Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Real Time Mineral Analysis using COSMA

    By Sanjiv Dhanjal

    "Often mineralogy dictates the physical properties of a material rather than chemistry. This in turn affects how that material behaves in a process plant, and whether optimum conditions for refining o

    Jan 1, 2009

  • CIM
    Raw Water Supply: The Experience of Cerro Verde

    By Ken Wood

    "A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai

    Jan 1, 2008

  • CIM
    Development of Oxidation Resistant Titanium Alloys by Niobium Addition

    By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers

    The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li

    Jan 1, 2014

  • CIM
    How Many Samples are Enough? Theoretical Determination of the Critical Sampling Density for a Greek Clay Quarry.

    By Konstantinos Modis

    According to recently established theoretical analysis and under certain conditions, a critical sampling density can be determined for an earth-related space-distributed natural variable. Sampling abo

    Oct 1, 2009

  • CIM
    Centrifuge Units for Gravity Separation - An Update

    By André R. Laplante

    "This presentation reviews three continuous centrifuge separators, the Falcon-C, Kelsey Jig and Multi-Gravity Separator, two units with possible synergies with centrifuges, the In-Line Pressure Jig an

    Jan 1, 2000

  • CIM
    Chemistry of paste backfill

    By Jacques Ouellet, Ferri Hassani

    "Within the mining industry paste backfill technology has evolved over the last two decades. This technology aims at producing safe and cost effective backfill of high strength. When used as cemented

    Jan 1, 2002

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • CIM
    Automated Cyanide Control at the New Britannia Mine, Snow Lake, Manitoba: Fall 1998

    By Shawn Healey, Ray Norcross

    "Site IdentificationNew Britannia MineA 50/50 WX Gold Inc. - High River Gold Mines Ltd. Joint VentureTVX Gold Inc. is the OperatorLocationThe New Britannia Mine is located in the town of Snow Lake, Ma

    Jan 1, 1999

  • CIM
    Salitre Project Brazil

    By Roberto Busato Belger

    - Fertilizer Business Overview - Supply -Demand Balance in the World - Supply -Demand Balance in Brazil - Brazilian Market Growth Opportunities - Fosfertil Operations - Fosfertil Expansion Plan

    May 1, 2010

  • CIM
    Circuit Modifications at Westmin Resources Myra Falls Operations

    By C. Veloo

    "Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.

    Jan 1, 1992

  • CIM
    Hydromet Piloting: What the Mineral Processor can expect

    By Ronald Molnar

    "High demand for metals is driving the exploitation of lower grade and more complex orebodies. These projects are often the initiatives of junior mining companies with limited financial resources. In

    Jan 1, 2006

  • CIM
    All-Hydraulic Bucket-Wheel Excavators (A Synopsis)

    By Walter Durst

    On October 16, 1978, the Harnback open cut of Rheinische Braunkohlenwerke, the largest open cut ever planned, was officially put into operation. It will outperform all of the large open cuts known at

    Jan 1, 1979

  • CIM
    Hangingwall sloughing mechanism in open stope mining

    By J. Ran

    "Hangingwall sloughing is the major cause of unplanned stope dilution in open stope mining. Understanding the hangingwall sloughing mechanism can guide the stope design in minimizing the unplanned dil

    Jan 1, 2002

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008

  • CIM
    Antiscalants for Calcium Scale Control in Gold Process Circuits

    By Brad Wells, Wayne Bull, Wayne Dickinson

    "Antiscalants were evaluated for control of calcium carbonate (CaCO3) in gold processing applications. Under severely supersaturated conditions, 100 percent inhibition was achieved with 30 ppm antisca

    Jan 1, 2014

  • CIM
    Gold-copper ores processing / flotation process optimization by the development of an on-line expert system

    By Yves Breau, François Robichaud, Jacques McMullen, Pierre Pelletie

    "The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • CIM
    The Explosion in Hillcrest Mine, Alberta, September 19th, 1926

    By George Rice

    Foreword Following the explosion in the Hillcrest mine, which occurred in the evening of Sunday, September 19th, 1926, and in which two men lost their lives, the writer was invited by the Hon. J.E.

    Jan 1, 1928

  • CIM
    Operation of a Gold Extraction Circuit for Recovery of Gold from Uranium Mill Tailings at Cluff Lake, Saskatchewan (78ae3e82-f2cf-45b8-b7b7-209d077156f6)

    By L. A. Melis, J. W. Rowson

    "Cluff Mining operates the Phase II uranium mine and mill at Cluff Lake, northern Saskatchewan. During the Phase I operation, uranium tailings were generated by acid leaching of a gravity concentrate

    Jan 1, 1988