Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Interstitial Compounds As Fuel Cell Catalysts: Their Preparative Techniques And Electrochemical TestingBy S. Akhtar
Interstitial compounds of iron, cobalt, and nickel, and their binary and ternary mixtures with silver, gold, palladium, and platinum were prepared and tested as fuel cell catalysts. The first step i
Jan 1, 1970
-
Improving the Pelletization of Fluxed Hematite Pellets by Hydrated LimeBy Wei Yu, Tiejun Chun, Jian Pan, Deqing Zhu
In this paper, the technology of producing fluxed pellets by using hydrated lime as binder instead of bentonite was carried out. Green balls with 0.8% bentonite and others with 2% hydrated lime were o
Jan 1, 2011
-
RI 5720 Spectrophotometric Determination Of Trace Amounts Of Copper In Tungsten Metal Powder ? Summary And IntroductionBy A. S. Prokopovitsh
A spectrophotometric method for the determination of small amounts of copper in tungsten metal powder using the principle of solvent extraction has been developed by the Federal Bureau of Mines. The m
Jan 1, 1961
-
The impact of rip lines on erosion at the Ranger Mine SiteBy M J. Saynor, J B. C Lowry
The Ranger Uranium Mine is located in the wet-dry monsoonal tropics approximately 250 km east of Darwin in the Northern Territory of Australia (Figure 1). Mining of open-cut ore bodies commenced in 19
Jul 25, 2018
-
The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/
Jan 1, 1984
-
The Exploration History and Geology of the Polymetallic Reward Deposit, Mt Windsor Volcanic Belt, North QueenslandBy Laing W. P, Neill D. M, O&apos
The Reward polymetallic massive sulphide deposit occurs 35 km south of Charters Towers, adjacent to the Highway gold deposit (Fig. 1). It is hosted within rhyolitic lavas and interlayered volcanicl
Jan 1, 1989
-
Geology Of The Lower And Upper Coal Seams And The Mining Methods At Çayirhan Coal Basin, Beypazari, TurkeyBy H. Köse, C. Tatar, C. Helvaci, F. Simsir
The Çayirhan coal basin is located 124 km (77 miles) west of Ankara,Turkey. With approximately 520 Mt (570 million st) of lignite reserves, the Neogene Çayirhan basin is one of the important coal dist
Jan 1, 1994
-
Flash ConvertingBy W. G. Davenport
The flash furnace is used for smelting concentrate to (i) high-Cu matte and (ii) molten metallic copper. It is also used for converting solidified/crushed matte to molten metallic copper. This is flas
Jan 1, 2001
-
Laboratory Studies Of Disc Cutters For High Speed Tunnel Boring In Soft RocksBy Levent Ozdemir, Gerald Dollinger
An extensive series of linear and rotary cutting tests were run in soft and medium strength rocks at the Earth Mechanics Institute of the Colorado School of Mines to investigate the possibility of ver
Jan 1, 1989
-
Discussion - Scale-Up of a Mixer-Settler Extractor Using a Unit Operations Approach – Lindholm, David C. and Bautista, Renato G. – Transactions SME/AIME, Vol. 260, No. 1, March 1976, pp. 1-5By John Dasher
Extrapolation is a useful technique, but it can be overdone. Seldom is it justified to study over a range of 1 to 6 and extrapolate the results to 150,000. It is especially dangerous if the extrapolat
Jan 1, 1977
-
Preliminary Desliming Tests With North Carolina Phosphate Using A Pilot-Scale Linatex HydrosizerBy Louis M. Schlesinger, Joel F. Hutwelker
A pilot plant was constructed to attrition scrub and deslime North Carolina phosphate ore. A 15.2 cm (6 in.) diameter pilot-scale Linatex Hydrosizer was used for desliming. Four tests were run at a th
Jan 1, 1993
-
Underground Diesel Use – Homestake Mining’s ExperienceBy John R. Marks
The first 0.7 m3 (1 cu yd) diesel load- haul-dump vehicle (LHD) arrived at the Homestake Gold Mine in Lead, SD in I969 to muck a ventilation drift. Others soon followed. Mechanization has subsequently
Jan 1, 1993
-
Integrated Mixed Face Mining And Support Systems Washington Metropolitan Area Transit Authority Contract No. 1K0011By Vinton A. Garbesi
The construction involved in the Washington Metropolitan Area Transit Authority (WMATA), Contract No. lK0011 (K-1), encompassed some 2,621 meters of single track parallel tube rapid transit tunnels, 3
Jan 1, 1979
-
The Development of Acoustic Emission and Microseismic Monitoring Techniques in ChinaBy Wu Y, Qu Q
The Central Coal Mining Research Institute has developed the MAE acoustic emission monitoring system, the BD4-1 portable acoustic emission monitor and the MRB rock burst monitoring system. In the MAE
Jan 1, 1991
-
Ventilated Drum Controls Longwall Dust And MethaneBy Robert A. Jankowski, Jonathan Kelly, Edward F. Divers
Results for the first underground test of the ventilated drum in a U.S. coal mine are presented. Tests were conducted by the Bureau of Mines through a contract research program with Foster-Miller, Inc
Jan 1, 1987
-
Evaluation Of Degree Of Overconservatism In Api Shaft Friction Of Piles In Marine Sand Of The Arabian GulfBy Ahmed H. Bukhary, Naser A. Al-Shayea
The objective is to assess the overconservatism in the parameters used for designing offshore piles. Methodology includes analysis of shaft friction data obtained from more than five different locatio
-
Effect of -1 mm particle size fraction on JPU permeability and granulation characterisationBy O A. Aladejebi, S Mitra, T Singh, D O’Dea, S, T Honey
Granulation of the iron ore blend and the additives is the foremost step in the agglomeration of iron ore fines to achieve a permeable bed during sintering, which is crucial for sinter productivity. T
Sep 18, 2023
-
Temporal Variation Of Environmental Characteristics By Changing Water Column Structure In The Northeast EquatorialBy Seung-Kyu Son
Environmental properties of the northeast Equatorial Pacific along 131.5 degrees west, between 5 degrees and 13 degrees north latitude, were investigated in association with changes in water column st
Jan 1, 2001
-
Considerations for Design of Production Level Drawpoint Layouts for a Deep Block CaveBy P Bartlett, K Naidoo
Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively
Jan 1, 2000
-
Cooling In Development Workings In Very Hot Ground - IntroductionBy Yoshio Hiramatsu
In Toyoha mine near Sapporo, the ground temperature is very high, perhaps due to inflow of hot mineral water, the origin of which may be rock masses intruded by the igneous activity in the Tertiary pe
Jan 1, 1980