Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Challenges and Solutions related to the Interaction of Soil Conditioning and Main Drive on Large Diameter EPB TBM’s - A Case HistoryBy Jens Classen
"GENERAL PROJECT DATA The Sparvo Tunnel belongs to “Variante di Valico” project, a new 65 km highway link between Bologna and Florence, designed to renew the existing A1 route and to connect in a fast
Jan 1, 2016
 - 
                    
                Single Point And Full Scale Laboratory Testing Of Timber Chock ConstructionBy Jim Galvin
4 and 6 point timber chock constructions are used extensively on both a systematic and spot basis by Australian longwall operators to support tailgate roadways. In 1996, the School of Mining Engineeri
Jan 1, 2000
 - 
                    
                2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
 - 
                    
                The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction ConsiderationsBy S Goff
The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the
Mar 8, 2011
 - 
                    
                Effect of Casting Speed on Temperature Difference between Copper Plate and Solidifying Shell in Meniscus of Slab Continuous Casting MoldBy Xiang-ning Meng, Miao-yong Zhu
"A three-dimensional finite-element heat-transfer model is conducted to predict temperature of hot copper plate in a slab continuous casting mold and the effect of casting speed on temperature differe
Jan 1, 2011
 - 
                    
                Book news1. Book reviews Nonparametric geostatistics, by S. Henley. London, Applied Science Publishers, 1981. xiv + 145 pp. Reviewer: Douglas M. Hawkins Mineral deposits and global tectonic settings, by A. H.
Jan 1, 1982
 - 
                    
                Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and Exploration (4615660d-b95c-47f0-b07e-3e2b55f50187)By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady
Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp
 - 
                    
                Stability Analysis For Steep-Slope Mines Reclaimed Using The Forestry Reclamantion ApproachThe Forestry Reclamation Approach (FRA) specifies that the upper 1.22 m of material on the reclaimed surface should be left as uncompacted as possible to facilitate tree root growth. One of the main c
Feb 27, 2013
 - 
                    
                Ferrominera Orinoco's Puerto Ordaz Mineral Processing Facility, History,. Capabilities & ProspectsBy Alton G. Woody
Like so many installations of its type approaching middle age, the ore processing and shipping facilities in Puerto Ordaz, Venezuela, have taken a lot of twists and turns in their lifetime. The object
Jan 1, 1978
 - 
                    
                Evaluation of Whole Body Vibration (WBV) of Dumper Operators Based on Job Cycle Mining, Metallurgy and ExplorationBy Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady
Dumper operators are frequently exposed to whole body vibration (WBV) in surface mines. Surface mining activities involve the amalgamation of comparatively high intensity of vibration and extended exp
 - 
                    
                Preliminary Foundation Studies For Raising A Gravity-Arch DamBy Karl J. Dreher, Charles C. Hennig, Gregg A. Scott
INTRODUCTION Theodore Roosevelt Dam is a cyclopean-masonry, gravity-arch dam located on the Salt River northeast of Phoenix, Arizona. Construction of the dam began in 1903 and was completed in 191
Jan 1, 1982
 - 
                    
                Book News1. New publications International minerals/metals review - 1982. Washington D.C., McGraw-Hill, 1983.720 pp. U.S.$1l7. Mining subsidence engineering, by Helmut Kratzsch. New York, Springer, 1983.580 pp
Jan 1, 1983
 - 
                    
                Parametric Analysis Of Piled Rafts Founded On A Tropical Clay Of BrazilBy Renato P. Cunha
The paper presents the results of a comparative and parametric analysis in which a numerical program developed exclusively for groups of deep foundations under general loading (vertical, horizontal an
Jan 1, 2002
 - 
                    
                Part VIII – August 1968 - Papers - Constrained Deformation of Single CrystalsBy W. A. Backofen, G. Mayer
Single crystals of iron, copper, and a Cu-7 wt pct A1 alloy were pulled through conical dies to simulate the constraint in a polycrystalline aggregate undergoing axisymmetric reduction. With Taylor-
Jan 1, 1969
 - 
                    
                Institute of Metals Division - Plastic Deformation of Oriented Gold Crystals (TN)By Y. Nakada, U. F. Kocks, B. Chalrners
THE orientation dependence of work hardening has previously been studied over the entire range, i.e., including special orientations of high symmetry, in aluminum1-3 and silver.* The differences betwe
Jan 1, 1964
 - 
                    
                World’s largest hydraulic shovel, O&K’s RH 300, now operating at Chuquicamata, world’s largest copper mineBy Tim Neil, O&apos
Large is the applicable adjective here. The largest hydraulic shovel in the world, the largest copper mine in the world, the largest copper producing company in the world. The O&K RH 300 hydraulic
Jan 1, 1988
 - 
                    
                Method of Blasting Using Air Tubes Charged in a BlastholeBy Dae-Woo Kang, Sang-Wook Kim, Shin Lee
The Air-tubes blasting method is provided in which a series of aligned boreholes are charged with explosive s and air tubes in a predetermined blasting pattern. The air tube is composed of cylindrical
Jan 1, 2005
 - 
                    
                Book news1. Recent publications Canadian minerals yearbook 1986. Review and outlook. Mineral Report 35. Available from Printing and Publishing, Supply and Services Canada, Hull, Quebec KIAOS9, Canada. $44.70.
Jan 1, 1988
 - 
                    
                Increasing the recovery of thick and closely spaced coal seams in the western US - some geologic and longwall considerationsBy Donna L. Boreck
Introduction Coal has been mined in the western United States since the mid-1800s. The resource is abundant in the West. Despite recent economic conditions, it remains an important part of the nation
Jan 3, 1988
 - 
                    
                Book newsBook reviews Natural gas substitutes from coal and oil, by S.A. Qadar. Amsterdam, Elsevier Science Publishers, 1985. U.S.$83.25. Reviewer: U. Grimsehl High heat production (HHP) granites, hydrotherm
Jan 1, 1986