    Sampling and Estimating Ore Deposits - Methods of Sampling and Estimating Copper Deposits - Sampling and Estimating Disseminated Copper Deposits

    By Ira B. Joralemon

    The sampling of disseminated copper deposits has been describeu often but the method of combining assays to give the true shape and value of the orebody as it will be mined has received less attention

    Jan 1, 1925

  • AIME
    Institute of Metals Division - Martensite Transformations in Zirconium, Titanium, and Titanium-Copper Alloys (TN)

    By J. Gordon Parr, L. P. Srivastava

    DUWEZ1 has shown that pure titanium and pure zirconium transform martensitically during rapid cooling at temperatures about 30° and 15°C re spectively below their To temperatures. Holden et al.2 de

    Jan 1, 1962

  • TMS
    Tile Production Using Wastes from Mining Industry of the Mining District Pachuca and Real Del Monte

    By A. Iván, Patiño C. Francisco, Flores B. Javier, Peréz L. Miguel, Hernandez A. Juan, Trapála P. Norma, Salinas R. Eleazar, Rivera L. Isauro, G. Flores, U. Mizraim

    "Tills work is related with the production of tiles using wastes from mining and metallurgical industry of Hidalgo State, as raw material. These wastes present a majority particle size (60 %), minor t

    Jan 1, 2012

  • AIME
    Part XI – November 1968 - Communications - A Computer Program for Calculating Sections of the Reciprocal Lattice of Any Crystal System

    By Colin M. Sargent

    THE electron diffraction pattern as seen in the electron microscope represents an approximately plane section of the reciprocal lattice. Identifying the zone axis of a diffraction pattern is often lab

    Jan 1, 1969

  • SAIMM
    Annual Report - For The Year Ended 30th June, 2000

    Council for 1999/2000 President M.H. Rogers President Elect Dr L.A. Cramer Vice Presidents Senior A.A.B. Douglas Immediate Past President J.R. Dixon Junior S.J. Ramokgopa Hon

    Jan 1, 2000

  • AIME
    Professional Divisions (da0a4ffe-910d-45ad-8814-3ad2593700c5)

    ALBERT J. PHILLIPS, Chairman E. H. Dix, JR., Past-chairman R. H. LEACH, Vice-chairman R. F. MEHL, Vice-chairman W. M. COME, Treasurer LOUIS JORDAN, Secretary 29 West 39th St., New York, N. Y.

    Jan 1, 1937

  • SAIMM
    Annual Report for the year ending 30th June, 1998

    Council for 1998/99 President R.P. Mohring President Elect J.R. Dixon Vice Presidents Senior junior M.H. Rogers Dr L.A. Cramer Immediate Past President Honorary Treasurer Dr N.A. Barcza J.A.

    Jan 1, 1985

  • DFI
    Offshore Wind Turbine Foundations - In Denmark And Belgium - Introduction

    By Jørn H. Thomsen

    This paper presents the experience gained and the lessons learned over the last decade within the numerous offshore foundation projects undertaken in the offshore waters of Denmark and Belgium by COWI

    Jan 1, 2013

  • AUSIMM
    Notes on the S. and M. Mine and on Treatment of Bismuth, Tin, and Wolfram Ores

    By Pound J. R

    THIS mine, which is the property of the S. and M. Syndicate, London, is located at Moina, in North-West Tasmania, 18 miles from Stavertorr railway station and 36 miles from Devonport. There are metall

    Jan 1, 1919

  • SME
    Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel Project

    By Stephen M. Smading

    The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b

    Jan 1, 2009

  • SME
    Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, OR

    By Niels Kofoed

    Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM

    Jan 1, 2011

  • AUSIMM
    Sampling and Grade Control Pratices at Misima Mines

    The Misima open pit gold mine is a 20Mt per annum operation. Blasthole drilling is used to sample all material at a uniform 5m square pattern, and representative sub- sampling of the blast holes en

    Jan 1, 1991

  • SAIMM
    Annual General Meeting of the Institute

    The Annual General Meeting of the South African Institute of Mining and Metallurgy was held in Kelvin House on Wednesday, 24th August, 1977. Dr M. D. G. Salamon (President) was in the chair and dec

    Jan 1, 1978

  • SME
    Shanxi Wanjiazhai Yellow River Diversion Project—Lots II & III

    By Edgardo Fogli, Mario Lampiano, Antonio Nicola

    The project is located in the northern region of the People’s Republic of China and was awarded to Impregilo, as sponsor of the Wan Long Joint Venture, in September1997. The project consists of fo

    Jan 1, 2001

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SME
    Nutley Quarry Trunk Sewer Project

    By Michael V. Mergentime, Prakash M. Donde

    The Nutley Quarry Trunk Sewer Project is a good example of a tunnel that went through difficult and complex ground. The 2 m (7ft.) diameter and 840 m (2,750 ft.)long tunnel passed through soft ground,

    Jan 1, 2001

  • SAIMM
    Numerical simulation of multiphase flow in a Vanyukov furnace

    By Y. M. Chen, H. L. Zhang, W. U. Bing, C. Q. Zhou

    Multiphase flow in the widely used Vanyukov furnace was numerically studied. An unsteady three-dimensional and three-phase flow model was firstly built using the computational fluid dynamics (CFD) sof

    Jan 1, 2015

  • SME
    Several Scientific Issues on Ground Control in the Mining of Thick Coal Seams

    China has made great progress in thick coal seam mining, commonly characterized by longwall top-coal caving mining and single-pass longwall mining with a large cutting height. At present, the maximum

    Jul 28, 2020

  • DFI
    Analyzing Drivability Of Open Ended Piles In Very Dense Sands

    By James A. Schneider

    The successful installation of long piles driven into very dense sands relies on the occurrence of the reduction in local friction with increased pile embedment, a phenomenon known as ?friction fatigu

    Jan 1, 2010

  • AUSIMM
    The Arrium IsaMill from Design through Commissioning and Optimisation

    By G Anderson, M Mativenga, C Stanton, M Larson

    Arrium’s magnetite concentrator has recently completed a modification program to improve the process that has been in operation in Whyalla, South Australia for the previous seven years. The magnetite

    Sep 7, 2015