Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Appropriateness of the Transfer Size in AG and SAG Mill Circuit Design (66c8a2e6-98f0-41c1-9ddb-2a494997b260)

    The AG/SAG circuit discharge P80 is now increasingly referred to as the “Transfer Size” or T80 for short. From the literature it is apparent that in circuit design some approaches to the sizing of AG/

    Jan 1, 2012

  • CIM
    Assessment of Hydrogen Accumulation Behavior in Stressed Al-Zn-Mg Aluminum Alloys by Means of Kelvin Force Microscopy

    By H. Fujihara, K. Uesugi, H. Toda, A. Takeuchi, K. Shimizu

    "Hydrogen is trapped at a variety of microstructures, for example grain boundaries, dislocations and particles. It is thought that hydrogen trapped at trapping sites is redistributed to the other site

    Jan 1, 2018

  • CIM
    Subgrain sizes and misorientations in hot worked aluminum

    By G. Avramovic-Cingara

    Grain boundary characteristics and microstructural evolution are analyzed in a comparative study using orientation imaging microscopy (OIM/SEM) and transmission electron microscopy (TEM/SAD). The subg

    Jan 1, 2004

  • CIM
    Criteria for Choice of Optimal Ore Preparation Schemes

    By E. Bratygin, G. Gazaleeva

    "The article describes the analysis of methods and criteria of selectivity of optimal ore preparation schemes. Traditional criteria based on study of physical-mechanical properties of ores give the co

    Jan 1, 2016

  • CIM
    High Productivity Zinc Electrowinning Plant

    By M. L. Connolly

    Zinc production by Cominco Ltd. began in Trail in 1916 at a rate of 55 metric tonnes per day (t/d) and was increased ,in several increments until now electrowinning capacity approaches 750 t/d. The la

    Jan 1, 1977

  • CIM
    The Geological Survey

    By G. A. Young

    THE Geological Survey was created in 1842 to aid the development of Canada's mineral resources. Although the institution has been in existence for nearly 100 years and has accomplished an immense

    Jan 1, 1940

  • CIM
    Electrochemical Studies of the Gold-Electrolyte Interface under Thiosulfate Based Leaching Conditions

    By A Frydrychewicz, J. Mirza, J. Lipkowski

    The objective of this work was to understand the mechanisms of action of additives, such as thiourea, that enhance gold leaching in thiosulfate solution. The leaching reaction and surface passivation

    Jan 1, 2011

  • CIM
    The Baker Mine operation

    By J. M. Paxton, R. L. Roscoe, G. A. McCreary, W. W. Muir, T. J. Drown, D. A. Barr, T. W. Law

    "This paper reviews the complete cycle of a small mining operation in a remote section of northern British Columbia, including discovery, exploration, development and production. The discovery of high

    Jan 1, 1986

  • CIM
    Chemostratigraphy of Volcanic Rocks Hosting Massive Sulfide Clasts Within the Meductic Group, West-Central New Brunswick

    By L. R. Fyffe, D. R. Lentz, S. H. Mcclenaghan

    "Abstract - The Eel River area in the southwestern Miramichi terrane of New Brunswick contains a complete calc-alkaline suite of volcanic rocks that are interlayered with intervals of sedimentary and

    Jan 1, 2006

  • CIM
    Effect of Ammonium, Sodium and Potassium Sulphates and Chlorides in the Pressure Acid Leaching of Western Australian Nickel Laterite Ore

    By B. I. Whittington

    This paper examines the effect of cation type (i.e. NH4+, Na+ and K+) and anion type (i.e. SO42- and C1-) on the extraction of nickel during the pressure acid leaching of a Western Australian laterite

    Jan 1, 2004

  • CIM
    On Stream Analysis at Brenda Mines Limited Ten Years Experience with ARL's PCXQ X ray Analyser

    By Derek Perkins

    "Brenda Mines Ltd. operates an open pit copper and molybdenum mine located in south central British Columbia. The main economic mineralization is chalcopyrite and molybdenite. Pyrite, galena and sphal

    Jan 1, 1989

  • CIM
    Pervasive Sensor Network for Real Time Environmental Monitoring in Construction Sites

    By A. Carbonari

    In order to gain competitiveness and compete at a global level, construction companies should improve their efficiency. The problem is even more relevant in the construction field, whose work processe

    Aug 1, 2013

  • CIM
    The Goldstrike pressure oxidation plant process and engineering design, construction and commissioning

    By K. S. Fraser, H. J. H. Pieterse

    "A pressure oxidation plant to pretreat refractory sulphide ore at the Goldstrike plant in Nevada, was commissioned in early February 1990. The plant, with a nominal capacity of 1363 t/d, was commissi

    Jan 1, 1992

  • CIM
    Control of Run-of-Mine Ore Quality at Sail Iron Ore Mines

    By Apoorva Bajaj

    Iron ore mines of Steel Authority of India Limited (SAIL) have to comply with strict chemical composition norms laid down for iron ore lumps supplied to its steel plants. This requires a careful plann

    Oct 1, 2009

  • CIM
    Present Status of Canadian Energy

    By A. W. Lovett

    "THE last two years have been years of recession or, perhaps, years of marking time, depending upon whether the observer is a pessimist or an optimist. There has been a slackening in the industrial te

    Jan 1, 1959

  • CIM
    Comparison for 6061 materials of extrusion analyses by FEM and by traditional methods

    By H. J. McQueen

    The modeling of the extrusion of 6061 alloy and its composites with 10 to 20 vol% Al203 or SiC by two techniques. The uniaxial finite element method FEM (DEFORM" ) provided force-stroke curves and tem

    Jan 1, 2004

  • CIM
    Treatment of High Iron Calcines in the Electrolytic Zinc Plant of Metallurgica Met-Mex Peñoles, S.A De C.V.

    By Claudio Rocha Rosales

    "Peñoles is a mining group with integrated operations for the smelting and refining of non-ferrous metals, and it is also a chemicals producer. Peñoles is the world’s foremost producer of refined sil

    Jan 1, 2016

  • CIM
    Automated Development of Construction Schedules Using Onsite Data Acquisition

    By Magdy Ibrahim

    Detailed as-built project schedules are necessary to close out construction projects, benchmarking, forecasting, dispute resolution, and improving cost estimates of future projects. Manual procedures

    Aug 1, 2013

  • CIM
    Coal Preparation

    By G. A. Vissac

    METHODS of coal preparation have been greatly developed and improved during the past few years. Under the pressing competition from substitutes that have been displacing coal as a source of heat or po

    Jan 1, 1937

  • CIM
    Rock Stresses Induced by Shrinkage Stoping

    This paper generalizes open stopes into elliptical cross sections and applies the results of calculations based on the mathematical theory of elasticity to indicate stress distribution on the boundari

    Jan 1, 1964