Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Endeavour 26 North Copper-Gold Deposit, Goonumbla, N.S.W.-Paragenesis and Alteration Zonation

    A new porphyry copper gold district has been discovered at Goonumbla near Parkes in central New South Wales. Endeavour 26 North is the largest deposit known to date with a possible resource of 166

    Jan 1, 1986

  • AUSIMM
    Developing Australia's First Block Caving Opeartion at Northparkes Mines - Endeavour 26 Deposit

    The introduction of a new mining method to Australia is not without its risks and challenges. This paper discusses the processes of planning a new operation, with particular emphasis on block caving

    Jan 1, 1995

  • AUSIMM
    Brisbane Airport Link Project – Design and Construction of the 26 m Span Kedron Caverns: Comparing Monitoring Data with the Design

    By I Coombes, M Trim, Y Sun, M McRae, A Spiegl, H Lagger, A Amon, P Barraclough, M Villeneuve

    The Brisbane Airport Link Project (AirportlinkM7) includes the design and construction of more than 12.5 km of tunnels, with the Kedron interchange including four ramp tunnels that intersect with main

    Sep 17, 2014

  • AUSIMM
    Textural Characteristics of Porphyritic Intrusions Related to Cu-Au Mineralisation in the Endeavour 26 North and Endeavour 27 Deposits, Goonumbla, NSW, Australia

    The Goonumbla district of central-west New South Wales, Australia, hosts four significant porphyry Cu-Au deposits that contain a combined probable ore reserve of 71.7 million tonnes at 1.2 per cent Cu

    Jan 1, 1999

  • AUSIMM
    Ground support design of Northparkes E26 Lift 1 North block cave mine

    By Z Li, A Fleming, S Webster, L Snyman

    Northparkes Mines is developing the E26 Lift 1 North block cave mine, which is adjoined to the existing E26 cave. This paper presents the challenges and methods used to design the ground support syste

    Mar 15, 2021

  • AUSIMM
    Precharging in previously preconditioned ground

    By E Hawkins, S Sheldon

    Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi

    Mar 15, 2021

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AUSIMM
    Draw Parameters and Reserve Estimation using PC-BC at the E26 Block Cave Mine, Northparkes NSW

    By Secis R

    Northparkes Mines is located 27 km northwest of Parkes in central west New South Wales. The E26 deposit is the largest of all defined to-date in the area, containing over 50 per cent of Northparkes&

    Jan 1, 1997

  • AUSIMM
    Manufacturing of FeSiB high-temperature phase change material by silicothermic reduction

    By W Polkowski, M Tangstad, M Wallin, J Jiao

    Fe-26Si-9B (wt per cent) alloy has been identified as a potential high-temperature phase change material (PCM) due to its attractive properties, such as its high latent heat of fusion and low volumetr

    Jun 19, 2024

  • AUSIMM
    Development Practice and Ground Support Installation at Northparkes E26 Mine

    The Northparkes E26 Mine is AustraliaÆs first block cave mine. This paper presents an outline of the design and construction philosophies that drove the project development and details the excavation,

    Jan 1, 1999

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • AUSIMM
    Preconditioning E48 Cave Extension Adjacent to an Active Cave

    By J Samosir, L Snyman

    Northparkes was the first mine in Australia to use block cave mining method which relies on gravity and natural rock stresses to fragment and recover the ore. It was also the first hard rock mine to u

    May 9, 2016

  • AUSIMM
    Computational density functional theory study of triazine adsorption on sperrylite (100) surface

    By X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini

    There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou

    Aug 24, 2022

  • AUSIMM
    Inception and Evolution of Cenozoic Arc-Type Volcanism in Northern New Zealand

    By P M. Black, T Itaya

    Arc-type volcanic activity has been a major feature of the late Cenozoic geological evolution of the Pacific-Australian plate boundary in the northernNew Zealand region. The time/space distribution pa

    Jan 1, 1995

  • AUSIMM
    Reductive Leaching of Manganese Containing Material with Pyrite in a Mild Sulphuric Acid Medium

    By Parida K. M, Paramguru R. K

    Laboratory-scale studies aimed at developing a process for solubilising manganese values from a low grade pyrolusite containing material using low grade pyrite, both available in India, are described.

    Jan 1, 1995

  • AUSIMM
    Use of Isanol in Production Blasting at ISA Mine

    By Bradford NL

    The Isa Mine of Mount Isa Mines Limited produces 2.6 million tonnes of silver-lead-zinc ore annually from sub level open stopes of which approximately 40% comes from the narrow Racecourse orebodies be

    Jan 1, 1985

  • AUSIMM
    Boring a Slime Dam

    By Met B

    IN the followmg paper an account is given of work performed by the author for the purpose of sampling a slime dam on the leases of the North Mount Farrell Co. N.L., at Tullah, Tasmania, during the sum

    Jan 1, 1928

  • AUSIMM
    Mining Truck Operations in Association with Truch-Jig Apparatus

    This paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv

    Jan 1, 1989

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005