Search Documents

Sort by

  • AIME
    Technical Notes - Some Useful Tables for Approximating Smooth Curves by Fifth-and-Lower Degree Polynomials

    By H. H. Rachford, W. P. Schultz

    The use of computing machines to solve physical problems has made it imperative to represent physical data in a form computing machines can use. Although curve-fitting is an old and well-practiced art

    Jan 1, 1956

  • CIM
    World?s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation

    By Rajiv Kalra

    This paper reviews the following aspects of the world?s largest manufactured Grinding Mill?s in terms of diameter and power, along with the world?s biggest shop assembly and trial run of the mills del

    Jan 1, 2012

  • CIM
    World’s Largest 28 MW AG Mills, Largest Shop Trial, One Piece Delivery & Installation (26e1b765-3ec1-447d-8206-6ab79dbb100f)

    By Rajiv Kalra, Ji Jiangang

    "This paper reviews the following aspects of the world’s largest manufactured Grinding Mill’s in terms of diameter and power, along with the world’s biggest shop assembly and trial run of the mills de

    Jan 1, 2012

  • SME
    Solvent Extraction Approach To Recover Boron From Wastewater Generated By The LCD Manufacturing Industry: Part 1

    By D. Mohapatra

    The possibility of using 2,2,4-trimethyl-1,3-pentanediol dissolved in tetrachloromethane as extractant for boron recovery is discussed. The parameters optimized for this purpose are contact time, boro

    Jan 1, 2008

  • AUSIMM
    Planning for an Integrated Dump Leach and CIP Operation at Mt Gibson Gold Mine

    By Moylan T, Stewart D

    A case study examining the procedures and financial benefits of introducing dump leaching to augment the Mt Gibson Gold Project CIP operations is discussed. Metallurgical testwork, followed by pilot

    Jan 1, 1992

  • NIOSH
    RI 7908 Mathematical Study of a Propagating Flame and Its Induced Aerodynamics in a Coal Mine Passageway

    By Donald N. H. Chi

    The unsteady, one-dimensional, compressible-flow equations have been solved numerically for a deflagration propagating through a gallery of finite length closed at the ignition end and open at the opp

    Jan 1, 1974

  • SME
    Geology And Mineralization Of The Central Divide Mining District, Esmeralda County, Nevada

    By James M. Prudden, E. P. Jucevic

    The Divide mining district occupies the center of a Tertiary caldera hosting the famous Divide silver lode and the crosscutting Gold Mountain mines. The northwest-southeast trending silver lode hosted

    Jan 1, 1990

  • AIME
    Papers - New Method for Determination of Stress Distribution in Thin-walled Tubing (T.P. 1384, with discussion)

    By G. Sachs, G. Espey

    Simple methods can be used for the determination of the residual stresses in thin walled tubing if the stresses consist of high tensile stresses at the one surface and high compressive stresses at the

    Jan 1, 1942

  • AIME
    Papers - New Method for Determination of Stress Distribution in Thin-walled Tubing (T.P. 1384, with discussion)

    By G. Sachs, G. Espey

    Simple methods can be used for the determination of the residual stresses in thin walled tubing if the stresses consist of high tensile stresses at the one surface and high compressive stresses at the

    Jan 1, 1942

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • CIM
    Analysis of the failure of a large hangingwall wedge: Kidd Mining Division, Falconbridge, Ltd.

    By M. Board, R. Pakalnis, S. Seldon, R. Brummer

    The Kidd operation mines roughly 10 000 tpd of copper and zinc ore from underground and employs about 700 personnel. In the late summer and fall of 1997, major movements in the proximity of the east w

    Jan 1, 2000

  • SME
    Extensive Mechanization Produces Record Performance In Drill-Blast Tunnelling

    By Hans Hamrin

    Three drill-blast cycles of 3.1 m advance achieved in one working shift of 7.5 hours at the Holsfjorden Tunnel project in Norway. The tunnel, 5235 m long, with a cross section of 8.6 m2, was completed

    Jan 1, 1987

  • SME
    New Water Supply—Oslo - RETC2023

    By Ingunn Opland, Silje M. Tinderholt

    Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av

    Jun 13, 2023

  • IIMP
    Optimización del proceso de lixiviación de mineral ROM utilizando celdas dinámicas en yacimientos auríferos marginales con alto contenido de granulometría fina

    By Segundo Velásquez, Enrique Mego, Robert Montes

    La pila de lixiviación de minera Coimolache, después de 11 años de operación, actualmente cuenta solo con espacio para cargar mineral en el lift 18 a 150 m. de la geomembrana de base. Esta altura rest

    Sep 30, 2022

  • SME
    Mining Using NATM Techniques in the Toukoshan Formation on C230 Taiwan High Speed Rail

    By Gary B. Hemphill

    The 345 km long Taiwan High Speed Rail Project will connect the island’s two most populated cities, Taipei and Kaohsiung. Kaohsiung is the world’s third busiest port. The 23 km of alignment on Cont

    Jan 1, 2003

  • SME
    Preliminary Design of Mined Transit Stations and Deep Tunnels in Seattle

    By Gordon T. Clark

    The preliminary design of four mined stations and 7.2 km (4.5 miles) of tunnels for Seattle’s light rail transit system is described. Constraints that influenced the design and options that were studi

    Jan 1, 2001

  • SME
    Cavity detection using high-resolution seismic reflection methods

    By K. L. Branham, D. W. Steeples

    Surface collapse over abandoned sub- surface coal mines continues to be a problem in many parts of the world. High-resolution P-wave reflection seismology was successfully used to locate water-filled

    Jan 1, 1987

  • SME
    Boring and Jacking of “The Big Pipe” Columbia Slough Consolidation Conduit in Portland, Oregon

    By S. Michael Feroz, Michael J. Britch, Frank S. Buehler

    The City of Portland is constructing the Columbia Slough Consolidation Conduit as a part of its commitment to reduce combined sewer overflows into the Willamette River and the Columbia Slough. Known a

    Jan 1, 1999

  • SME
    A New Device Of A Hydraulic Drill For Anchors

    By Yuji Tsuneno, Yoshikazu Mikami, Yasuo Takeuchi

    A new device was successfully developed in order to overcome the difficulty of drilling longer holes for anchors in soft soil bedrocks or swelling bedrocks, which is one of the major impediments to ra

    Jan 1, 1981

  • SME
    Exploration Decision Analyses for the Brightwater Tunnels

    By L. Maday, V. J. Perrone, M. B. Gilbert

    INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen

    Jan 1, 2005