  • CIM
    Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore deposits

    By J. Duncan Crone

    "A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe

    Jan 1, 1985

  • CIM
    On-site evaluation of diesel contaminants produced by an electronically controlled diesel engine

    By Michel Grenier, Robert Scott, Mahendra Gangal, Andrew Dasys

    This research project which took place at Brunswick Mining and Smelting's Brunswick mine, was undertaken to assess the ability of new diesel engine technology to meet current and anticipated unde

    Jan 1, 1994

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • CIM
    The Approach to Process Improvements at Brunswick Mine

    By Chris Larsen, Carole Fortin, Dave Scott, Curtis Deredin, Ian Orford, Jean Guy Gauthier, Andy Trusiak, Lyne Côté, Mike Cooper

    "Upon successful commissioning of the Stage Grinding Project (Cormier et. al., 2002), process improvements predicted through pilot plant testing were obtained in several flotation circuits, resulting

    Jan 1, 2005

  • CIM
    Monitoring whole body vibration effects on ultra-class haulers

    By V. D. del Valle, T. G. Joseph, J. J. Berezan

    Aggressive driving patterns, rough and poorly maintained roads and pit floors, along with the occasional bump and poorly placed load from a shovel can create intense and sometimes serious vibration le

    Jan 1, 2004

  • CIM
    On the Role of Bubble Size in Column Flotation

    By Jose R. Hernandez-Aguilar

    "Three models to predict the effect of bubble size (Db) on metallurgical response were tested in a pilot-scale flotation column at Teck Highland Valley Copper mine. The column was fed with slurry coll

    Jan 1, 2011

  • CIM
    Modelling of the Dry Magnetic Separation Process at Rio Tinto Fer et Titane

    By Carl Bertrand, Patrice Nadeau, Claude Bazin

    "Rio Tinto Fer et Titane processes the ore extracted from the Lac Tio orebody to concentrate the hemo-ilmenite (FeO.TiO2-Fe2O3) mineral that is subsequently smelted to produce pig iron and titanium ox

    Jan 1, 2011

  • CIM
    The Onça Puma Nickel Project

    By Ruy L. Rodrigues

    Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t

    May 1, 2010

  • CIM
    The Fuel Reserves of Alberta

    By W. A. Lang

    Introduction Under our present civilization, industrial developments will be greatest in those areas in which energy .can be most economically produced and efficiently used, where labour is in adeq

    Jan 1, 1949

  • CIM
    Geology and Mineralogy of the Hercynian Koudiat Aïcha Polymetallic(Zn-Pb-Cu) Massive Sulfide Deposit, Central Jebilet, Morocco

    By E. Marcoux, F. Lotfi, A. Belkabir, L. Maacha, A. C. Brown, S. Brunet

    "Koudiat Aïcha is a small Zn-Pb-Cu deposit, enclosed in the Visean Sarhlef volcano-sedimentary series of the Moroccan Hercynian Jebilet massif. Base metal mineralization is located between a basal uni

    Jan 1, 2008

  • CIM
    Computerized cost estimating for underground mines

    By J. B. Scott

    "A computerized cost estimating program developed with the use of the Lotus 1-2-3 spreadsheet program has produced dramatic savings in preparing estimates for operating costs, equipment fleet size and

    Jan 1, 1988

  • CIM
    Convergent Bitumen Recovery

    By Lee Nichols

    Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand

    May 1, 2007

  • CIM
    Implementation of a Flotation Expert Control System at the Raglan Mine

    By G. Couture

    "The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o

    Jan 1, 2015

  • CIM
    The Cigar Lake project - mining, ore handling and milling (1463a4ec-6903-4c1d-b800-831570ba9799)

    By C. R. Edwards

    "The Cigar Lake project will develop the world’s second largest high grade uranium deposit. The Cigar Lake Phase 1 orebody contains approximately 226 million pounds U3O8 at an average grade of 20.7% U

    Jan 1, 2002

  • CIM
    Some Factors in 'Freezing' in Naphtha-Producing Wells in Turner Valley

    By W. P. Campbell

    Foreword At the outset, it should be stated that this paper does not pretend to present a panacea for the ills that 'frozen' wells are heir to, but rather is an attempt to bring to the at

    Jan 1, 1930

  • CIM
    Indexes of Mine Microseismic and their Application in Safety Assessment by Statistical Evaluation at Luomu Mine

    By J. Hu, F. Lin, R. Chen, F Peng, S. Yang, W. Yu

    "Microseismic monitoring technology has become one of the most effective method of mine ground pressure monitoring after decades of development. But safety assessment of mine ground pressure by using

    Jan 1, 2015

  • CIM
    Galfan-coated automotive steel improves fabrication and performance

    By Richard F. Lynch, Frank E. Goodwin

    "The development of Galfan, a new generation 95% zinc-5% aluminum-mischmetal alloy coating for steel, offers opportunities for greater fabrication flexibility and upgraded corrosion performance in aut

    Jan 1, 1987

  • CIM
    Integration of gyratory crusher liner wear and operational performance for better crusher management

    By P. P. Rosario, D. M. Maijer

    The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC

    Jan 1, 2006

  • CIM
    Mineralogy And Modelling – Predicting Uranium Leach Extraction At Olympic Dam

    By B. Pewkliang, K. Ehrig, E. Macmillan, M. Smith, V. Liebezeit, Y. Li

    The Olympic Dam iron-oxide copper-gold (IOCG) uranium-silver deposit is the largest publicly declared uranium, fifth largest copper and third largest gold resource. Currently, the operation consists o

    Jan 1, 2020

  • CIM
    The Development of Process Mineralogy at Falcon Bridge Limited, and Application to the Raglan Mill

    By Norman O. Lotter, Lori Kormos, Greg J. Wilkie, Peter J. Whittaker, Johannes S. Stickling

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002