Search Documents

Sort by

  • SAIMM
    The 1980 Coal Processing School

    By Z. Zitron

    In 1978 the South African Coal Processing Society (SACPS), together with the Institute for Energy Studies of the Rand Afrikaans University, ran a school on coal processing. This was judged by both the

    Jan 1, 1981

  • AIME
    Petroleum Division Stages Successful Meeting

    By AIME AIME

    THE fifth annual fall meeting of the Petroleum Division of the A. 1. M. E. went down into history as being one of the best ever held by this Division and marked progress was made in the concentration

    Jan 1, 1929

  • NIOSH
    Comparison Of Methane Concentrations At A Simulated Coal Mine Face During Bolting

    By Jeanne A. Zimmer, Charles D. Taylor, Edward D. Thimons

    Strategies for monitoring methane levels during roof bolting in an extended cut entry were evaluated. Testing was conducted at the Pittsburgh Research Laboratory’s methane test gallery. Operating cond

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999

  • SME
    Events leading to Colombia’s Ruiz volcano eruption and its results described

    By Antonio Rivera

    On Nov. 13, 1985, Colombia's Ruiz volcano erupted, killing an estimated 25,000 people and burying several villages. Damages were estimated to be about $US300 million. The following is an accou

    Jan 2, 1986

  • DFI
    Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge

    By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy

    "The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the

    Jan 1, 2015

  • CIM
    Observational Construction Management of a Large Scale Underground Railway Station by Urban NATM Based on the Mechanism for Generation of Surface Settlement -Railway Bosphorus Tube Crossing, Tunnels and Stations

    By S. Kobayashi, N. Ohara, T. Aoki, S. Sakurai, M. Iwano, M. Shimo, I. Otsuka

    "This project is the upgrading of a commuter line of approximately 76 km to improve the railway system in Istanbul metropolitan area. Railway tracks have been connected between Asia and Europe through

    Jan 1, 2015

  • DFI
    Metro Sao Paulo, Line 5, Five Shaft Diaphragm Wall for Brooklin Station

    By Dario Libano, Franz-Werner Gerressen

    "Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barrie

    Jan 1, 2017

  • SME
    52. Discovery of the Yeelirrie Uranium Deposit

    By E. Cameron

    Yeelirrie lies toward the center of Western Australia, 650 km (404 miles) northeast of Perth (Fig. 1). The ore reserves have been estimated as 52.5 kt (57,871 tons) of contained U3O8, at an average gr

    Jan 1, 1991

  • AIME
    Optimisation of Production Capacity for Maximum Profitability of a Copper Mine at Rio Tinto, Spain

    By J. A. Botin, K. H. Singh

    INTRODUCTION The Alfredo underground mine is one of the three mining operations of Rio Tinto Minera, S.A., all near the community of Rio Tinto in Huelva province of southwest Spain. The other two

    Jan 1, 1981

  • CIM
    Continuous loading at Brunswick Mining

    By J. Jerome MacDonald, Stephen B. Flewelling

    "In the base metals industry of today, operations required to continuously improve productivity and reduce unit production costs. Consistent with these goals is the improvement of the muck haulage cyc

    Jan 1, 1989

  • SME
    Two-Seam Mining Stability at OCI’s Big Island Trona Mina

    By J. F. T. Agapito

    OCI Wyoming mines two flat-lying trona seams that are 3- to 3.5-m- (10- to 11.5-ft-) thick, about10 m (33 ft) apart and 250-m- (820-ft-) deep at its Big Island Mine in Wyoming. Continuous miners and

    Jan 1, 2000

  • SME
    Building the East-West Cross Drift Tunnel at Yucca Mountain

    By Brian Fulcher

    In April 1997, Kiewit/Parsons Brinckerhoff (K/PB) completed the 7,600-m (25,000-ft) primary access tunnel for the Yucca Mountain, NV proposed high-level nuclear waste site. K/PB then began boring an

    Jan 1, 2000

  • IOM3
    Large-scale underground mining, new equipment and a better underground environment: result of research and development at LKAB, Sweden

    By I. Marklund, W. Hustrulid

    Sublevel caving is likely to remain the dominant system at both Malmberget and Kiruna for the foreseeable future. The sub-level interval has increased from 12 m in 1983 to 30 m, requiring more effecti

    Dec 1, 1995

  • AIME
    Trepca Mines Limited-III Development and Mining Methods

    By James Lorimer

    THE topography at the Stan Trg mine facilitated early exploration by adits; in consequence adit levels were developed at horizons 865, 795, and 760 meters above sea level, and the levels in the mine &

    Jan 1, 1936

  • SME
    Slope Stabilization At ?El Cerrejon? Coal Mine, Columbia, South America

    By M. Jaramillo

    The Expanded West Pit of the 15 MTY El Cerrejon Mine will reach a maximum depth of270 m. Slope stability evaluations indicated that this depth, combined with structural complexities, would create a se

    Jan 1, 1995

  • AIME
    Index K – M

    [JOSEPHSON, W. G.: The Argonaut Mine of Today, M88, 475 JOUET, C. H., biography, M29, 258 Joule-Thompson effect, 98, 381 JOWETT, J. H., biography, M83, 276 JUDSON, S. A.: Operations in the Gulf Co

    Jan 1, 1936

  • AUSIMM
    Extending Drill and Blast Limits - The Carpathia Experience

    Mining the Carpathia orebody at the Ardlethan tin mine in the late 1970s involved an innovative approach to underground mining which stretched the limits of drilling and blasting techniques. Holes of

    Jan 1, 2008

  • SME
    Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023

    By Doug Harding

    The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single

    Jun 13, 2023

  • AIME
    Consulting Engineers (marked with an asterisk in the Geographic Section)

    NORTH AMERICA ALASKA Anchorage,-Ames, M. B. Culver, H. W. Fiedler, H. L. Fox, E. F. Gallemore, W. A. Kreitlow, E. J. Layfield, R. A. Saarela, L. H. Strandberg. H. Candle,-Bobbins, J. S. College.-

    Jan 1, 1943