Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Critical Failure Criteria of the Overlying Rock Strata Due to High Intensity Longwall Coal Mining in China

    By Wenbing Guo, Gaobo Zhao, Erhu Bai, Brijes Mishra

    "Violent damage to overlying strata can occur above the large mined-out space left by high-intensity longwall mining. For the safe mining under the aquifer and surface water body, it is imperative to

    Jan 1, 2019

  • SME
    Experimental Study Of Residence Time Distributions Of Ball-Mill Circuits Grinding Coal-Water Mixtures

    By K. Shoji

    Residence time distributions (RTDs) were estimated by water tracing in a number of wet overflow ball mills (diameters 0.38 to 4.65 m) producing dense, coal-water slurries. In open-circuit mills of 0.3

    Jan 1, 2008

  • SME
    Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction

    By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers

    Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie

    Jan 1, 2007

  • SME
    Commissioning Of A 750 KW Centrifugal Fan At Pt Freeport Indonesia’s Deep Ore Zone Mine

    By F. Calizaya

    The PT Freeport Indonesia‘s Deep Ore Zone(DOZ) copper deposit is located in the province of Irian-Jaya, Indonesia. Currently, a block cave mine is being developed around this deposit. Production is sc

    Jan 1, 2000

  • SME
    Subsea Massive Sulphide Mining - Technology Test Program

    By J. Hunter, E. Jackson

    This paper describes work done by Placer Dome Technical Services Limited, a subsidiary of Barrick Gold, and Nautilus Minerals Inc. in support of the conceptual design of a subsea mining system. It d

    Jan 1, 2007

  • SME
    Geology Of Wyoming's Powder River Coal Field

    By G. B. Glass

    In 1996, 92.5% or 233 Mt (257.4 million st) of coal produced in Wyoming came from the Wyodak coal zone in the eastern Powder River Coal Field. While the mined portions of the zone consist of one to th

    Jan 1, 1998

  • SME
    Geology Of Wyoming's Powder River Basin Coalfield

    By Gary B. Glass

    In 1997, 92.3% or 235.7 Mt (259.8 million st) of coal produced in Wyoming came from the Wyodak coal zone in the eastern Powder River coalfield. The mined portions of the zone consist of one to three b

    Jan 1, 1998

  • SME
    The Carbon In Pulp Plant Of The Masbate Gold Operations, Philippines ? Introduction

    By Ramon S. Pizarro

    The Masbate Province, Philippines, has been a gold producer for many years. Several gold properties were profitably operating until the outbreak of World War II in 1941. One of these properties was th

    Jan 1, 1981

  • SME
    Recent Developments Of The ISP Operations At Harima Works

    By M. Tomono

    Harima Works is operating as the zinc and lead simultaneous smelter utilizing the imperial Smelting Process. The smelter commenced its operation in 1966 with designed capacities of 3500 t/M of zinc an

    Jan 1, 1986

  • SME
    Flexibility of NATM Shown During the Construction of the Egge Tunnel/Germany

    By Josef Arnold, Norbert Fuegenschuh

    The “Eggequerung” is an important part of the German Railway’s (Deutsche BahnAG) modernized Dortmund—Kassel line. The heart of this 13-km-long (8 miles)construction lot is the double-track Egge Tunnel

    Jan 1, 2003

  • SME
    A New Seismic Probe For Coal Seam Hazard Detection

    By W. R. Peters

    An experimental hole-to-hole seismic probe system has been developed for use in coal measure geology as a means of determining the structural conditions of coal seams. The source probe produces a 500-

    Jan 1, 1985

  • SME
    Bench Scale Optimization Of Mixing Variables During Anionic Conditioning Of Florida Phosphates (10ca4947-7da7-47de-a8a4-2b2c068d42f6)

    By R. M. Damodaran

    The flotation performance of Florida phosphate rock was evaluated in terms of the mixing behavior of reagents with particulates during anionic conditioning of phosphate slurries. The various condition

    Jan 1, 1995

  • SME
    Risk assessment for dragline productivity: a case study of GLI’s draglines in Turkey - SME Transactions 2011

    By H. S. Duzgun, N. Demirel

    Estimating productivity of a walking dragline is of paramount concern to mining engineers and mine planners. Risk based evaluation of the dragline productivity is a valuable tool to estimate the dragl

    Jan 1, 2011

  • SME
    Mine Planning At The McKinley Mine

    By M. G. Premo

    The McKinley Mine is located in the northwest New Mexico, in McKinley County, approximately 25 miles from Gallup. The mine is operated by The Pittsburg & Midway Coal Mining Co. (P&M), a wholly owned s

    Jan 1, 1992

  • SME
    The mass transport of slurry and solid in a laboratory overflow ball mill

    By R. Hogg, L. G. Austin, R. C. Klimpel

    Slurry densities and holdup were measured for open circuit grinding tests in a laboratory overflow ball mill of 0.3 m diam by 0.6 m long, by emptying and drying after stoppage of the mill. Contrary to

    Jan 1, 1990

  • SME
    Study Of Ventilation Of Longwall Coal Face By Model - Introduction

    On longwall coal faces in some Japanese coal mines more than half of the air coming from the intake gate road flows into the caved goaf and the air heated by the hot waste rocks in the goaf comes out

    Jan 1, 1980

  • SME
    Geared Up or Wrapped Up?

    By Kevin DeSomber, Scott Bird

    Larger grinding mills continue to utilize large gear-driven drives or electrical wraparound drives. The panel will include presenters from operations with large mechanical and electrical drives. J

    Jan 1, 1998

  • SME
    Site Investigations For Large Diameter Drilled Shafts

    By Donald P. Richards, William M. Greenslade, Daniel E. Albers

    INTRODUCTION The application of oil field technology to large diameter hole drilling is beginning to offer a cost effective alternative to conventional shaft sinking methods. The drilling of ventil

    Jan 1, 1981

  • SME
    Installing Cyclones on the Primary Grinding Circuit at Cyprus Sierrita

    By Leonard N. Hill

    Cyprus Sierrita Corp. has 16 parallel 5.03 m-diam x 5.8 m long (16.5 ft-diam x 19 ft) primary ball mills, each operating in closed circuit with a nest of cyclones. Before the upgrade to 840 mm (33 in.

    Jan 1, 1994

  • SME
    High Risk Tunneling Adjacent To Large Water Tank On The UNWI Sections 3&4 Project

    By Andrew Finney

    INTRODUCTION The Sacramento Regional County Sanitation District (SRCSD) serves unincorporated areas of Sacramento County, parts of the cities of Sacramento and Folsom, and the cities of Citrus Heigh