Search Documents

Sort by

  • IMPC
    The Influence Of Temperature, Potential And Chloride Concentration On The Dissolution Of Pt, Pd And Rh In NaCl Solution

    By K. Lillkung

    The use of secondary sources has become a very attractive option in the production of platinum group metals as the demand for these metals has increased. One of the promising sources are the spent cat

    Sep 1, 2012

  • SME
    TBM Technology for an Australian Coal Drift: The Grosvenor Project

    By Robert Marks, Enrico Dal Negro, Richard Schulkins

    "In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th

    Jan 1, 2016

  • DFI
    Cement Deep Mixing in Lach Huyen Port Infrastructure Construction Project in Northern Vietnam

    By Masakazu Takano, Koji Suzuki, Naotoshi Shinkawa

    "Cement deep mixing (CDM) method successfully applied to a marine construction project in northern Vietnam is reported. The method is classified as wet method, in which cement slurry is injected into

    Jan 1, 2015

  • IOM3
    Annual general meeting of the Institution of Mining and Metallurgy

    The report of the Annual General Meeting of the Institution of Mining and Metallurgy held on Thursday, 20 May, 1971, in the rooms of the Geological Society of London, Burlington House, Piccadilly, Lon

    Dec 1, 1971

  • AUSIMM
    Upgrading Abel Mine Ventilation System - Case Study

    By A Lim

    "As Abel Mine continues to expand and increase production, the requirements of the ventilationsystem have also increased. This paper will outline the stages undertaken to increase the AbelMine ventila

    Jun 1, 2012

  • SME
    The Ivar Project - An Uncommon, Everyday TBM Tunnel

    By Yngve Jordal, Sverker Hartwig

    The IVAR Project is Norway's largest sewer project presently under construction. One part of it is an 8.1 km (26 575 ft) long, 3.5 m (11 ft 6 in.) diam tunnel, bored in one year. The tunneling pr

    Jan 1, 1991

  • SME
    Analysis Of Circular Shafts In Sedimentary Rocks ? Introduction

    By Francois E. Heuze

    We demonstrate a new capability to analyze the behavior of circular shafts in jointed rock. This was made possible by the development of a new, axisymmetric, joint finite element (2). Whereas the only

    Jan 1, 1979

  • SME
    Construction of the Detroit River Outfall No. 2

    By Michael Traylor, Michael Jatczak, Brett Robinson

    The Detroit River Outfall No. 2. is an effluent water conveyance system linking the Detroit Metropolitan Wastewater Treatment Plant to the Detroit River. The 6.4m (21ft) finished diameter tunnel exten

    Jan 1, 2003

  • AIME
    World's First Metallized Pellet Plant Acclaimed As Steelmaking Breakthrough

    Following closely Marcona Corp.'s announcement of its new Marconaflo process for transporting mineral slurries by ship (see pp. 96-97, Sept. 1969 [ ]), Midland-Ross Corp. (M-R) now heralds its me

    Jan 12, 1969

  • SME
    A Review of the Grouting Online 2 of the Cairo Metro

    By Donald P. Richards, David W. Campo, Michel Coudry

    This paper presents a review of the grouting works of Line 2 of the Greater Cairo MetroSystem. The Nile River alluvial deposits underlying this ancient city provided for a challenging and sometimes di

    Jan 1, 1997

  • SME
    Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the Andes

    By Farrukh M. Mazhar, Philippe P. Martin

    Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at

    Jan 1, 2003

  • SME
    Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, California

    By Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow

    The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo

    Jan 1, 2007

  • CIM
    Development of the Drumbo Gypsum Mine, Ontario

    By RAYMOND C. HARTVIKSEN

    The Drumbo Mine is located near Highway 401 between Woodstock and Kitchener in southwest Ontario. The tabular flat-lying gypsum bed is between 1.5 to 2.4 m thick and is situated near the base of the S

    Jan 1, 1984

  • NIOSH
    RI 7674 Detection Of Rubble Zones In Oil Shale By The Electrical Resistivity Technique

    By John W. Brown

    Electrical resistivity surveys were conducted at three sites in Wyoming in an attempt to detect underground rubble zones in oil shale and to determine their size and resistivity contrast. The zones we

    Jan 1, 1972

  • AUSIMM
    Modelling of Shaft Displacement Due to Nearby Mining - Dome Gold Mine, Canada

    By Mandzic E. H

    The Dome Mine of Timmins Mining company is located in South Porcupine, N.W. Ontario. The orebody being mined partially lies in the No. 3 shaft pillar. Stability analysis has been carried out to est

    Jan 1, 1986

  • AUSIMM
    The Use of Decline Haulage at Mount Charlotte to Enable Production from Horizons Below the Underground Crusher

    The low grade Mount Charlotte orebody was first mined with minimum capital expenditure by mechanised cut and fill stoping. The lower block was prepared simultaneously for open stoping by shaft sink

    Jan 1, 1973

  • SME
    Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio

    By Lawrence M. Lenahan

    Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con

    Jan 1, 1989

  • SME
    Specialized Urban Shaft Construction

    By Gary A. Almeraris, Thomas F. Peyton

    This paper describes the innovative procedures employed during the construction of 3 deep shafts within the confines of New York City. The shafts, which varied in diameter from 1.8m (6ft) to 7.3m (24f

    Jan 1, 1989

  • AIME
    Drilling - Equipment, Methods and Materials - An Analysis of Uncertainty in Directional Surveying

    By R. P. Harvey, J. E. Walstrom, A. A. Brown

    In view of the large number of wells directionally drilled from offshore platforms and urban drillsites, greater interest is being focused on the directional survey and on the uncertainty inherent in

    Jan 1, 1970

  • NIOSH
    Evaluation Of Scraper Operator Exposure To Whole-Body Vibration In The Construction Industry: A Task Analysis - Introduction

    By A. Salmoni, E. K. Gillin, T. Eger, A. Cann, P. Vi, M. Hunt

    Kittusamy (Kittusamy & Buchholz, 2004) state that there have been few studies conducted to assess exposure to whole-body vibration (WBV) in the construction industry. They suggest that there is very l

    Jan 6, 2006