Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Sä Dena Hes Joint Venture Concentrator Operation

    By I. Orford, V. Rozon

    "The Sä Dena Hes Joint Venture Mill was designed to process 450,000 tonnes per year of ore grading 11.3% lead and 13.2% zinc.Run of mine ore is crushed in a jaw crusher and then ground in a closed cir

    Jan 1, 1993

  • CIM
    Scale model study of a borehole pulse electromagnetic system

    By Dennis V. Woods, J. Duncan Crone

    "In order to determine its capabilities and to aid in the interpretation of fie ld results, a scale model study and field tests were carried out on the Crone borehole pulse electromagnetic (PEM) syste

    Jan 1, 1980

  • CIM
    Comparison of Reinforcement Benefits of Spray-on Linings in Side-by-Side Unconfined Compression Failure Tests on Rock

    By James F. Archibald

    Testing has been accomplished to substantiate recent laboratory trials which have demonstrated that thin liner membranes, applied to rock core samples, can significantly enhance the structural perform

    May 1, 2001

  • CIM
    Metamorphism of Witwatersrand Gold (e32037f3-7bf5-4024-8061-0ae3c90308dd)

    By H. E. Frimmel

    Most of the gold in the Late Archean Witwatersrand Basin is of detrital origin but, in its present form, it is metamorphosed. The only relict detrital features preserved are the morphological characte

    Jan 1, 1994

  • CIM
    Recent Mining Developments in the Central Manitoba Mining District

    By H. A. Wentworth

    The Central Manitoba mining district, as spoken of in Manitoba, refers to that portion of the country lying between lake Winnipeg on the west and the Ontario boundary on the east, and from a few miles

    Jan 1, 1925

  • CIM
    Coal in 1950 Particularly the Domestic Market

    By C. L. O?Brian

    Note: The figures quoted and used herein have been collected and furnished by the Dominion Bureau of Statistics. Without the help and willing co-operation of the officials of the Burreau, this study w

    Jan 1, 1951

  • CIM
    Computer Power Demand Control

    By Richard Q. Fox, Joe L. Pinson

    This paper provides guidelines jo1• analyzing and selecting electric power demand controlled. Error calculations, load selections and timing criteria are identified as the three key functions which af

    Jan 1, 1976

  • CIM
    Limestone in the Pulp and Paper Industry

    By H. J. Rowley

    THERE are many varieties of limestone, but for the general purposes of the pulp and paper industry, two classifications are sufficient: (1) High-calcium stone, which should be quite free from impuri

    Jan 1, 1939

  • CIM
    Performance of the two EPBM in Istanbul Twin Metro Tunnel Excavations in Weak Rock

    By Ibrahim Ocak

    The prediction of machine utilization time and determining machine performance plays an important role in scheduling and planning tunnel excavation and data base created serve a major role in further

    Aug 1, 2013

  • CIM
    Notes on the use of Storage-Battery Locomotives and Storage-Batteries Underground

    By J. Shanks

    In 1920 the writer presented some notes, embodying his experience with storage-battery locomotives as main under-ground haulage-motors at Brazeau collieries. (1) Since that date these motors have stoo

    Jan 1, 1924

  • CIM
    Zone 4 North 520-7350E & 590-7215E Freeze Drifts Development

    By Brian Mattie

    Overview ?Overview of the mining area ?Description of the mining phases ?Risk assessment ?Design criteria and description for freeze drifts ?Freeze wall design ?Raisebore mining Four Main

    Nov 1, 2011

  • CIM
    Kearl Oil Sands Project Overview

    By Scott Hommema

    ? Bitumen in the oil sand averages Bitumen 12 wt%; water makes up 4 wt% ? Imperial Oil (operator) and ExxonMobil developing Kearl Leases #6, 36, 87 (~200 sq. km) ? Target resource > 4 Billion Bar

    May 1, 2008

  • CIM
    Uranium geology in the Athabasca and a comparison with other Canadian Proterozoic basins

    By L. A. Homeniuk, R. Bonnar

    "The Athabasca Basin has been the scene of an intense exploration effort since the late 1960s, resulting in the establishment of this area as one of the major uranium districts in the world.The A thab

    Jan 1, 1982

  • CIM
    Electrochemical regeneration of cyanide from waste thiocyanate for cyanidation

    By K. Enns, J. J. Byerley

    "While thiocyanate (SCN-) is used in a number of industrial processes (production of polyacrylonitrile filaments, synthesis of agricultural chemicals and certain metallurgical solvent extraction and f

    Jan 1, 1984

  • CIM
    The Fording River Mine-an overview

    By P. J. Urso

    "This paper discusses the mining problems encountered at the Fording River coal mine to date, and how they have been solved. All of the production now comes from surface mining, but underground hydrau

    Jan 1, 1980

  • CIM
    Electron beam freeforming using brazing paste and solid wire as filler metal

    By M. Jahazi, M. Brochu

    This paper describes the advantages/disadvantages of electron beam freeforming using two different types of filler metal: (1) brazing paste and (2) solid wire. Sound buildups were obtained from both f

    Jan 1, 2004

  • CIM
    Arsenic removal from gold processing waste waters: the potential ineffectiveness of lime

    By Kazuteru Tozawa, Robert G. Robins

    "The stability of calcium arsenate is discussed in relation to the possible misuse of lime in the treatment of gold processing waste waters. Stability diagrams have been derived and experimental resul

    Jan 1, 1982

  • CIM
    Ore in Depth in British Columbia Mines

    By S. J. Schofield

    INTRODUCTION ONE of the greatest and most interesting problems of economic geology is to discover criteria bearing on the persistence of ore in depth. It is a question which is very much to the fore

    Jan 1, 1935

  • CIM
    How to Identify the Critical Stakeholders in an Interface Management System?

    By S. Shokri

    The increasing size and complexity of mega construction projects result in having several geographically distributed stakeholders, collaborating with each other to successfully deliver the project. El

    Aug 1, 2013

  • CIM
    Modification of Conventional Thickener by Installation of Lamella Modules

    By I. Stanoev, V. S. Stoilov, I. Gradinarov, E. D. Visariev, I. A. Bonchev, Aurubis Bulgaria

    "Aurubis is the leading integrated copper group and the world’s largest copper recycler. In Copper smelter Aurubis Bulgaria (Pirdop), the residual copper in the slags from Flash furnace and Converters

    Jan 1, 2016