Search Documents

Sort by

  • SME
    Testing of Ground Truth Instruments for Use in Evaluating Haul Truck Collision Warning and Avoidance Systems - SME Annual Meeting 2024

    By C. R. DeGennaro, Yongjun Zhang, J. Bickson, J. L. Carr, Chenming Zhou, J. R. Srednicki, B. Lambie, M. Girman, J. A. Galanko

    Between 2005 and 2021, surface mining haul trucks were involved in 54 fatal incidents in the United States [1]. Collision warning and avoidance systems (CXS) can help haul truck operators navigate the

    Feb 1, 2024

  • NIOSH
    IC 9389 Passive Treatment Of Coal Mine Drainage

    By Robert S. Hedin

    Passive methods of treating mine water use chemical and biological processes that decrease metal concentrations and neutralize acidity. Compared with conventional chemical treatment, passive methods g

    Jan 1, 1994

  • TMS
    Evaluation Of Acid Treatment On Brown Bentonite

    By C. G. Bastos Andrade, V. F. Justo, F. R. Valenzuela-Diaz, M. G. S. Valenzuela, C. M. Matos, C. Volzone

    For industrial use, the smectite clays are usually treated with inorganic acid of high concentration at temperatures under boiling point, which provide the bentonite´s bleaching power. In the present

    Jan 1, 2015

  • SME
    Undercut-and-Fill Mining at Falconbridge Mine of Falconbridge Nickel Mines Md.

    By S. A. Tims

    INTRODUCTION The Falconbridge mine ore body extends about 1.6 km (1 mile) in length and the deepest developed ore is on the 6050 level below surface. The ore zone varies in width from a few inches to

    Jan 1, 1982

  • DFI
    The Construction And Performance Of Post-Grouted Micro-Piles For Vancouver International Airport Domestic Terminal Building - Introduction

    By Ernest Naesgaard

    Post-grouted micro-piles were used for the seismic upgrading of the Vancouver International Airport Domestic Terminal Building (DTB). The micro-piles provided vertical resistance to both uplift and c

    Jan 1, 2004

  • SME
    Manganese And Copper Removal From Leachates Using Slag And Red Mud Reactive Barriers

    By I. Fafoutis

    Laboratory column studies were conducted in order to assess the effectiveness of slag and red mud reactive barriers for cleaning up leachates generated at mining and waste disposal sites and loaded wi

    Jan 1, 2006

  • AIME
    Logging - Some Theoretical Considerations Related to the Quantitative Evaluation of the Physical Characteristics of Reservoir Rock from Electrical Log Data

    By M. R. J. Wyllie, Walter D. Rose

    The use of electrical well logs for the quantitative determination of such reservoir parameters as connate water saturation, formation permeability and connate water salinity has recently been attract

    Jan 1, 1950

  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013

  • SAIMM
    Comparing different methods of sampling to estimate the mineral resource in the Elizabeth Bay aeolian diamond placer

    By J. U. Burger

    The Elizabeth Bay aeolian deposit in Namibia comprises a sedimentary package of diamondiferous grits that have been deposited, reworked and concentrated to various degrees by dominant southerly winds.

    Jan 1, 2009

  • CIM
    South African hoisting systems with emphasis on Blair multi-rope hoists

    By A. M. Girodo

    "Dorbyl Heavy Engineering has been manufacturing winders since 1949 mostly for the South African mining industry.Table 1 shows that the vast majority of winders have been double drum winders. At the g

    Jan 1, 1995

  • AIME
    Manganese Nodule Deposits Of The Central Pacific Basin

    By Tomoyuki Moritani, Atsuyuki Mizuno

    A concentration of manganese nodule varies areally from 0 to 30 kg/m2 in the central-eastern deep sea bottom of Central Pacific Basin with depth of 5,600-5,900m, but generally it is low, mostly of the

    Jan 1, 1976

  • IMMS
    Major Kuroko-Type Deposit In The Central Izu-Ogasawara (Bonin) Arc, Japan

    By Kokichi Iizasa

    Two major Kuroko-type deposits and minor sulfide deposits have been found in the middle Izu-Ogasawara (Bonin) Arc, Japan (Fig. 1). The Hakurei deposit, one of the major Kuroko-type deposits, was rece

    Jan 1, 2005

  • CIM
    Highwall Coal Recovery

    "Line Creek Resources Ltd. produces three million clean tonnes per year of metallurgical and thermal coals for the international market. The mining operation, which is located in the mountains of sout

    Jan 1, 1995

  • AUSIMM
    Some Real and Imaginary Examples of Volcanic Hazard and Risk Assessment

    An empirical method of estimating dense rock (D.R.E.) equivalent volumes erupted as airfall tephra, described in a companion paper in this volume, is elaborated, and its accuracy discussed. Estimates

    Jan 1, 1990

  • AUSIMM
    Roadway and Pillar Design Considerations for Development and Longwall Extraction at Central Colliery, Queensland

    By Ward B

    Central Colliery was developed to exploit large underground reserves in the German Creek lease. It was planned from the outset as a retreating longwall operation and is the first longwall mine in

    Jan 1, 1986

  • SAIMM
    Recommissioning A Two-Km Long Waste Mica Slurry Pipeline

    By P. Harris, N. Heywood

    An existing 1 800 m long pipeline, which carried waste mica slurry from kaolin processing, is to be recommissioned. The mica solids throughput is to be substantially increased from 5.2 t/h up to a max

    Jan 1, 2007

  • SAIMM
    Book News

    1. New books Specialty steels and hard materials, edited by N. R. Comins and J. B. Clark. Oxford, Pergamon, 1983.482 pp. Hardcover £55.50. Papers presented at an international conference on advances i

    Jan 1, 1983

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • DFI
    Driving And Extraction Of Steel Pipe Piles In Nearshore Environment

    By Nihal Bohra

    A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre

  • SME-ICGCM
    Management of Floor Heave at Bulga Underground Operations—A Case Study

    By Kudret Tutuk, Serkan Saydam, Sungsoon Mo

    "This paper presents an overview of the floor heave management at the Glencore Bulga Underground Operations and investigates the contributing factors to the behaviour of the floor. The mine experience

    Jan 1, 2018