Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Stratigraphy and Oil and Gas Prospects of East-Central AlbertaBy G. S. Hume
THE Plains of east-central Alberta herein described embrace an area from Viking east to the Saskatchewan boundary and from North Saskatchewan river south to Coronation and Monitor (Figure 1). By far t
Jan 1, 1937
-
Shale Rock Mechanical Characteristics: Integration and Validation Using CrossplotsBy D. Moronkeji, R. Maharidge, D. A. Curry, B. J. Davis, U. Prasad, J. Franquet
"Proper shale characterization is crucial in shale gas drilling, exploration, completion and production. Unlike porous sandstone and carbonate reservoirs, the challenge with shales comes from their mi
Jan 1, 2015
-
A re-appraisal of the geology and ore deposits of the Horne Mine Complex at Rouyn-Noranda, QuebecBy David J. Kerr, Robert Mason
"From1927 to1989, the Hornemineproduced53.7 Mt of ore grading 6.1 g/t Au and 2.2% Cu from two large volcanogenic massive sulphide deposits composed primarily of pyrrhotite, pyrite and chalcopyrite. Th
Jan 1, 1990
-
A feasibility study on the reclamation of coal waste dumps by bacterial leachingBy R. G. L. McCready, Marco Zentilli
"Brogan coal containing mean averages of 6,93% w/w total sulphur (1.1% sulphate sulphur, 1.6% organic sulphur and 4.24% pyritic sulphur) and 16.34% mineral ash was used as the test coal in these studi
Jan 1, 1985
-
Surveying BIM in the Lebanese Construction IndustryBy Rita Awwad
Building Information Modeling (BIM) has been gaining a significant edge in the construction industry over the last decade. BIM allows gathering all building information in one shared database that can
Aug 1, 2013
-
Experimental Study On Application Of Bleed In Acid IslBy Meifeng Zhi, Yuqing Niu, Xixin Chang, Fengqi Zhao, Weimin Qiu, Hao Wang, Zhenqian Wen, Zujun Shu
An applicable Eluex process was developed for acid in-situ leaching (ISL) uranium mine in Bayanwula. In this process, uranium was adsorbed with strong base anion resin from the pregnant solution, then
Jan 1, 2020
-
An Outsider Looks at the Problems of Appraisal of Industrial Mineral DepositsBy Jack F. McQuat, Ross D. Lawrence
"Most geologists and mining engineers, in the course of their professional careers, frequently become involved with the appraisal of metalliferous mineral deposits and develop a familiarity with and s
Jan 1, 1971
-
Bison and the oil sands industryBy R. W. Pauls
"Many tens of thousands of hectares of forested land will be disturbed and reclaimed in the surface mineable Athabasca oil sands area during the next few decades. The surface area disturbed by Syncrud
Jan 1, 1999
-
The Problems of the Vancouver Island Coal IndustryBy Charles Graham
It is the general belief that the coal deposits on Vancouver Island are extremely large, and easily available. Indeed, they are frequently described by prominent public men and by writers in the press
Jan 1, 1924
-
Pronto MineBy Stanley W. Holmes
"The discovery of extensive uranium mineralization on the Pronto property in April 1953 initiated a program of staking, exploration, and development unparalleled in Canadian mining history. Within twe
Jan 1, 1949
-
Geology of the Stratmat Boundary and Heath Steele N-5 Zones, Bathurst Camp, Northern New Brunswick (a6701408-1e86-4e3a-8ae3-4dfe8644a28d)By Art Hamilton
The Zn-Pb-Cu-Ag ore deposits of the Boundary and N-5 zones near Bathurst, New Brunswick, occur in a polydeforrned volcano-sedimentary sequence that is part of the Ordovician Tetagouche Group. Massive
Jan 1, 1992
-
Safety First – Remote Rehabilitation of Underground ExcavationsBy G. P. van Greunen
"The rehabilitation of underground excavations has been undertaken as long as mining has existed. The conventional methods have proven to be dangerous, time consuming and expensive. During the constru
Jan 1, 2019
-
Recovery of Rare Earth Elements Adsorbed on Clay MineralsBy V. G. Papangelakis, G. A. Moldoveanu
"Rare earths adsorbed on clay minerals are easily recovered via ion exchange during leaching with inorganic monovalent salt solutions. The leaching efficiency of various salts at 0.5M and 25°C was inv
Jan 1, 2012
-
The new H-W orebody-cutoff grades and mine economicsBy Bruce K. McKnight
"The new H-W orebody was evaluated by considering its production at three technically feasible rates. Capital and operating costs were estimated f or each rate and production sequences were establishe
Jan 1, 1987
-
Efficient Scale Up Of Sensor Based Sorting SystemsBy J. Kolacz
"A new sensor based sorting system has been developed, providing a possibility for laboratory scale testing and further scale-up of the separation results to the industrial operation. The new system c
Jan 1, 2016
-
Muskeg -A Review of Engineering ProgressBy R. A. Hemstock
"Simple classification systems are now being used which will describe adequately the surface vegetation, the topography and the peat for any muskeg condition. Good progress is being made in determinin
Jan 1, 1960
-
Implementation of Air Liquide Shrouded Injector (ALSI) Technology at the Thai Copper Industries SmelterBy N. Wachgama, J. P. T. Kapusta, R. U. Pagador
The Thai Copper Industries smelter (Thai Copper) is located some 200 km southeast of Bangkok near the MapTaPhut deep sea port in one of the industrial centres of Thailand. Although construction of the
Jan 1, 2007
-
Cerro Verde Concentrator – Four Years Operating HPGRsBy S. Koski, J. Vanderbeek, J. Enriquez
"The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper a
Jan 1, 2012
-
Some aspects of implementing the European potentially explosive atmospheres (ATEX) Directive No. 94/9/EC in the British mining industryBy G. Goodlad
This paper describes some of the main aspects involved in implementing the European “Equipment and Protective Systems for Use in Potentially Explosive Atmospheres” (ATEX) Directive (No.94/9/EC) in the
Jan 1, 1999
-
Project DevelopmentBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.
Jan 1, 2015