Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    DFT Study on Reactivity of Different Neutral Flotation Collectors with Cu, Zn and Pb Metal Ions in Solution

    By Manjeet Chowdhry, Qingxia Liu, Phillip Choi, Zhenghe Xu

    Computational chemistry methods, such as density functional theory (DFT), are powerful tools to quantify reagent-mineral interactions encountered in sulphide mineral flotation. A quantitative relation

    Jan 1, 2015

  • CIM
    Reconnaissance-Level Geochemical and Radiometric Exploration Data from the Vicinity of the Rabbit Lake Uranium Deposit

    By E. M. Cameron

    Reconnaissance radiometric and geochemical data have been obtained for an area on the western shore of Wollaston Lake that includes the Rabbit Lake uranium deposit. The study area is extensively drift

    Jan 1, 1977

  • CIM
    A Microstructural Study of the Fatigue and Dwell-Fatigue Behaviour of ATI 718plus® Alloy

    By S. Oppenheimer, P. Au, R. M. Kearsey, J. Tsang, E. McDevitt

    A new superalloy, ATI 718Plus® Alloy (718Plus), has been developed to have a 55oC higher temperature capability over the traditionally used Alloy 718, while maintaining favourable processing character

    Jan 1, 2010

  • CIM
    History and Development of Mount Wright

    By P. J. Bourassa

    Incorporated in 1957 under the laws of the Province of Quebec, Quebec Cartier Mining Co. undertook the development of its low-grade iron ore reserves located at Lac Jeannine in the southwest extremity

    Jan 1, 1977

  • CIM
    A Seismic Investigation of Mine "Bumps" in the Crowsnest Pass Coal Field

    By W. G. Mine

    In September, 1953, seismographs were installed in the Crowsnest Pass area of Alberta and British Columbia to study the 'bumps' which were occurring in the coal mines at Fernie and Coleman,

    Jan 1, 1958

  • CIM
    Suitability of on-Belt Elemental Analysis for Real-Time Ore Quality Measurement and Bulk Sorting

    "Real time analysis of conveyed bulk materials can be used to improve process performance by reducing variability and upgrading ore quality through selective removal of increments of flow that do not

    Jan 1, 2017

  • CIM
    Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • CIM
    Steel From Uranium?

    By Mike Dry, Rod Dry

    If humanity is truly serious about reducing emissions of carbon dioxide into the atmosphere, today’s power plants burning fossil fuels will have to be replaced by power plants that do not emit CO₂. Un

    Jan 1, 2020

  • CIM
    Health, safety, and mine environments research in the mining laboratories of CANMET, Natural Resources Canada

    By M. C. Bétournay, J. E. Udd

    "The Mining Laboratories of CANMET are the principal federal government vehicle for the delivery of mining research in Canada. With research being performed at five locations, which are mostly mining

    Jan 1, 1997

  • CIM
    Ancillary Services and Facilities at Tasu

    By H. M. Thurgood, F. A. Godfrey, F. W. Gilbert

    This is a detailed presentation of the ancillary facilities, including power production, water supply, shiploading facilities, fire-fighting equipment, housing and community services. Additional subje

    Jan 1, 1968

  • CIM
    Industrial Gases for Copper Production

    By A. Deneys

    This paper reviews industrial gases used in primary copper production. Copper smelting industrial gas demand has steadily increased since the first commercial oxygenconcentrate smelting in 1952 [1]. I

    Jan 1, 2007

  • CIM
    Back Analysis of the West Wall Slope Failure at Lab Chrysotile Mine

    By Philippe Caudal

    This paper presents a case study in which a slope failure was observed on the west wall of the LAB Chrysotile mine in the vicinity of the main ramp in January 2010. Airborne LiDAR results were used to

    Aug 1, 2013

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • CIM
    The North American Energy Dilemma - What Does It Mean for the Mining Industry?

    By J. M. Whiting

    "North America has entered a period when greatly increased attention must be given to energy .supply and demand by government, industry and individuals. Such increasing concern about energy will be a

    Jan 1, 1973

  • CIM
    Cerro Verde Project ? Stage 1 ?Copper ? Oxides to Cathodes?

    By Victor R. Eyzaguirre

    Cerro Verde is one of several large porphyry-type copper deposits in Southern Peru. The copper occurs as primary sulphides, with a significant oxide capping. The exploitation of the deposit has been c

    Jan 1, 1978

  • CIM
    Human resources for a global company

    By N. Bédard

    "This paper highlights Cambior’s initial approach for recruiting and retaining its international employees, the importance of proper preparation and the support needed to ensure a competent and stable

    Jan 1, 2004

  • CIM
    Engineering and Construction Of Plant and Wharf Facilities

    By F. S. Thurner

    "This paper describes the engineering and construction activities of the ""design-build"" project awarded to the joint venture of Foundation-Comstock-Janin for the construction of the plant and wharf

    Jan 1, 1976

  • CIM
    Critical hydraulic pressure forecasting of water inrush in coal seam floors based on a genetic algorithm-neural network

    By T. Liu, C. Shi, T. Fu, M. Zhong

    Water inrush in coal mines is induced by the imbalance of the groundwater flow field and the engineering geo-mechanics field. Therefore, to prevent water inrush it is important to predict the critical

    Jan 1, 2008

  • CIM
    Minto Copper-Gold Project IOCG or What?

    Sherwood?s Minto Project ? High grade copper copper-gold deposit ? Yukon Territory, Canada ? Development underway ? Permitted ? Production by mid mid-2007 ? 40 40-50m lbs Cu plus Au/Ag by by-pr

    May 1, 2006

  • CIM
    Follow-up of Production Equipment Availability and its Contributing Factors in Selected Canadian Underground Mines

    By Edith Lafontaine

    Modern underground mines operate fleets of mobile production equipment including drill jumbos, long-hole drills, load-haul-dump machines, trucks and bolters. Their availability has a substantial impac

    May 1, 2007