Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Tests Of Fiber-Reinforced Shotcrete At The Chief Joseph Mine, Butte, Montana (b89796c7-16f8-490c-8f06-a6a44dc18844)By John P. Dunford, Lewis A. Martin
Researchers from the Spokane Research Laboratory, National Institute for Occupational Safety and Health, in cooperation with engineers from the Department of Mining and Geological Engineering, Montana
Jan 1, 2005
-
Metals Branch and Divisions (57c69f57-551c-4b75-84dd-21dfe5cde154)Institute of Metals Division Iron and Steel Division Extractive Metallurgy Division Council A W Thornton (ISD), Chairman, R W Shearman, Secretary, C S Barrett (IMD), J C Kinnear, Jr (EMD), John C
Jan 1, 1956
-
Going Deeper - Has Your Mine Plan Fully Considered Ventilation?By P Gardner
The Kanowna Belle gold mine in Western Australia has reached a depth of 1000 m on the way to 1300 m. A feasibility study undertaken in 2006 identified the mining of E-Block as both technically and com
Jan 1, 2008
-
Precast Segmented Tunnel Lining For The Mexico City SubwayBy Arthur P. Chase
The Tacubaya subway tunnels form a link in the Sistema de Transporte Colectivo (Mass Transit System) of the Federal District of Mexico. One tunnel 327 m long lies to the north of Tacubaya Station, the
Jan 1, 1997
-
Soudan 2 Cavern Construction HistoryBy Brent K. Nelson, D. Lee Petersen, Charles R. Nelson
INTRODUCTION The Soudan 2 Cavern was completed in 1986 as a physics research laboratory located 713 m below ground in northern Minnesota. A paper in the 1985 RETC proceedings presented the backgrou
Jan 1, 1987
-
Introducing new Council members (9a882a04-a549-4ea3-8d22-a4dc13a66bbd)Mr R.D. Beck attended Felsted School in Essex (England) and the Royal School of Mines, University of London, where he ob¬tained the degree of B.Sc.(Eng.), A.R.S.M. in mineral technology in 1969. His o
Jan 1, 1985
-
Blasting Practices Updated at Cannon MineBy Clark J. Gilbert
The mining method at the Cannon mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill before pillar removal. The dimensions of the pillars are 7.3 m wi
Jan 1, 1990
-
Program of Arizona MeetingThe Arizona Committee, consisting of GERALD F. G. SHERMAN, Chairman, ARTHUR NOTMAN, Secretary, NORMAN CARMICHAEL, B. BRITTON GOTTSBERGER, W. L. CLARK, J. C. GREENWAY, W. G. MCBRIDE, FOREST RUTHER
Jan 6, 1916
-
A Practical Model for Industrial Flotation BanksBy J. B. Yianatos
A practical an interactive model to describe the operation of a flotation bank of mechanical cells was developed based on the hydrodynamic and metallurgical characterization of large industrial flotat
Jan 1, 2014
-
The Katie copper-gold porphyry deposit, southeastern British ColumbiaBy T. G. Hawkins, T. M. Naciuk
"The Katie Cu-Au deposit is situated in southeastern British Columbia, 425 km east of Vancouver. The deposit is a member of the alkaline group of porphyry Cu-Au deposits associated with potassically a
Jan 1, 1995
-
"Drift Prospecting Near Gold Occurrences atOnaman River, Ontario and Oldham, Nova Scotia"By R. N. W. DiLabio
"In a continuing program of mapping glacial dispersal trains, near-surface till samples were collected down-ice from a copper-silver-gold prospect at Onaman River, Ontario, and down-ice from the past-
Jan 1, 1982
-
Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting SystemsBy B Crowdey, J Wall
The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react
Mar 24, 2014
-
Potash production hoisting plant upgrade and beyondBy D. M. Ziebarth
"During the mid to late 1960s, the underground potash industry in Saskatchewan was born. For the next four decades the industry operated at a steady pace, supporting a large part of the world demand,
Apr 1, 2017
-
Mechanized Tunnelling Driving Toronto’s Big Move - Eglinton–Scarborough Crosstown Tunnel Construction (ECLC1-15)By Osamu Nishikokura, Jumpei Yamashita, Darrell Liebno, Malcolm Sheehan
"The Eglinton-Scarborough Crosstown Project builds a 19km LRT corridor that includes a 10km underground portion, between Keele Street and Laird Drive. The West Tunnel Contract (ECLC1-15) includes 6.5k
Jan 1, 2016
-
Part I – January 1969 - Communications - Elastic Constants of Ni3AI Between 80° and 600°KAN intermetallic compound, Ni3A1, has an ordered fcc structure of type Ll2, and shows peculiar dependence of the yield stress upon temperature; i.e., the yield stress increases by a factor of six upo
Jan 1, 1970
-
Anaconda Accidents and FatalitiesBy John Boardman
THE latest metal-mine accident report available for the United States is that of the Bureau of Mines for the calendar year 1919. Quoting from Table 20, p. 53, of that report, we find that there were 4
Jan 9, 1922
-
Papers - Classification - Effect of Oven Humidity on Accelerated Weathering Tests of Coal (With Discussion)By K. C. Gilbart, E. Stansfield
This test was described in a privately circulated First Progress Report on Slacking Characteristics of Coal, by A. C. Fieldner and W. A. Selvig, May 1, 1928. The test was described in detail in U. S.
Jan 1, 1934
-
Improvements in stope drilling and blasting for deep gold minesBy N. G. Cook, N. C. Joughin, A. J. A. White
The rate of face advance in the gold mines is between 3 and 10 m a month, with a median value of about 5 m a month; it follows that faces are blasted less frequently than is planned. There are many ad
Jan 1, 1975
-
Proceedings February General Meeting (99dc8f86-c83c-4cf0-9bea-afdf4f535979)The February General Meeting of the Branch was held in the St. Helena Club at 8.00 p.m. on the 10th February, 1971. Mr G. Y. Nisbet (Chairman, O.F.S. Branch) was in the chair. There were also pr
-
Discussions of Papers Published Prior to July 1960 - The Electronic Computer and Statistics for Predicting Ore Recovery; AIME Trans, 1959, vol 214, page 1035By R. F. Shurtz
R. Duval (Mining Engineer, Ancien eleve de PEcole Polytechnique, Paris, France) I do not agree with the Eq. 3, reading: m =1/100- [(0.214x30.4) + (0.7B6 x0.00)] =6.5pct CaO If 0.214 and0.786 wer
Jan 1, 1961