Search Documents

Sort by

  • CIM
    Truck-shovel optimization accounting for cost, safety, and operational practice

    By C. O. Aksoy, H. Kose, K. Ozfirat, T. Malli, A. Gonen, S. Gurgen

    In selecting mobile mining equipment, factors including availability, useful economic life, maintenance and operating costs, and spare parts availability are considered. Given these factors, trucks an

    Jan 1, 2005

  • AIME
    Rock Mechanics Studies At The Calumet Pumping Station, Chicago, Illinois

    By Frank S. Shuri

    INTRODUCTION The Calumet Pumping Station, located on the south side of the Greater Chicago area, is part of the Tunnel and Reservoir Plan to accomodate the city's wastewater. The Station cons

    Jan 1, 1984

  • CIM
    Volatilization Behavior of Valuable Metals in Electronic Substrate Waste by Chlorination Volatilization

    By K. Sugawaral, W. Tongampl, K. Hiruta, Takasaki Y., A. Hosoi, T. Katol, A. Shibayamal

    Printed circuit boards of discarded personal computers, televisions, mobile phones and so on contain a significant amount of valuable metals. For the recycle of valuable metals contained in the printe

    Jan 1, 2011

  • SAIMM
    Proceedings, 99th Annual General Meeting, 1996

    The 99th Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the Gold Room, Transvaal Automobile Club, 60 5th Street, Lower Houghton, Johannesburg on Wednesday,

    Jan 1, 1996

  • SME
    Sevres-Acheres Sewage System Water Control Cavern

    By J. Launay

    In order to control and dispatch the sewage water coming from 3 tunnels toward 2 downstream sewage tunnels, a large cavern has been excavated in a suburb of PARIS. Located at a depth of 47,00 m, it ha

    Jan 1, 1989

  • SME
    Tunnel Excavation In Alaska Using High Speed Equipment

    By Mike S. Ness, Allan G. Provost

    High speed drilling, mucking, and hauling equipment was used in driving approximately 2.16 km(7100 ft) of lower power tunnel in quartz diorite for the Tyee Lake Hydroelectric Project near Wrangell, Al

    Jan 1, 1983

  • CIM
    Maximisation des revenus et du rendement financier par l’optimisation de I’information, de la planification et des pratiques minières*

    By M. Vallée

    "RÉSUMÉDurant les 10 dernières années, les améliorations dans le contrôle des limites des sautages et les arpentages après l’exploitation ont fourni des informations préalables et post facto sur les l

    Jan 1, 2005

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration (c1221f6a-70cf-4429-9a4d-13a3e324a05a)

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • SME
    Optimum Chain Pillar Design at the Deepest Multi-Seam Longwall Workings in India Mining, Metallurgy and Exploration

    By Nilabjendu Ghosh, Satyendra Kumar Singh, Gautam Banerjee, Harshit Agrawal

    High-production methods like longwall mining with hydraulic powered supports are necessary to increase underground coal production in India. Longwall mining had a mixed success record for Indian geo-m

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    Applications Of Shallow High Resolution Seismic Reflection To Various Mining Operations (PREPRINT NUMBER 93-188)

    By R. D. Miller

    Application of shallow seismic reflection to problems associated with mineral exploration, mine planning, abandoned-mine detection, and environmental evaluation has been successful in a variety of geo

    Jan 1, 1993

  • AUSIMM
    Borescope Techniques for Assisting Colliery Roof Control

    By Rixon LK, Walton KP

    Evidence will be presented to show that borescope inspection of mine roofs is one of the most useful techniques available for stability assessments. ACIRL currently has four borescopes, comprising

    Jan 1, 1986

  • SME
    The Fort Lawton Parallel Tunnel Seattle, Washington

    By Brian Fulcher

    The Fort Lawton Parallel Tunnel was built in 1990 - 1991 by Morrison Knudsen Corporation (MK) as an integral part of Seattle METRO's planned expansion of the Westpoint Treatment Plant. The projec

    Jan 1, 1993

  • SME
    Recovery Of Fine Coal From Preparation Plant Refuse Using Column Flotation

    By J. G. Groppo, A. E. Bland, B. K. Parekh, W. F. Stotts

    Many coal preparation plants discard fine coal (generally minus 100 mesh) because it is difficult to beneficiate economically. At the Kentucky Energy Cabinet Laboratory (KECL), the waste streams from

    Jan 1, 1988

  • AUSIMM
    On the Planning of Underground Storage of Stormwater and Mechanical Boring of Sewer Shield Tunnelling in Tokyo

    Tokyo Metropolitan Government designs the stormwater storage plans in underground, as a measure of flood control in completed urban district and improvement of combined sewarage system. This time,

    Jan 1, 1987

  • AIME
    High Stress Occurrences In The Canadian Shield

    By G. Hergert

    SUMMARY Three gradients have been identified in regard to the average horizontal ground stress increase with depth. [S (0-900 m) = 9.86 MPa + 0.0371 MPa/m SHa (900-2200 m) = 33.41 MPa + 0.0111 M

    Jan 1, 1982

  • AIME
    Affiliated Student Societies (1929)

    University or College Society President Secretary Alabama, University of University. Ala Mining and Metallurgical Society Warren G. Payne Melbon J. Langley Alaska Agr. College and School of Mines, C

    Jan 1, 1929

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005

  • SAIMM
    The Use Of Neural Network Analysis Of Diagnostic Leaching Data In Gold Liberation Modelling

    By K. R. P. Petersen

    Paper written on project work carried out in partial fulfilment of M.Sc. Eng.(Metallurgical Engineering) degree The interrelationship between mineral liberation and leaching behaviour of a gold ore

    Jan 1, 2003

  • CIM
    Ignition of sulphide dust clouds by explosives

    Experimental Mine, Val d'Or, Quebec, Experiments on the ignition of sulphide dust clouds by explosives have been conducted in a 1 m3 explosion chamber. The explosives tested are ANFO, emulsion, a

    Jan 1, 1993