Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer ProjectBy Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna
The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially
Jan 1, 2005
-
Development in Utility Tunnelling in the United Kingdom During the Years 1990–2000By Andy Mille
The paper highlights development of tunneling methodology in the UK during the years 1990-2000 using the example of two major tunneling contracts where there solution of difficult tunneling problems d
Jan 1, 2001
-
Overcoming Challenges in the Construction of the Dublin Port TunnelBy Tim Brick, Peter Jewell, Stephen Thompson, Simon Morgan
The $980m (€750m) Dublin Port Tunnel, Europe’s biggest urban highway tunnel project, was opened in December 2006. The culmination of this immense scheme is set to transform the environment, mobility a
Jan 1, 2007
-
The Longest Drive?Portland?s CSO MicrotunnelsBy Christa Overby
As part of the City of Portland, Oregon?s East Side Combined Sewer Overflow Tunnel Project, nine separate 2,130 mm (84-inch) diameter reinforced concrete pipe microtunnel drives totaling approximately
-
Application Of CFA Piles For Foundation Of A Shopping Centre On Long-Standing Dumping GroundBy Joanna Bzówka
Nowadays, there are some new requirements for the supermarket floors. The floors are loaded by high point- and moving-loads. In spite of this fact, it is necessary to ensure the stiffness of the floor
Jan 1, 2006
-
The Big Walnut—A Planned ApproachBy Tom Szaraz, Steve Skelhorn
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through
Jan 1, 2007
-
Intelligent Air Management for Energy Efficiency in Mining and Mineral Processing OperationsBy Arun .. J. Basu
The paper introduces Intelligent Air Management (IAM) as the core activity of M&I Group of Companies (M&I) for providing a total solution to any air management problems for mining and mineral processi
Apr 1, 2005
-
Industrial Minerals 2004 - GypsumBy R. D. Sharpe
Gypsum wallboard manufacturers in the United States shipped 3.18 billion m2 (34.2 billion sq ft) of wall-board products during 2004 versus 2.93 billion m2 (31.5billion sq ft) in 2003. Following a hi
Jan 1, 2005
-
The Green Precipitate Process For Remediation Of Acid Mine DrainageBy C. Restarick, R. G. Robins, R. M. Taylor, I. Ennis
Lime addition to acid mine drainage waters (AMD), possibly accompanied by aeration, has been the basis for their remediation by precipitation of predominantly metal hydroxides. An efficient novel alt
Jan 1, 2000
-
A Comparison of Ground Permeability Changes Before, During, and After Longwall Panel Mine-bys Under Deep and Shallow Cover - SME Annual Meeting 2025By James Addis, Zoheir Khademian, Marcia L. Harris, Charlie Matthews, Y Zheng
Shale gas wells can sometimes drill through coal reserves. Hypothetically, the caving of the gob from longwall coal mines may deform the shale gas well casing and potentially result in a breach. NIOSH
Feb 1, 2025
-
IC 6360 Mining Methods And Costs At Tintic Standard Mine, Tintic District, Utah ? Introduction And AcknowledgmentsBy James W. Wade
This paper describing the mining practices at the Tintic Standard mine is one of a series being prepared by the United States Bureau of Mines. In the preparation of this paper each subject has been
Jan 1, 1930
-
Optimized Preparation Of Fine Coal (73c2e591-0a2e-409d-b20e-d68c70077470)By D. G. Chedgy
Careful consideration is given to the type of cleaning equipment and control sys- teas to be used when selecting circuits for wash-ing fine coal (28M x 0 size fraction). However, the desliming, declay
Jan 1, 1986
-
Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum FiltrationBy R Klepper
Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick
Aug 8, 2011
-
Coal Handling System For The Cerrejon Coal ProjectBy Rick A. Croote
The objective of the Cerrejon Coal Project is to mine and export a minimum of 15 million metric tons per year of bituminous coal from the Guajira Pennisula in Colombia, South America. Major components
Jan 1, 1983
-
Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks
The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip
Jun 13, 2021
-
Síntese De Nanofolhas De Óxido De Níquel Decoradas Com Nanopartículas De Ouro E Paládio Para CatáliseBy Victor Costa de Mello Vasconcelos
O objetivo desse projeto é a preparação nanofolhas de óxido de níquel por calcinação e a formação de híbridos com nanopartículas esféricas de ouro e paládio. O trabalho focou na síntese de materiais c
Oct 30, 2017
-
Numerical Study on Mining-Retention Ratio Optimization in Underground Solid Potassium Salt MineBy Jin Zhao, Weijie Wei, Jinwang Zhang, Xiaohang Wan, Shengli Yang
Reasonable mining-retention ratio (ratio of room width to pillar width) is vital to recovery rate and stope stability in underground mining of solid potassium salt deposits. Based on the engineering b
Jun 25, 2024
-
Riviera Tungsten -A Discovery Case HistoryBy Walker. P. W. A.
Abstract -The Riviera tungsten occurrence in the Cape Province of South Africa was discovered in October 1979 as a result of stream-sediment panned concentrate sampling. The Cape age granite and late
Jan 1, 1994
-
High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, AustraliaBy B G. Lottermoser
Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h
Jan 1, 2003
-
Parametrização Das Curvas De Escoamento Plástico Do Aço Inoxidável Austenítico Aisi 316 LBy Rafael Pereira Ferreira
O objetivo deste trabalho consiste em caracterizar o comportamento termomecânico do aço inoxidável austenítico AISI 316L a partir dos parâmetros de encruamento (h), recuperação dinâmica (r) e recrista
Aug 17, 2017