Search Documents

Sort by

  • SAIMM
    Numerical modelling for the design of shortwall powered support units on the 2 seam at Matla Coal

    By J. W. Latilla, J. J. van Wijk

    In late 1997 a request was received to assist with determining the powered support unit (shield) load capacities for the planned 2 seam short wall. This project had a number of aspects which made it a

    Jan 1, 2003

  • CIM
    The Aubry Pegmatites: Exploration for Highly Evolved Lithium-Cesium-Tantalum Pegmatites in Northern Ontario

    By J. A. Morgan, P. M. Dimmell

    Abstract - The Aubry pegmatites are located on the Seymour Lake property, 15 km north of Lake Nipigon in northwestern Ontario. The property lies within the Caribou Lake-Marshall Lake greenstone belt a

    Jan 1, 2005

  • CIM
    Performance of the two EPBM in Istanbul Twin Metro Tunnel Excavations in Weak Rock

    By Ibrahim Ocak

    The prediction of machine utilization time and determining machine performance plays an important role in scheduling and planning tunnel excavation and data base created serve a major role in further

    Aug 1, 2013

  • SME
    Geologic Constraints on Mining and Recovering Coal in the Western US

    By Ralph J. Anctil, James E. Palmer

    According to relatively recent estimates by the US Geological Survey and the US Bureau of Mines, there are more than 0.9 Tt (one trillion tons) of remaining identified coal resources in the seven majo

    Jan 8, 1982

  • SME
    Performance Study Of Wagner-Biro ASL Liner System At Pinto Valley ? Introduction

    By Jack V. Hill

    A unique type of grinding mill liner has been developed by Waagner-Biro A.G. of Austria. This liner system, termed an angular spiral lining (.ESL), was, successfully tested by Magma Copper Company&apo

    Jan 1, 1982

  • AIME
    Bucket Wheel Excavator Technology for Mining Lignite in Texas

    By Karl J. Benecke

    Though the first patent on a bucket wheel excavator (BWE) was granted in 1881 in the US, this technology was developed in Germany to the high standards of today. However, this development was only pos

    Jan 1, 1980

  • SAIMM
    Economic optimization of the number of boreholes and deflections in deep gold explomtion

    By E. J. Margi

    Deep gold exploration such as is used for Witwatersrand gold deposits is both expensive and time-consuming. This paper provides quantitative guidelines as to the economic optimum number of boreholes a

    Jan 1, 1987

  • TMS
    Biodegradation Of Cyanide Under Anaerobic Conditions

    By H. J. Garcia

    Biodegradation of cyanide by microorganisms isolated from solids previously exposed to cyanide has been investigated. Initial sodium cyanide concentration was 300 ppm at pH 10.5. The kinetics of biode

    Jan 1, 1994

  • AIME
    Shaft Sinking At Nose Rock

    By Gerald G. Griswold, James O. Greenslade, Cherie Tilley, Richard Reseigh

    INTRODUCTION The Harrison Western Corporation, a leading Denver based mine contracting and engineering concern, is presently engaged in sinking two 1,006 m (3,300 ft) shafts for the Phillips Uraniu

    Jan 1, 1982

  • SME-ICGCM
    Surface Subsidence Caused By Flooding and Dewatering at Four Abandoned Coalmines in the US

    By Kewal K. Kohli, Stefanie Self

    "Three cases of surface subsidence investigated over abandoned coal mines after flooding in one case and dcwatering in two cases are presented in this paper. Mining was conducted by the room and- pill

    Jan 1, 2010

  • CIM
    Grinding Circuit Improvements at Barrick Cortez Gold Mine

    By James R. Wickens, David La Rosa, Robert E. McIvor, Adrian Dance

    "The comminution circuit at Barrick Cortez Gold Mine uses an open circuit primary jaw crusher followed by a standard SABC grinding circuit. The grinding circuit incorporates a 26’Ø x 11’ SAG mill, an

    Jan 1, 2009

  • SME
    Musculoskeletal Disorders Among Dozer Operators Exposed to Whole-Body Vibration in Indian Surface Coal Mines Mining, Metallurgy and Exploration

    By Sandeep Kumar Jeripotula, Govinda Raj Mandela, Aruna Manglapady

    Dozer operators are frequently exposed to whole-body vibration (WBV) during the execution of their work. Occupational exposure to WBV in Indian surface coal mines was evaluated by measuring vibration

  • SME
    Stability analysis for steep-slope mines reclaimed using the forestry reclamation approach - SME Transactions 2013

    By D. Kumar, R. J. Sweigard, J. Silva

    The Forestry Reclamation Approach (FRA) recommends that the upper 1.22 m (4 ft) of spoil material on reclaimed surfaces should be left as uncompacted as possible to facilitate efficient tree root grow

    Jan 1, 2013

  • AIME
    Otis Passenger Elevator At Inspiration Shaft

    By C. E. Arnold

    A BRIEF description of this installation was included in a recent paper by H. Kenyon Burch.1 The purpose of the present paper is to amplify Mr. Burch's description, as it is felt by the writer th

    Jan 12, 1917

  • DFI
    Bertha Rescue Shaft – SR99 Tunnel

    By Lance Rasband, Richard Hanke

    "Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the

    Jan 1, 2015

  • DFI
    Mansueto Library: Drama below Ground and Above

    By Patrick J. Lydon, Gregory A. Terri

    "The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The

    Jan 1, 2013

  • SME
    Case studies illustrate the need for a new concept of coal pillar design

    By Syd S. Peng

    Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust

    Jan 11, 1986

  • NIOSH
    Low-Pressure and Micro-Orifice Impactors - Chapter 5

    By Virgil A. Marple, Susanne V. Hering

    "5.1 IntroductionTraditional impactors do not offer much size resolution for submicrometer particles; typically their finest size cut is around 0.4 µ.m. Yet for many aerosol applications it is useful

    Mar 1, 1989

  • AUSIMM
    Vertical and inclined raise bore performance at Dugald River mine

    By M Lee, J F. Carswell, G Reitsema

    "The increased costs of underground mining have continually challenged engineers to identify opportunities for alternatives to common approaches to underground development. Considerations to the desig

    Oct 16, 2017

  • SME
    Shallow Microtunneling below a Critical Runway

    By Matthew Grzelak, Gulsah Erinc, David R. Chapman

    "The third phase of the Bagram Drainage System project at Bagram Air Force Base in Afghanistan included construction of a shallow, 540-m long, 1.8-m inside diameter drainage tunnel. The tunnel penetra

    Jan 1, 2016