    Recovery of Nickel and Cobalt from Bioleaching of Nickel Laterite Ores by Ion Exchange Resins

    By A. Deepatana

    This study compares the use of an aminophosphonate chelating resin Purolite S950 and a sulphonic acid strong cation exchange resin Purolite C160H to recover nickel and cobalt from the synthetic biolea

    Jan 1, 2014

  • SME
    A Case Study Of Controlled District Recirculation

    By A. B. Cecala

    An evaluation was recently performed on a district recirculation system at a trona mine in Granger, Wyoming. A 1.52m (5 ft) diameter, 37.3kw (50 hp) vane axial fan was installed in a crosscut between

    Jan 1, 1991

  • SME
    Mitigation Of The Cplus Failure In The Q7 Cut At Rio Tinto?s Bingham Canyon Mine

    By D. Nutakor

    This paper presents the results of a study conducted on a slope failure that occurred in the Q7 mining cut at Rio Tinto's Bingham Canyon Mine. The slope failure occurred in a weak rock mass with

    Jan 1, 2012

  • NIOSH
    RI 9616 - Assessment of Airborne Dust Generated From Small Truck-Mounted Rock Drills

    By S. J. Page, J. A. Organiscak

    Dust surveys were conducted around small truck-mounted rock drills operating at surface coal mines to assess their airborne respirable dust generation and in-service dust control methods. Of four ou

    Jan 1, 1995

  • AIME
    Akita Electrolytic Zinc Plant And Residue Treatment Of Mitsubishi Metal Mining Company, Limited, Akita, Japan

    By Eifu Moriyama

    In 1953, Akita Plant, having a capacity of 560 tons per month, was built at Akita city by Mitsubishi Metal Mining Co., Ltd. for the purpose of treatment of the Ikuno and Akenobe Mines's zinc conc

    Jan 1, 1970

  • AUSIMM
    Methane Drainage Under the No. 7 Longwall Block Appin Colliery

    By Regan R

    Appin Colliery mines the Bulli Seam with a gas composition of 98.5% methane and 1.5% carbon dioxide. Relaxation of the strata generally occurs to below the base of the Wongawilli Seam, some 40 m be

    Jan 1, 1982

  • SME
    Osmosampler: A Salt-Gradient Powered Probe Device To Provide Temporal Records Of Pore Fluid Concentrations In The Deep Seabed

    By Jeffrey P. Chanton

    A specialized Pore-Fluid Array sampler (PFA) was designed to collect and store pore-fluids to monitor temporal changes of ions and gases in gas hydrate bearing sediments. We tested the hypothesis tha

    Jan 1, 2008

  • DFI
    Tension Tests On Driven Pipe Piles In Sand - Synopsis

    By Alan J. Lutenegger

    A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The

    Jan 1, 2000

  • AIME
    Block Cave Mining at the Mather Mine

    By Paul R. Bluekamp

    The Mather Mine property is composed of a 5.2 sq km (2 sq mile) area within the Cities of Ishpeming and Negaunee which are located in the Upper Peninsula of Michigan. Production in this mine started i

    Jan 1, 1981

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • SME
    Overshot Loaders

    By Robert L. Sundeen, Richard V. Wenberg

    Overshot loaders are loading machines which fill a front-mounted bucket by crowding and bucket lifting, passing the loaded bucket over the machine and throw¬ing the load into a haulage unit to the rea

    Jan 1, 1982

  • SME
    Record Performance Of TBM In The 13.5 Km Amlach Tunnel, Austria

    By Hans Janzon, Ernst Buechi

    INTRODUCTION The headrace tunnel in Amlach is part of a hydro electric power scheme near the city of Lienz in south west Austria. The project is owned and developed by Tiroler Wasserkraftwerke AG,

    Jan 1, 1987

  • SME
    Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction

    By M. D. Scott

    Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972

    Jan 1, 1976

  • AIME
    Some Observations In Ore Search - Symposium

    By L. C. Graton

    [CONTENTS PAGE INTRODUCTION AND ACKNOWLEDGMENTS. By George M. Fowler2 Question 1-Is Structural Deformation of Some Character Always Necessary for the Migration of Mineralizing Solutions, Especial

    Jan 1, 1940

  • SAIMM
    Reply To H.G. Denkhaus ?Brittleness And Drillability? - In The Journal Of SAIMM, Vol 103. No. 8. Pp. 523

    A large number of brittleness concepts have been used in very different studies in the literature. One of them is the B1brittleness concept. In this study, the objective is to criticize the B1 brittle

    Jan 1, 2003

  • NIOSH
    RI 7393 Development Of High-Temperature Vanadium-Base Alloy

    By G. H. Keith

    A vanadium-base alloy consisting of the following elements in weight-percent--molybdenum, 20; titanium, 10; carbon, 0.1; silicon, 0.5; and yttrium, 0.5--had exceptionally high strength at temperatures

    Jan 1, 1970

  • AUSIMM
    Laboratory Studies of the Treatment of Liquid Waste Streams from Uranium Milling Operations

    Neutralization with lime is a simple, cheap, and effective means of treating acid raffinates from uranium processing to' raise the pH, reduce the concentrations of dissolved salts (including heav

    Jan 1, 1975

  • AUSIMM
    Stope Stability at the Big Gossan Skarn Deposit, Papua, Indonesia

    By G de Jong, W Sunyoto, K Sari, P Silalahi

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Big Gossan mine is operated by PT Freeport Indonesia and is one of the largest stope-an

    Mar 18, 2015

  • AUSIMM
    Raiseboring Experience with the Wirth Two Stage Sequential Reaming Head and HG330 Raiseborer

    By Fletcher A. E W

    Ever since it made its debut in 1962, in the form of a Robbins 31R, the raiseborer has become an accepted tool in the mining and civil construction industries. The first raiseborer to be used in th

    Jan 1, 1987

  • DFI
    Structure Support on Laterally Swept Piles

    By Morgan L. Race, Matthew R. Glisson

    "Most driven pile projects have plumbness limits from 0.25 in/ft (21 mm/m) to 0.5 in/ft (42 mm/m) to control bending stresses. For two projects, the project teams performed static load testing to eval