Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble Mills

    By John A. Herbst, Alexander Potapov, Xiangjun Qiu

    "High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB

    Jan 1, 2003

  • CIM
    The Central Mukur Gold Project

    By Elmer Stewart, Richard May

    "The Central Mukur deposit was discovered by the Semipalatinsk Geological Exploration Expedition (GEE) during detailed searches from 1977 to 1980. Andas Altyn Ltd., a Kazakhstanian gold mining company

    Jan 1, 1999

  • CIM
    The Role of Applied Biotechnology in Decommissioning Mining Operations

    By Margarete Kalin

    "Biotechnological approaches to decommissioning of mine waste management areas are presented in the context of sustainable environmental management. Improved design of waste sites and environmental ma

    Jan 1, 1998

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • CIM
    The Red Dog VIP mill optimization project. Part A: Rectifying the shortage of flotation capacity

    By George Hope, Brigitte Lacouture

    "The Red Dog mine has increased mill throughput most years since start-up. Although flotation equipment has been added over the last 10 years, the Red Dog metallurgical performance has been restricted

    Jan 1, 2003

  • CIM
    Convergence of Safety Technologies ISARC ? World Mining Congress 2013

    Pressure for Better Safety Practices ? Increase Government Regulation ? Safety practices evolve from: ? Increased efficiency and performance ? More knowledgeable workforce ? Focus on decreasing

    Aug 1, 2013

  • CIM
    Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation

    By Niklas Frank

    Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau

    May 1, 2003

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    Development of value-added zeolite products from St. Cloud Mining

    By R. S. Bowman, G. S. Austin, J. M. Barker, P. S. Freeman

    The physical, chemical and mineralogic characteristics of zeolites allow commercially important applications. While adoption of zeolite technology is slow in the United States compared to other region

    Jan 1, 2004

  • CIM
    Equity Silver Mines Scavenger Circuit

    By P. G. Semple

    "In January 1985, Equity Silver Mines Limited began operation of a cyanidation circuit to scavenge precious metals from the flotation tailings. At present, this process is treating 270,000 tonnes of t

    Jan 1, 1987

  • CIM
    Environmental Control Design at Shebandowan Mines

    By T. Peters, W. C. Ferguson

    "Shebandowan is about 600 miles west of Sudbury and 50 miles west of Thunderbay close to the trans Canada highway. Shebandowan Lake is about 38 miles long. The ore body is located between No. 1 and No

    Jan 1, 1975

  • CIM
    Magnetic Gold: Losses from a Gold Recovery Circuit

    By Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher

    A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl

    Jan 1, 2014

  • CIM
    Talc Problems Encountered in the Mining and Milling of Kanichee Nickel-Copper Ore

    By F. M. Makarinsky

    "SynopsisThe Kanichee open pit mine and milling complex is situated approximately four air miles north-west of Ternagami, Northern Ontario, in Strathy Township. Mining and milling production commenced

    Jan 1, 1975

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and Design

    By Fidelis T. Suorineni

    Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories

    May 1, 2011

  • CIM
    Prestress and Stress Around A Redistribution 1n Mine Opening

    By C. L. Emery, A. V. Corlett

    "The stress equilibrium is disturbed in a body of rock by a mine opening and is restored by a redistribution of the stresses around the opening. The pattern of the redistribution of unilateral stress

    Jan 1, 1959