    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding Circuit

    By M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud

    "In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp

    Jan 1, 2017

  • CIM
    Ground granulated blast-furnace slag for cemented mine backfill: production and evaluation

    By E. Douglas, V. M. Malhotra

    "This report presents the results of a laboratory study undertaken to evaluate ground granulated blast-furnace slag from Algoma Steel Corporation, as a replacement for Portland cement in cemented mine

    Jan 1, 1989

  • CIM
    The Alsands Project

    By C. R. Edwards, J. R. Smith

    "INTRODUCTIONThe purpose of this paper is to give an overview of the ALSANDS PROJECT, with emphasis on the approach taken in the design of the Primary Extraction and Froth Treatment Plants.The Alsands

    Jan 1, 1982

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    A Comparison of the Energy Requirements of an HPGR / Stirred Mill Circuit and Conventional Grinding Circuits for the Comminution of Mesaba Ore

    By Steve Wilson, Bern Klein, Jeff Drozdiak, Stefan Nadolski, Andrew Bamber

    "In the adaptation of high pressure grinding rolls (HPGRs) to hard-rock mining applications, circuit development has mainly focused on placing HPGRs in the role of tertiary crusher in the preparation

    Jan 1, 2010

  • CIM
    Developing Operation, Maintenance and Surveillance Manuals for Tailings and Water Management Facilities

    By Ian Bruce

    Tailings and water management facilities are essential and integral components of mine and mill operations. They must be managed for the long term in order to ensure that safe and environmentally resp

    May 1, 2002

  • CIM
    The Treatment of Roaster - Off Gases at Campbell Red Lake Mines Limited

    By J. S. Roberts

    "Campbell mines has been in operation since 1948. Part of the process consists of roasting of a flotation concentrate which contains arsenopyrite.At present operation level the milling rate averages a

    Jan 1, 1976

  • CIM
    Community Engagement Best Practice in the mining sector: What?s recommended and who?s using it?

    By Ben Bradshaw

    Context ? Community engagement has become an increasingly significant and challenging part of mineral exploration and mine development; indeed, opposition from communities proximate to a proposed min

    May 1, 2010

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • CIM
    Flotation of Base Metals from Grinding Mill Discharges

    By A. J. Williams

    "Conventional base metal milling practice normally consists of crushing, grinding and cyclone classification followed by flotation. It is the authors' belief that the commencement of flotation after c

    Jan 1, 1984

  • CIM
    Production of Paste from Total Tails in a Deep Cone Thickener A Case Study

    By Gregg Hodges, Fred Schoenbrunn, Steve Slottee, Chad McCleary

    "In December, 1999 Stillwater Mining Company (SMC) commissioned a new paste /cement backfill plant to supplement the existing sand backfill system for the cut and fill mining operation at it’s Nye, Mo

    Jan 1, 2001

  • CIM
    The Oxygen Demand of Flotation Pulps

    By F. Rosenblum, P. Spira

    "Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho

    Jan 1, 1974

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • CIM
    Effects of Fabrication Process Parameters on the Microstructure of Ferritic/Martensitic Oxide Idspersion Strengthened (ODS) Steel Components for Future Nuclear Reactor System Applications

    By S. Noh, T. K. Kim, B. O. Lee

    Future nuclear reactor systems such as a sodium-cooled fast reactor are being designed under severe conditions in terms of operating temperature and irradiation fluence compared to current commercial

    Jan 1, 2015

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • CIM
    Model Verification of Carbon Dioxide Sequestration in Unminable Coal Seams with Enhanced Coalbed Methane Recovery

    By F. Vasilikou

    Commercial deployment of Carbon Capture Utilization and Storage (CCUS) requires field testing of a scale that can stress the geologic reservoirs. One such reservoir of interest consists of unminable c

    Aug 1, 2013

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992