Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Moly-Cop Tools Applications for the Assessment of Grinding Media Performance at Full Industrial Scale

    By J. E. Sepulveda, R. Morrow

    "The Linear Wear Theory provides a reliable framework for the assessment of grinding media performance at full scale. This theory can be applied for analyzing grinding media consumption rates in any g

    Jan 1, 2014

  • CIM
    Use of Twinned Drillholes in Mineral Resource Estimation

    "Drilling twinned holes is a traditional technique used for verification of intersections of high-grade mineralization, testing of historic data, or confirmation of drillhole data during geological du

    Jan 1, 2009

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Evolution of SAG Mill Process Control at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Erik Bartsch, Guy Comeau

    "The Xstrata Nickel Raglan Concentrator, located at the northern limit of Quebec’s Nunavik region has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high grade

    Jan 1, 2008

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Application of Mass Blast Principle for Stope Blasting in Deep Mines

    ?? Intro ?? Mass blast principle ?? LaRonde evolution toward mass blast ?? Overview ?? Mining method ?? Longitudinal ?? LaRonde evolution (2002 to today) ?? Drill and blast design ?? Consumpti

    Feb 1, 2008

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles

    By L. Bloomquist

    This paper describes how Automated Mining Systems (AMS) is evolving the state-of-the-art in guidance systems for autonomous underground vehicles. The techniques, trade-offs, and lessons learned from t

    Jan 1, 2004

  • CIM
    The evolution of advanced guidance techniques for autonomous underground vehicles (8e8c3b94-ac75-4947-840c-a59d92585998)

    By L. Bloomquist, C. Arnoldi

    "This paper describes how Automated Mining Systems (AMS) is evolving the state-of the- art in guidance systems for autonomous underground vehicles. The techniques, tradeoffs, and lessons learned from

    Jan 1, 2004

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • CIM
    Desulphurization of Placer Dome’s Musselwhite mine gold cyanidation tailings

    By N. Hmidi, T. Yalcin, M. Papadakis, B. Hilscher

    Mill tailings, containing iron sulphides in particular, pose an environmental concern since they constitute a potential source of acid mine drainage which can damage vegetation, harm soil and living o

    Jan 1, 2004

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • CIM
    The Development of an Integrated IT System at Albian Sands Energy

    By Louise H. Michaud

    Albian Sands Energy is scheduled to begin production at its oilsands operations in the fall of 2002. Start-up includes the selection and implementation of over 75 IT systems or computer applications.

    May 1, 2002

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    Geotechnical Considerations for Underground Mining of the Dy Deposit, Faro, Yukon

    By Nick D. Rose

    The Dy deposit is a 21 Mt Pb-Zn-Ag-Au SEDEX-type massive sulphide resource located in the Anvil District, Faro, Yukon. This relatively unexplored orebody lies at a depth of 480 to 920m below surface,

    May 1, 2002

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    The Midas Pond Gold Prospect, Victoria Lake Group, Central Newfoundland: A Mesothermal Quartz Vein System with Epithermal Characteristics

    By Derek H. C. Wilton, David T. W. Evans

    "Abstract - The Midas Pond gold prospect, central Newfoundland, is hosted by sheared and altered felsic and mafic pyroclastic rocks of the Tulks Hill volcanics, Victoria Lake Group, and has been trenc

    Jan 1, 2000

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    Capturing unrealized capacity

    By M. W. Lewis

    A mine's inherent capacity is dictated by factors such as equipment, design, people, processes, and environment. Actual production may approach, but never surpass, the inherent capacity limit. Th

    Jan 1, 2004