Dartbrook Mine- Greenfield Opportunities in the Upper Hunter ValleyDartbrook mine is a new greenfields thermal coal longwall mine located n the Upper Hunter Valley ten kilometres north of Muswellbrook Figure 1). Construction began in April 1993 with coal extraction
Jan 1, 1995
-
Water Jet Rock Cutting and Its Application to Tunnelling Machine PerformanceBy Chun K. Ip, Simon T. Johnson, Robert J. Fowell
Laboratory conducted cutting tests at traverse speeds up to 1 m/s have been undertaken with high pressure water jets assisting the cutting action of drag tools. Four sandstones and one limestone have
Jan 1, 1986
-
Use Of Numerical Modeling In Mine Design At Falconbridge, Ltd.By B. Hearn, O&apos
Falconbridge, Ltd. operates six mines (the strathcona, Fraser, Lockerby, Onaping, East and Kidd Creek) in the Sudbury and Timmins districts of northern Ontario (Fig. 1). These mines vary in depth to a
Jan 1, 1988
-
Modern Blast Vibration Monitoring, Modelling and Frequency Control at Tara Mines, IrelandBy Brendan O'Reilly, Outokumpu Zinc, Geoff J. Johnston, S Durucan
Historically vibration monitoring has dealt primarily with surface blasting or "near field" monitoring of underground blasts. The Situation at Tara Mines is different, blasting occurs up to 400m under
Jan 1, 1994
-
Bioleaching Process For Bougainville Copper LimitedBy Kevork Chouzadjian, Gary Davis, Nicholas Katsikaros, Bruce Kelley, Mellie Mavatoi
A process has been developed to recover gold and copper from two waste materials at the Bougainville Copper Limited mine in Papua New Guinea. It involves the bioleaching, in reactors, of a pyrite conc
Jan 1, 1990
-
In-Pit Crushing And Conveying At Highland Valley CopperBy D. M. Richards, A. D. MacPhail
Highland Valley Copper currently mines two low-grade ore bodies, Lornex and Valley. The partnership was formed in 1986. As a cost reduction measure, it was decided to use an in-pit crushing and convey
Jan 1, 1995
-
Members Of The Institute In Military Service (5a274546-4ea6-4c3d-826e-9d8d2f086d8c)AARONS, J. BOYD; Major. AGNEW, FRANK VANS. ALLEN, HERMAN H., Private, D Co., 8th Reserve Engineers. AMBLER, HARRY A., Second Training Camp,, Ft. Sheridan, Ill. BAINS, THOMAS M., JR., Major, Eng
Jan 11, 1917
-
Comparison Of Automated With Manual Techniques Of Dust CharacterizationBy Tim B. Vanderwood
The mineralogy of dusts from several locations in a lead smelting plant, remotely collected dusts and soils near the lead smelter, and dusts from a secondary copper smelter were examined by reflected
Jan 1, 1992
-
Technical Committees (50155aee-a4f2-4f3d-b91a-54e2b615308c)1-Coal and Coal Products HOWARD N EAVENSON, Chairman C. T. HAYDEN, Vice-chairman, Bituminous Coal Production CHARLES DORRANCE, Vice-chairman, Anthracite Coal Production HOWARD P. ZELLER, Vice-ch
Jan 1, 1923
-
Lake Superior Paper - Centrifugal VentilatorsBy R. V. Norris
In a former paper on this subject,' I summarized Murgue's theory and experiments, and presented a large number of tests of mine-fans, stating some conclusions, " more or less warranted by th
Jan 1, 1905
-
Shaft Construction Through Natural Crude OilBy Dale J. Sadowski, Richard J. Switalski, Kyle R. Ott
This paper discusses design and construction aspects of shaft construction through rock saturated with petroleum hydrocarbons (crude oil). During the subsurface exploration phase for design of the Hil
Jan 1, 1995
-
An Approach to Incorporate Rock Fabric Information in Blast Fragmentation InvestigationsBy Dirk van Zyl
Rock fabric information is often available from drill hole information and bench face mapping. An approach is presented to predict fragment size distribution of blasted material from this information
Jan 1, 1986
-
The Concept of Explosives Malfunctioning in Rock BlastingBy Quian Liu
The problem of cross-hole explosive malfunctioning in rock blasting (including sympathetic detonation, desensitization and cut-offs) is a function of delay and spacing in a blast which should be desig
Jan 1, 1994
-
PART V - Papers - Rate-Sensitive Deformation in Tin-Lead AlloysBy H. E. Cline, T. H. Alden
A study zvas made of rate-sensitive plastic deformation and superplasticity in alloys of lead and tin. These alloys (lead, PO-19 pct Sn, Sn-38 pct Pb, Sn-2 pct Pb, tin) were extruded, aged at room tem
Jan 1, 1968
-
Liquid-liquid Extraction of Zirconium (IV) with Triphenylphosphine OxideBy K. Saberyan
In this study, solvent extraction of zirconium by using triphenylphosphine oxide as extractant has been investigated. The results showed that extraction of zirconium by triphenylphosphine oxides in ni
Jan 1, 2014
-
Design And Operation On Sintering Plants Incorporating Cooling Of The Sinter On The Strand ? IntroductionBy J. Astier
The idea of using only one strand for both sintering and cooling of the sinter is not new. In 1952, in the U.S.A. a sintering plant was built at Benson Mine (Star Lake, N.Y.), including : - 68 m2 o
Jan 1, 1974
-
New York Meeting, Feb 1918One Hundred Sixteenth Meeting of the Institute, Monday, Feb. 18, to Thursday, Feb. 21, inclusive, 1918. Committee on Arrangements J. E. JOHNSON, JR., Chairman BRADLEY STOUGHTON, Vice-Chairman A. R.
Jan 1, 1918
-
Discussions - Relationship of Fault Displacement to Gouge and Breccia ThicknessBy E. C. Robertson
D.G. Wilder I found the suggestion that the amount of displacement of a fault can be numerically related to the thickness of gouge or breccia to be both intuitively satisfying and intriguing. I hav
Jan 12, 1984
-
Discussions - Relationship Of Fault Displacement To Gouge And Breccia Thickness - Technical Papers, Mining Engineering, Vol. 35, No. 10, October 1983, pp. 1426- 1432 – Robertson, E. C.By D. G. Wilder
D.G. Wilder I found the suggestion that the amount of displacement of a fault can be numerically related to the thickness of gouge or breccia to be both intuitively satisfying and intriguing. I hav
Jan 1, 1985
-
Soft Ground Tunnelling On Staten IslandBy Christopher P. White, John R. Wagner
This paper will discuss the complex and difficult soil conditions encountered in the sinking of 15 shafts of 18m to 27m depth and the excavation and lining of 6700m of 2.74m dia. interceptor sewer on