Search Documents

Sort by

  • AUSIMM
    Controlled-potential sulphidization and rougher-cleaner flotation of an oxide-sulphide copper ore

    By Wong KY, Woodcock JT

    Previous results have shown how con- trolled-potential sulphidization (CPS) can give improved metallurgy during rougher flo- tation of mixed oxide-sulphide copper ores. Results in this paper, using

    Jan 1, 1986

  • RMCMI
    RMCMI Convention Welcome And Call To Order

    The 81 st Regular Meeting and convention was called to order by the President, Charles W. Margolf at 9:00 a.m. Monday, July l, 1985 in the Silverton Room of Tamarron, a resort hotel near Durango, Colo

    Jan 1, 1985

  • CIM
    Structural Geology of the Osisko Lake Area, Quebec

    By H. J. Conolly

    The area around Osisko lake, the Horne mine, and the town of Rouyn, in northwestern Quebec, presents a most interesting structural problem. The present discussion is confined to an area around Osisko

    Jan 1, 1936

  • SME
    Advancements in Vertical conveying

    During the past 20 years, FKC-Lake Shore, located in southern Indiana, has been working with Contitech, the German conveyor company, to push vertical conveyor technology to new depths and open up addi

  • AUSIMM
    All-Flotation at North Broken Hill Limited

    IN this paper the author's intention is to convey a brief resume of the lead flotation treatment and lead flotation machines, which have replaced the May jigs and Wilfley tables at the plant of t

    Jan 1, 1930

  • AUSIMM
    The Use of the Three Dimensional Boundary Integral Equation Method for Determining Stresses at Tunnel Intersections

    By Hocking G

    For some underground structures, the use of the plane strain assumption in stress analyses may not be justified. The finite element method and photoelasticity have been used to obtain complete 3-D

    Jan 1, 1976

  • IMMS
    Ferromanganese Crusts From The Kuril Basin And Kashevarov Trough Seamounts (Sea Of Okhotsk)

    By P. E. Mikhailk

    From July 29 to September 15, 2004, the 178th cruise of the R/V Sonne took place under the KOMEX program in the Sea of Okhotsk. One of the cruise objectives was to dredge two different kinds of seamou

    Jan 1, 2005

  • NIOSH
    Respiratory Symptoms in Working Miners are not explained by Airway Hyperreactivity

    By M. Townsend, E. L. Petsonk, B. Fedders, M. Niggemeyer, H. Abrons, E. Daniloff, J. Griffin, K. Kinsley

    In certain populations, nonspecific airway hyperreactivity (HR) is associated with increased respiratory symptoms and decreased lung function. We analyzed standardized pulmonary symptom questionnaires

    Jan 1, 1989

  • TMS
    Recovery of valuable metals from spent lithium ion batteries by solvent extraction

    By Shun Myung Shin, Dong Hyo Yang

    Cobalt is recovered from square type of spent lithium ion batteries (LIBs) containing 5~20 % Co, 5~7 % Li, 5~10 % Ni, 15% organic chemicals, and 7% plastics together with Cu, Al, Fe, and Mn. The waste

    Jan 1, 2008

  • SME
    Very Large Span Openings At Shallow Depth: Deformation Magnitudes From Jointed Models And F.E. Analysis

    By Nick Barton, Harald Hansteen

    The deformations resulting from excavation of very large openings are compared using two-dimensional F.E. continuum analyses and discontinuous physical models (20,000 discrete blocks). Both the joint

    Jan 1, 1979

  • AIME
    Joint Activities (5bf6a672-e35e-4b33-9279-1b42cdff2964)

    The Institute conducts jointly with the American Society of Civil Engineers, American Society of Mechanical Engineers and American Institute of Electrical Engineers, certain activities as listed below

    Jan 1, 1934

  • AIME
    A Comparison of Certain Forms of Ports for Steel¬ Melting Furnaces

    By P. Barnes

    THE object of this paper is to make a brief comparison of the out-lines of several forms of ports for steel-melting furnaces, in reference chiefly to the proper mixture of the gas and air, and to the

    Jan 1, 1881

  • AIME
    Personal (d3d2c9d8-dd2d-4af1-bc9d-6d18473e75bc)

    The following is an incomplete list of members and guests who' called at Institute headquarters during the period Mar. 10, 1918 to Apr. 10, 1918. W. Sinclair Brown, Lebong Donok, Sumatra. F. Lar

    Jan 5, 1918

  • SAIMM
    Introducing your Council (bbbcac05-f303-4410-95d1-fd2a0cf4f5b2)

    Professor R. P. Plewman graduated with a B.Sc. in mining engineering from the University of the Witwatersrand in 1943, after which he had two years of military service. Mr P. W. J. van Rensburg attend

    Jan 1, 1984

  • AIME
    Colorado School of Mines

    The Colorado School of Mines, Golden, Colo. M F Coolbaugh, President. Since 1906 the School of Mines has issued a journal, known as the Quarterly of the Colorado School of Mines, which carries many

    Jan 1, 1933

  • SAIMM
    Special General Meeting

    A Special General Meeting of the Institute was held in Kelvin House, Johannesburg on Wednesday, 29th September, 1971. The President, Prof. D. D. Howat opened the meeting at 9.55 a.m. The Preside

  • SAIMM
    Electrokinetic solid-liquid separation of an ultrafine kimberlite suspension

    By W. Wilmans

    Electrokinetic dewatering of kimberlite slime under constant direct curents of 0,5 to 2 A and dewatering under constant applied potentia Is of 16,5 to 46,5 V are considered. The combined efects of ele

    Jan 1, 1987

  • SAIMM
    A 100-MN Jacking System for Testing Coal Pillars Underground

    By K. Hodgson, J. P. M. Hojem, N. G. W. Cook

    Already about one-third of South Africa's coal is mined at depths exceeding 100 metres. Almost all this mining is done by the bord and pillar method. Conventional design procedures call for ever

  • SME
    Factors Impacting Respirable Dust Entrainment And Dilution In High-Velocity Airstreams

    In conjunction with steady increases in production levels, long-wall operators have applied greater quantities of ventilating air to control respirable dust and methane gas. As a result, air velociti

    Jan 1, 2004

  • SME
    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024