backfill distribution systems. The ?operating range? method uses the concepts of the hydraulic grade line and equivalent pipe l
May 1, 2007
 - 
                    
                Developments in at-Face/in-Pit Processing TechnologiesBy Martin Stoklossa
Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho
May 1, 2008
 - 
                    
                Mill Modernization Program at Noranda Minerals Inc. Geco DivisionBy L. S. Urbanoski
This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine
Jan 1, 1987
 - 
                    
                A Generic Study of the Capital and Operating Costs for the Recovery of Precious Metals from Refractory Ore"This generic study has been developed in response to the frequently asked question, ""That is the best treatment route for refractory gold ore?"". The study has developed operating and capital costs
Jan 1, 1989
 - 
                    
                Kiena Maintains Up To Date Image with a New Gold MillBy R. Jolicoeur, J. F. Jackson, M. A. Green
"The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in
Jan 1, 1986
 - 
                    
                Framework for optimizing components in an oilwell cement slurry designBy D. Getzlaf
"Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s
Jan 1, 2004
 - 
                    
                EKATI Safety Guarantee A Conversation for an Extraordinary PossibilityBy Richard Morland
Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm
May 1, 2010
 - 
                    
                Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining SustainabilityBy Zetti Gavelán
Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty
May 1, 2010