Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of a Method for the Tracking of Environmental Management: Progress at Solid Energy

    By T Preston

    Solid Energy is the largest coal producing company in New Zealand, employing 500 people and more than 250 mining contract personnel. The coal produced by Solid Energy plays a significant part in the e

    Jan 1, 2004

  • AUSIMM
    Operating Strategies for Custodians of Company Assets Creating Wealth

    By A L. Welsh, P S. Newling

    Mill operators are entrusted to manage what are normally the largest capital assets on any mine site. Achieving maximum utilisation and lowest costs that drive operating margins are realised by applyi

    Sep 7, 2015

  • AUSIMM
    Use of Small-Scale Passive Systems for Treatment of Acid Mine Drainage

    By P Gunn, M Watts

    The general goal of passive acid mine drainage (AMD) treatment is to reduce levels of acidity and metals to acceptable levels. Most treatment systems use either an oxidising or a reducing strategy. In

    Jan 1, 2005

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • AUSIMM
    Paper No. 130. Gold Dredging in Otago.

    As the chief field of the gold dredging industry in Otago is the district traversed by the Molyneux River (called above Cromwell the Clutha) and its tributaries, a brief reference to the geology of th

    Jan 1, 1903

  • AUSIMM
    Salvage and Direct Transfer for Accelerating Restoration of Native Ecosystems on Mine Sites in New Zealand

    By P Williams, S Flynn, R Birchfield, R Simcock, R Toft, P Comeskey

    Direct transfer, or community translocation, comprises salvage and replacement of intact æsodsÆ of vegetation together with underlying soil. It has been applied to New Zealand mine sites restoration o

    Jan 1, 2000

  • AUSIMM
    The spray conversion of nickel flash-furnace matte

    By Kobayashi M, Kametani H

    Particles of nickel flash furnace malle (45 per cent i) were oxidized in a dropping-particle furnace. The particles melted and the molten drops simulated those produced by the atomization of molten ma

    Jan 1, 1986

  • AUSIMM
    Financial Assurance for Mine Closure - A New Zealand Perspective

    A variety of environmental financial assurance instruments are in use across the globe. This paper reviews some of the more common forms currently used in New Zealand, Canada, USA and Australia. In or

    Jan 1, 2006

  • AUSIMM
    Influence of Elements on the Properties of Lead. Part VII.-The Influence of Composition on the Creep Rate of Industrial Lead

    By Met M. E, Worner H. K

    During the past two years, a large number of creep tests has been carried out on electrolytic lead, special assay lead and ordinary refined (Port Pirie) lead. Some of these tests have already been rep

    Jan 1, 1936

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AUSIMM
    Quantification and Controls on as Distribution in Westland, NZ

    By D Craw, J Pope

    The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised

    Jan 1, 2006

  • AUSIMM
    Nickel Slags from the Flash Smelter at Kalgoorlie, Western Australia

    The mineralogy of nickel slags from the flash smelter of Western Mining Corporation Ltd. at Kalgoorlie was studied. Residual magnesium silicates in the sulphide concentrates raise the melting point of

    Jan 1, 1976

  • AUSIMM
    Contributed Discussion "Instantaneous Outbursts of Coal and Gas - A Review" by Alan J. Hangraves ( Proceeding No. 285, March. 1983)

    By Rixon K. L

    Hargraves (1983) has reviewed the phenomenon of instantaneous outbursts of coal and gas with special attention to Australian occurrences. The purpose of this discussion is to highlight some problems a

    Jan 1, 1983

  • AUSIMM
    Phosphate-Bonded Zircon Refractories

    A study was made of zircon powders bonded with phosphoric acid or aluminium orthophosphate. The influence of strength of solution of the phosphatic binders on the modulus of rupture over a temperature

    Jan 1, 1972

  • AUSIMM
    Notes on the Geology of the Pinnacles Mine and District

    A homely simile will serve to epitomise an interpretation of the rock structures and associated phenomena of the block of country under review, as it appears to the writer.Disregarding the many thousa

    Jan 1, 1927

  • AUSIMM
    Low-Enthalpy Geothermal Resources in the Gippsland Basin

    By King R. L

    Low-enthalpy geothermal groundwater resources occur at relatively shallow depths in the Upper Cretaceous/1'ertiary sedimentary sequence in the on-shore Gippsland Basin. The main stratigraphic u

    Jan 1, 1992

  • AUSIMM
    Mineralogical and Geochemical Analysis of Ironsand at Taharoa, New Zealand

    By S Jokanovic, J L. Mauk

    The Taharoa ironsand deposit covers approximately 16 km2 and is located 144 km south of Auckland on the west coast of the North Island, New Zealand. The heavy mineral-rich sands predominantly contain

    Jan 1, 2003

  • AUSIMM
    Energy Efficient Ball Mill Circuit - Equipment Sizing Considerations

    By W Valery, A Jankovic

    The ball mill in closed circuit with hydrocyclones is an industry standard, and well known methodologies exist for equipment sizing, selection and design. However, the potential to improve the capacit

    Jul 15, 2013

  • AUSIMM
    Pitfalls in Vezin sampling for finely crushed materials

    By C J. Kruger, E le Roux

    Anglo American Platinum has adopted a strategy of Best Practice Principles (BPP) for sampling, mass measurement, analysis and metal accounting for more than a decade now. When new plants are designed,

    May 9, 2017

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zealand

    By P E. H Gregg, D Horne, R B. Stewart, N Bolan

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit

    Jan 1, 1995