Search Documents

Sort by

  • SME
    Geology And IBM Performance In The Blue Mountain Tunnel Sultan River Hydroelectric Project

    By Arthur B. Arnold, Curtis T. Scott

    The Blue Mountain Tunnel is a part of the Sultan River Hydroelectric Project. The Sultan Project is in the Cascade Mountain Range, approximately 56 km (35 mi) northeast of Seattle, Washington. The

    Jan 1, 1987

  • DFI
    Threading Piles Past Underground Assets In Central London

    By Alexander Nikolic

    The paper presents the foundation design and construction of a landmark urban redevelopment scheme in central London, UK. The scheme comprises the new Tottenham Court Road Underground station, Crossra

    Jan 1, 2011

  • SME
    Longwall Control At Shoal Creek

    By Debasis Deb

    The first version of the longwall strata control and maintenance system (LSCMS) has been successfully developed by the Strata Control Re¬search Team at the University of Alabama. The system includes a

    Jan 1, 1997

  • AIME
    Papers - Oil Recovery - Law of Flow for the Passage of a gas-free Liquid through Spherical-grain Sand

    By William Schriever

    The flow of a gas-free liquid through a spherical-grain sand has been investigated by S1ichter.l By theoretical considerations involving a rather large number of approximations he arrives at the follo

    Jan 1, 1930

  • SAIMM
    In-situ stress measurements in an underground oil storage cavern using hydro-fracturing and overcoring methods

    By S. O. Choi, C. Park, C. Sunwoo

    Two methods of stress measurements have been executed on the surface and underground to con-struct an oil storage cavern using hydro-fracturing and overcoring method. The first measurement has been pe

    Jan 1, 2003

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Butte: A World Class Ore Deposit

    By Steve J. Czehura

    The Butte quartz monzonite is the host rock for early porphyry copper style mineralization and subsequent mesothermal-epithermal, enargite-gold style veining that transects the district. The east-west

    Jan 1, 2006

  • TMS
    Manganese Oxide Composites as Electrode Material for Electrochemical Capacitors

    By R. N. Reddy

    The Pseudo capacitance of layered type Mn02 electrode material for electrochemical capacitors (EC's) was investigated. MnO2 was synthesized in our laboratory. Mn02 was prepared from heating of KM

    Jan 1, 2002

  • SME
    Gold Analysis By Combining Fire Assaying With Neutron-Activation Analysis - Introduction

    By Michael M. Kimberley

    Gold is sufficiently valuable that concentrations as small as 1 p.p.m. may support low-cost mining. Mindful of this, Sunoco Energy Development Company (Sunedco) obtained fire-assay analyses on some su

    Jan 1, 1981

  • AIME
    Sandwich Belt High Angle Conveyor - Applications In Open-Pit Mining

    By J. A. Dos Santos

    High angle conveyor (HA C) systems in open-¬pit mining offer many advantages over the traditional, truck only, haulage systems. These include superior energy efficiency, less dependency on petroleum p

    Jan 1, 1985

  • ISEE
    Source Scaling Study of Single-Fired Mining Explosions

    By Brian Stump, Rong-Mao Zhou

    A series of single-fired (simultaneously detonated) explosions were conducted in an Arizona copper mine. The explosions spanned yields from 1700 to 13600 lbs (773 to 6169 kg) and were all detonated in

    Jan 1, 2006

  • AUSIMM
    Tunnel Groundwater Inflow Measurement

    By R Witt, M Lowing

    Tanking of tunnels is now often specified when inflows exceed as little as 1 L/s/km with a unit distance of 100 m. To demonstrate inflows over a 100 m segment of a tunnel are less than 0.1 L/s with a

    Jan 1, 2008

  • DFI
    Size And Loading Rate Effects Observed In Plate Load Tests On A Fill

    By Kazuyuki Matsuzawa

    A series of plate loading tests were carried out on a loam ground in order to investigate the influences of the plate size and the loading rate on the observed load-settlement relations. Two circular

    Jan 1, 2006

  • SME
    Case History Of The Wachovia?Knight Theater Pedestrian Tunnels

    By Eric Eisold

    The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea

  • SME
    Design Criteria For Thin Seam Shearer Longwall

    By T. C. Bibb

    Longwalls using shearers in seam heights of less than 1.2 m (48 inches) are relatively rare in the U.S. Westmoreland Coal Company is currently operating a shearer-equipped longwall at a cutting height

    Jan 1, 1985

  • AUSIMM
    The Wapolu gold deposit, Papua New Guinea: discovery to development

    Gold mineralisation was first noted in 1983 at the Wapolu Point area of Fergusson Island, Papua New Guinea (PNG) during a follow-up regional reconnaissance program. Subsequent exploration programs thr

    Jan 1, 1994

  • SME
    Design And Installation Of Large Diameter Sub-Sea Connecting Shafts For The Seabrook Station Cooling Water System

    By Jean-Pierre Nossereau, Allen J. Hulshizer

    The main thrust of this paper covers the design, installation techniques and experience associated with the installation of eleven 1.5 m (4'-11") and three 2.87 m (9'-5") diameter shafts in

    Jan 1, 1981

  • SME
    Large Flotation Machine Development and Operation (9e862699-2208-4019-91ae-d42126e18423)

    By M. Churchill, V. R. Degner

    Over the past two decades, declining ore body grades and increased operating and construction costs have provided an incentive for the development of progressively larger flotation machines. As a resu

    Jan 7, 1982

  • SME
    Vertical Crater Retreat: an Important New Mining Method

    By L. C. Lang

    INTRODUCTION The introduction of 165-mm (61/z-in.) holes to underground mining operations has made possible the application of Canadian Industries Ltd's (CIL) vertical crater retreat (VCR) minin

    Jan 1, 1982

  • SME
    The Seymour Capilano Twin Tunnels Project, Vancouver, BC

    By Don Phelps, Dean Brox, Peter Procter, Andy Saltis, Tom Morrison, Jeff Pringle

    The Greater Vancouver Water District is currently constructing the Seymour-Capilano Water Filtration Project to enhance the quality of drinking water in the Vancouver metropolitan area. The Seymour-Ca

    Jan 1, 2005