Search Documents

Sort by

  • AUSIMM
    Roa Greymouth Coalfield - Geology and Mining

    By B Moynihan

    The Roa Opencast Coal Mine is situated at the north-eastern end of the Greymouth Coalfield. It lies on an eastern flank of the Paparoa Range, 16 km north-east of the town of Greymouth on the West Coas

    Jan 1, 1993

  • AIME
    Index A – C (7f683475-4cf6-4287-8432-311b1f19dfb3)

    [AARONSON, E.: Discussion on Recent Developments in Fractionation as Applied to Tube Still Distillation, G26, 418 Abbe. See Microscope. Abbe apertometer, 95, 16 ABBOTT, W. L.: A.S.M.E. president,

    Jan 1, 1936

  • SME
    Development Of Open Stoping For Rare Earths At Pea Ridge

    By L. J. Tucker

    The magnetite orebody at Pea Ridge strikes NE-SH and dips at about 800 to the SE. The ore is high grade magnetite with a strike length of over 600-m and a maximum width of over 180-m on some of the le

    Jan 1, 1991

  • SME
    Ore/Waste Classification Satisfying Geometric Constraints

    By R. J. Barnes

    Consider a typical blast at a surface gold mine in North America. For example, the low-grade area of Bench 4000 at AMAX Gold's Sleeper Mine (Winnemucca, Nevada). Bench 4000 is 20 feet high (=6m)

    Jan 1, 1989

  • AIME
    Design of Permanent Ground Support Structures For Shafts at the Cathedral Bluffs Project

    By I. A. Lange, A. M. Richardson

    Although methods for determining shaft lining thickness are well documented, little attention has been given to the design of station breakouts and other related shaft ground support structures. This

    Jan 1, 1984

  • AIME
    Standing and Special Committees (75225565-67bc-43a6-a6a1-cf27cf720e99)

    Executive FREDERICK M. BECKET, Chairman HOWARD N. EAVENSON J. V. W. REYNDERS H. A. GUESS WILLIAM WRAITH Finance HENRY KRUMB, Chairman PAUL H. MERCER H. G. MOULTON Admissions JOHN M. LOVEJOY, C

    Jan 1, 1932

  • SME
    Structural analysis of mine pillars using finite element method - A case study

    By D. H. Y. Tang, S. S. Peng

    Three-dimensional finite element modeling (3-D FEM) was performed to analyze the safety factors of stump pillars, 5.5 m x 5.5 m, under a cover of 63 m using the Modified Drucker-Prager Theory. The res

    Jan 1, 1987

  • SME
    Hydrologic and Environmental Behavior of GeoWaste and Waste Rock in Field Experimental Piles - Mining, Metallurgy & Exploration (2021)

    By MOHAMMAD R. H. GORAKHKI, Christopher A. Bareither, MANUEL APARICIO, Joseph Scalia IV

    The focus of this study was on the evaluation of hydrologic and environmental behavior observed in GeoWaste and waste rock test piles. GeoWaste is a mixture of fast-filtered tailings and waste rock pr

    Mar 31, 2021

  • SME
    Opencast Mining Of Brown Coal In Eastern Europe (53316393-306c-401a-9c67-5ad911520cfd)

    By Yoginder P. Chugh

    Most mines are large producing 0-25 mmt annually. The coal is mine.) at depths ranging from .0-150 m 120-500 ft mining at 300 m .(,1000 ft) depth is anticipated in the future. Single and multiple seam

    Jan 1, 1980

  • AUSIMM
    Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring Machine

    By R Fletcher

    Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains

    Mar 8, 2011

  • DFI
    Innovations and Challenges during Urban Development – Shoring and Foundations of Canada’s Tallest Residential Building

    By Shawna Munn, Nadir Ansari, Toben Jerry

    With ever increasing demands on space in urban environments and smaller available footprints, buildings are being designed to increasing heights to meet the need. This case study discusses the increas

    Jan 1, 2019

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • CIM
    Hope Bay Project: Canada?s Premier Undeveloped Greenstone Gold Belt Nunavut Territory, Canada

    By Stephen P. Quin

    One of the most prospective undeveloped greenstone belts in Canada, the Hope Bay greenstone belt extends over 80km in a north-south direction and is between 7 and 20km wide. The belt lies on the arcti

    May 1, 2003

  • AUSIMM
    Contrasting Epithermal Gold Mineralisation in the Northern Coromandel Volcanic Zone, New Zealand

    By M R. Stevens

    The Kauri Block (Hauraki Hill) andMatawai Valley epithermal vein systems, near Coromandel township, are hosted by hydrothermally altered Miocene andesites and Mesozoic greywackes of the Coromandel Vol

    Jan 1, 1993

  • SME-ICGCM
    Improvement in Roof Support Systems at a New Underground Coal Mine Developed from Open-Cut Highwall in Indonesia

    By Takashi Sasaoka

    Indonesia is the second largest coal exporter to Japan, accounting for about 30 M tons annually. They produced about 150 M tons in 2005, over 99% of which being from open-cut mines [1]. However, t

    Jan 1, 2007

  • AUSIMM
    The Effect of Thallium on the Rate of Exraction of Gold from Pyrites Calcine

    The addition of a thallous salt to the cyanide leach of a calcined pyritic concentrate causes a marked increase in the rate of extraction of gold. This is due probably to the activation of passive gol

    Jan 1, 1964

  • IMPC
    Beneficiation of low-grade weathered nickel sulfide ore for metallurgical uses

    By Silvia França, Hudson Couto

    "In this paper, an alternative beneficiation process was developed to recover nickel minerals from low-grade weathered ores. The studied sample, 0.3% Ni grade, is essentially composed of nickel sulfid

    Jan 1, 2014

  • CIM
    The Oren Ada Zone 4 Deposit: Deformed Vein-Type Gold Mineralization within the Cadillac Tectonic Zone, Se of Val D'or

    By François Robert, Rex Brommecker, Don S. Bubar

    "The Orenada Zone 4 deposit is a small vein-type gold deposit occurring directly within the Cadillac Break southeast of Val d' Or in southeastern Abitibi Sub province. Mineralization is hosted by the

    Jan 1, 1990

  • TMS
    Some Challenges In The Nitride Metallurgy: Synthesis Of Complex Nitrides, Phase Equilibria And Chemical Potential Measurements (Invited)

    By Toru H. Okabe

    As part of a systematic study on the thermodynamic properties of complex nitrides, phase equilibria of the system Li-M-N (M Mg, AI, Ga) at 900 K were investigated. An attempt to determine the thermody

    Jan 1, 2003

  • TMS
    Some Challenges In The Nitride Metallurgy: Synthesis Of Complex Nitrides, Phase Equilibria And Chemical Potential Measurements (Invited) (e7310d7e-ddc2-4cb2-b3c2-2c68d21b9795)

    By Toru H. Okabe

    As part of a systematic study on the thermodynamic properties of complex nitrides, phase equilibria of the system Li-M-N (M Mg, AI, Ga) at 900 K were investigated. An attempt to determine the thermody

    Jan 1, 2003