Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mini Symposium - Rock Mechanics - Effects Of Moisture On Ground Control In Mining And Tunneling - Design And Construction Of Tunnels In Swelling Rock ? 1. IntroductionBy Herbert H. Einstein
Swelling ground is one of the most feared problem in tunneling. Although usually not causing sudden failures during construction, the very large and long- lasting deformations give contractors and des
Jan 1, 1981
-
On the Carrying Capacity Limitation in Large Flotation CellsBy J. B. Yianatos, F. A. Contreras
Mineral carrying rates across the pulp-froth interface in the range of 1.4-3.2 tph/m2 and bubble surface coverages between 7 and 22 %, have been determined in large rougher flotation cells operated un
Jan 1, 2009
-
Recent Smelting Practice at NorandaBy W. B. Boggs
A paper describing the Noranda smelter was presented at the 1930 annual meeting of the Institute (1). A lacer article appeared in the Trans-actions of the A.I.M.&M.E. in 1933. Since that time there ha
Jan 1, 1939
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landformBy G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan
Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha
Jul 25, 2018
-
Influence of Shot Design Parameters on FragmetationBy Smith N. S, Rholl S. A, Otterness R. E
The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra
Jan 1, 1990
-
An Automated Analyser for Mine Geological Sample - Operational PerformanceBy Ryan A, Dennis R, Dekker D, Ellis W, Sowerby B
An automated facility for non-destructive elemental analysis of mine samples has been developed and tested at Mount Isa in association with the CSIRO. The analysis is based on the prompt and delayed m
Jan 1, 1993
-
Iron and Steel - The Effect of Annealing upon the Hardness of Cold-worked Ingot IronBy Charles Y. Clayton
A study of the literature shows that the greater part of research work on annealing of cold-worked iron has been for the purpose of studying the effect on grain-size and properties other than hardness
Jan 1, 1926
-
Muck Pile Shaping for Draglines and Dozers at Surface CoalminesBy M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
Development of a roof bolter canopy air curtain for respirable dust controlDevelopment of a roof bolter canopy air curtain for respirable dust controlBy W. R. Reed, G. J. Joy, B. Kendall, A. Bailey
"Testing of the roof bolter canopy air curtain (CAC) designed by the U.S. National Institute for Occupational Safety and Health (NIOSH) has gone through many iterations, demonstrating successful dust
Jan 1, 2017
-
Location of pinnae e reefs in southwestern Ontario by gravity surveysBy D. T. A. Symons, M. M. Kapnistos
"Gravity profiles were established over five known Middle Silurian pinnacle reef s in Lambton County, southwestern Ontario. The profiles were approximately 3 km long, with stations every 60 m. Four fa
Jan 1, 1980
-
Dealing with Expansive Rocks in the Los Quilos and Chacabuquito Water Tunnels Andes Mountains of Central ChileBy S. O. Castro, R. E. González, L. E. Velasco, J. M. Van Sint, P. V. Lois
Abstract Several zones with expansive rocks were encountered during construction of two tunnels of the water conduction system for the Chacabuquito Hydropower Plant, located in the Aconcagua river
Jan 1, 2003
-
Flotation Machine DynamicsBy N. Arbiter
During the first four decades of flotation practice, close to 200 machine designs were patented, although only about a score were ever used commercially. By the end of that period, the rigors of use h
Jan 1, 1989
-
RI 3594 Safe Opening And Determination Of Construction Of Detonators - Introduction (fb97dda4-5913-4a0c-b668-91102230213c)By R. L. Grant
[p(,ton~to'rs 'ar-IV uscG.. to explode 9crnli .... sible c}:plosivcs, dynamites, or other hiGh uxplosives. This ?,...!xplosion or detr)nation is brought about by th\.:J energy which i libera
Jan 1, 1941
-
Ventilation Modeling of a Low-Seam Coal Mine to Optimize VentilationBy B. A. Ashley
Rosebud Mining Co. (RMC) is based in Kittanning, PA. As of October 2013, it operated 24 active underground mines in Pennsylvania and Ohio. RMC?s Tracy Lynne Mine is located approximately 5 km (3 mile
-
Extraction Of Manganese From Low-Grade Nishikhal Ore Using Pyritiferous Lignite In Acidic MediumBy P. K. Naik, S. C. Das
Leaching studies of low-grade manganese ore containing 31.77% Mn and 23.71 % Fe from Nishikhal, India, were carried out using pyritiferous lignite as a reductant in sulfuric acid medium. The variables
Jan 1, 2003
-
Present Status And Future Plan For Slurry Face Machine Tunneling - Experiences Until Now And Future Development -By Yoshihiro Kawarabata
INTRODUCTION The shield-driven method in Japan has been adopted widely in soft ground tunneling, namely, subway, water supply, sewer and utility tunnels, and recently this is an indispensable metho
Jan 1, 1979
-
The World's Longest Directional Impact Driven PileBy Robert F. Stevens, Robin Givet, Kenneth Viking
"Summary This paper describes a case of a directional pile installation conducted from an existing oil platform in the Caspian Sea, offshore Baku. Results are presented for 660 mm outer diameter (660
Jan 1, 2014
-
World?s Largest TBM Keeps Niagara Project On TrackBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4-km- (6.5- mile-) long, 14.4-m (47.5-ft) bored tunnel that will run under the city of Niagara Falls from the Upper Niagara River to the Sir Adam Beck power st
Jan 1, 2008
-
Söderströmstunneln – An Immersed Tunnel Founded on Steel Core PilesBy Frank Haehnig, Kjell-Åke Averstad, Johannes Glückert
"AbstractThe Söderströmstunneln is part of the Citybanan project that is currently under construction in the centre of Stockholm. Main part of the lot Söderströmstunneln is a 300m long immersed tunnel
Jan 1, 2014