Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    ISO Management Standard for Energy Management - WIIFM (What's In It For Metallurgy?)

    By A. Taylor, E. Thorn Corthay, R. Storey

    In response to requests from its stakeholders, the International Standards Organisation is engaged in development of an international standard for Energy Management Systems (EnMS) which will become "I

    Jan 1, 2010

  • CIM
    Optimization of the Operation of Hot Stoves

    By Henrik Saxén, Mikko Helle

    The operation of hot stoves used for preheating the blast in the ironmaking blast furnace has a strong effect on the consumption of reductants, economic performance of and CO2 emissions from the steel

    Jan 1, 2015

  • CIM
    Get More Reliable Production from Existing Mobile and Fixed Assets ?Technology Advancements to Optimize Asset Performance

    By Keith Donovan

    Why are we here? Improve equipment performance & health ? Eliminate undesirable downtime and expensive secondary damage ? Maximize equipment life, optimize running costs (reduce costs) ? Improve s

    May 1, 2009

  • CIM
    Towards a Practical Stope Reconciliation Process in Large-Scale Bulk Underground Stoping Operations, Olympic Dam, South Australia

    "This paper deals with the reconciliation of open stope performance at Olympic Dam, South Australia, with a focus on stope stability, recovery, and operational aspects of stope reconciliation in relat

    Jan 1, 2015

  • CIM
    Ventilation and Dust Control at the Wright-Hargreaves Mine

    By G. Reuben Yourt

    IN 1935, Wright-Hargreaves Mines, Limited, initiated an enlarged programme of ventilation. In the mine, surveys were made from time to time by the geological staff, and improvements in ventilation wer

    Jan 1, 1940

  • CIM
    The Outotec Nickel Matte Chloride Leaching Process

    By J. -P. Lempainen, K. Haavanlammi, K. Valkama

    The Outotec nickel matte chloride leaching process is especially suitable for small capacity standalone nickel refineries. The matte is leached with hydrochloric acid and oxygen in multiple steps in a

    Jan 1, 2014

  • CIM
    Energy Recovery from High Temperature Steel, Copper and Nickel Smelter Slags

    By A. Warczok, C. M. Diaz, A. Bergman, T. Utigard, M. Barati

    The world wide consumption of energy is steadily increasing and by 2030 it is forecasted to grow by another 50%, leading to mounting political and economic pressures. For any pyrometallurgical operati

    Jan 1, 2011

  • CIM
    Mines Aurizon Ltée: Casa Berardi et Bien Plus

    By Martin Bergeron

    Producteur d?or de taille intermédiaire Mines Aurizon Ltée Bureau-chef àVancouverMine et projets localisés au Québec2

    May 1, 2011

  • CIM
    Integrating Geology and Borehole Geophysics in a Common Earth Model for Improved Three-dimensional Delineation of Mineral Deposits

    By W. J. Mcgaughey, M. A. Vallée

    "Abstract -The application of geophysical technology to resource delineation aims to improve the quality of resource/reserve estimates by integrating high-resolution survey methods, geophysical modeli

    Jan 1, 1998

  • CIM
    Commuting To Work At The Mattabi Mine

    By J. C. White

    "During the early development of the Mattabi Mine in 1970, discussions with the Ontario Government revealed their policy of prohibiting, as much as possible, the development of new, isolated, single-i

    Jan 1, 1976

  • CIM
    Recent Developments in Rock burst Research at Lake Shore Mines

    By Ernest A. Hodgson

    A SERIOUS hazard which must be faced in some mines, though quite absent in others, is that of rockbursts. Bursts cannot be wholly avoided in such mines, but the hazard would largely disappear if they

    Jan 1, 1943

  • CIM
    Development of Corrosion-Resistant Low Alloy Steels for Commercialization

    By B. Voyzelle

    The deterioration of highway and bridge infrastructure has received considerable attention in recent years because of the billions of dollars needed for repair and rehabilitation. A major factor contr

    Jan 1, 2005

  • CIM
    Borehole hoisting at Sherritt's Fox Mine

    By J. G. Kelly, C. P. Brown

    "In June 1983 a new borehole hoisting system was commissioned at Sherritt Gordon's Fox Mine. Twelve hundred tons-per-day of ore from the 2600 and 2800 levels are being hoisted to the 2000 level t

    Jan 1, 1985

  • CIM
    Assessment of Gravity Recoverable Gold

    By G. E. Agar

    "The distribution of gold in the grinding-classification circuit of an operating gold plant was determined by assaying the size fractions of samples from each of the streams. This analysis identified

    Jan 1, 1993

  • CIM
    Effect of Cu Additions upon the Strengthening Mechanisms and Recrystallization Behavior in Al-Mn-Fe-Si Heat Exchanger Fin Stock

    By Takanori Kokubo, Kenta Suzuki, Tomohiro Sasaki, Toshiya Anami

    "Previous work has shown that the strengthening Al-Mn alloys with copper leads to the formation of an undesirable reduction in recrystallized grain size. In this study the mechanisms of strengthening

    Jan 1, 2018

  • CIM
    Computational Fluid Dynamics Application for Thermal Management in Underground Mines

    By A. P. Sasmito

    It is well known that underground miners are exposed to one of the most dangerous working environments on earth. As mine delve deeper, the geological factor, mine position and climate condition as wel

    Aug 1, 2013

  • CIM
    Nuclear Fuel Resources and Price Trends

    By D. D. Bell

    This paper presents the history of uranium procurement and demand, and takes a look at future requirements. The three basic conclusions drawn are: (1) the productive capacity of former and existing pr

    Jan 1, 1967

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • CIM
    Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto Kennecott

    By Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker

    NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th

    Jan 1, 2019

  • CIM
    Fly-In Program at Rabbit Lake

    By F. R. Nogas

    "Because of the elements of uncertainty and instabilitp associated with single-enterprise communities, there is increasing interest in the alternatives to developing additional new communities of this

    Jan 1, 1976