Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Learning From Experience: Aboriginal Programs In The Resource IndustriesBy Barrie Robb
Outline 1. Mackenzie Aboriginal Corporation (MAC) 2. ACR background 3. ?Learning from Experience? project - What - Why - lessons 3. How Industry could contribute to sustainable Aboriginal comm
May 1, 2008
 - 
                    
                Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree MineBy D Reddy Chinnasane
Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations
Oct 1, 2010
 - 
                    
                Real Time Performance Management in Metallurgical OperationsBy O. A. Bascur, J. Patrick. Kennedy
"The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic
Jan 1, 2004
 - 
                    
                Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfillBy T. Belem
The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective
May 1, 2007
 - 
                    
                A New ERA Tool for State of the Art Metallurgical Balance CalculationsBy Frédéric Flament, Luc Lachance
"The important task of metallurgical accounting that used to be done manually is being more and more automated. Currently available solutions can generate accounting reports without human intervention
Jan 1, 2011
 - 
                    
                Regional Issues Working GroupBy Bill Almdal
Today?s presentation ? Role of the Regional Issues Working Group ? What does RIWG do? ? How can RIWG?s work benefit Stakeholders? ? Review of forecasts vs. reality ? How have past investment comp
May 1, 2002
 - 
                    
                Modified Stability Graph Method with a new Rock Stress FactorThe Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome
May 1, 2011
 - 
                    
                Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface LayersBy Martin Kesting
The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco
Oct 1, 2009
 - 
                    
                Improving Mining & Minerals Plant Performance ? Operations and Maintenance Working Together using new Information TechnologyBy Gregory A. Johnson
Operations and Maintenance departments have long had an adversarial relationship. The widespread evolution and adoption of modern management techniques such as Reliability Centered Maintenance (RCM) a
Feb 1, 2008
 - 
                    
                A Review of Flotation Columns Application in Rougher CircuitsBy M. Massinaei, M. R. Yarahmadi, S. Zeidabadi, M. Oliazadeh
"Although the majority of new flotation column installations continue to be for cleaning or recleaning, an increasing number of flotation projects are specifying columns for roughing or scavenging dut
Jan 1, 2011
 - 
                    
                Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste BackfillBy Kim Le Roux
Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:
May 1, 2002
 - 
                    
                CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra LeoneBy Peter Dunn
London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for
May 1, 2011
 - 
                    
                Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic MethodBy Robert E. McIvor
"The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe
Jan 1, 2011
 - 
                    
                Applications of a Process Control Computer at Brenda Mines LimitedBy C. Larsen, E. Gratch, B. Flintoff, R. Bradburn
"In 1973 Brenda Mines Limited first investigated the potential use of a process computer to aid in the development of a control system for the concentrator grinding circuit. This initial study and its
Jan 1, 1978
 - 
                    
                Rate Dependence of Flexural Tensile Strength of Laurentian GraniteBy F. Dai
Due to difficulties associated with gripping in direct tension, indirect methods are commonly used to measure rock tensile strength. In this work, we adopt an innovative indirect tensile test method:
May 1, 2009
 - 
                    
                Control System Performance Assessment-Best PracticesBy Michel Ruel
"PID loops – also known as base layers or regulatory controls – form the foundation of any plant’s control layer and it is generally accepted that PID loop health has a direct impact on the plant’s bo
Jan 1, 2011
 - 
                    
                Mill Operations - Lean and KeenBy P. R. Richardson
"Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,
Jan 1, 1988
 - 
                    
                Factors That Affect Cemented Rockfill Quality in Nevada MinesBy David M. R. Stone
Underground mining in the gold industry is gaining popularity in Nevada, and with it the use of cemented rockfill is becoming mainstream. Even with today?s high metal prices, however, mining companie
May 1, 2007
 - 
                    
                Computer Control StrategyBy R. J. McLeod
"CONTROL STRATEGYThe Lake Dufault Division of Falconbridge Copper Limited has been concentrating a complex copper zinc ore since late 1964. An ARL X-ray on stream analyzer was installed in 1966 for pr
Jan 1, 1973
 - 
                    
                Upgrading Molybdenite Ores between Mine and Mill Using Microwave/Infrared (MW/IR) Sorting TechnologyBy Eugen Gluck, Gus Van Weert, Peter Kondos
"Microwaves have the capability to heat up sulphides, especially clusters of particles of approx. 1 mm. Some sulphides absorb microwaves more readily than others. Molybdenite is especially effective i
Jan 1, 2009