Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Studies on Alternative Methods of Ventilation Using Computational Fluid Dynamics (CFD), Scale and Full Scale Gallery Tests

    By G. Hargrave, K. W. Moloney, M. R. Stokes

    In recent years drivage advance rates in the UK have in- creased from 35m per week in the 1980's to 100/150m per week possible today. These extended rates of advance have resulted in an increase

    Jan 1, 1997

  • SME
    A Physical Scale Model of Flows in the Waste of a Retreat Longwall Coalface

    By P-M. Dupond, S. Lowrie, C. Tauziéde, Z. Pokryszka, A. D. Jones

    A physical model has been developed to simulate the flows and mixing of gases in the waste of a longwall retreat coalface. The model is used in conjunction with computational modelling, and the distri

    Jan 1, 1997

  • SME
    Tailings Management in the Canadian Arctic – Echo Bay’s Lupin Mine

    By Hugh R. Wilson

    Echo Bay's Waste Management Program for its Lupin Mine was developed in response to the terms and conditions of the water license issued to the mine in 1981 by the Northwest Territories Water Boa

    Jan 1, 1991

  • SME
    Evolution of a Mine Information System at the Endako Mine

    By Robert Jedrzejczak

    The Endako Mine is an open-pit molybdenum mine located in the north central region of British Columbia, Canada, about 960 km (600 road miles) north of Vancouver. Production for the latter part of 1992

    Jan 1, 1993

  • SME
    Hydraulic Performance Tests Of A Cement Grout Borehole Seal

    By W. B. Greer, J. J. K. Daemen

    Introduction The performance of seals in boreholes, shafts and tunnels is an important concern in mine safety, in the control of effluents from operating and abandoned mines and in the underground

    Jan 1, 1993

  • SME
    Performance And Experiential Development Of The Mobile Miner At Mount Isa

    By R. J. Boyd

    SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc

    Jan 1, 1987

  • SME
    TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case

    By Enrique Fernández

    INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l

  • SME
    Mining and Hydraulic Transport of Minerals from Deep-Ocean Floor

    By H. Savasci, G. Yarim, J. S. Chung

    As part of ongoing deep-ocean mining research, hydraulic transport systems as well as status of deep-ocean mining systems are reviewed in the aspects of manganese nodules and crusts from 8006,000-m de

    Jan 1, 1999

  • SME
    Uranium Mill Tailings Management: Cover Systems, Containment Migration And Long-Term Stability - Introduction

    By J. N. Hartley

    Uranium mill tailings, waste products of uranium extraction, contain hazardous constituents that if released into the atmosphere and groundwater could threaten our health and environment. To provide f

    Jan 1, 1984

  • SME
    Open Pit Mining Applications Of High Energy Projectile Impact

    By Robert G. Lundguist

    REAM is a unique and promising method of rock breaking using high energy, inert projectiles to impart mechanical energy to the rock. This paper describes a demonstration of the application of this new

    Jan 1, 1976

  • SME
    Mining and Hydraulic Transport of Minerals from Deep-Ocean Floor (bf680df2-1f92-458d-8f28-9e08eefa5209)

    By J. S. Chung

    As part of ongoing deep-ocean mining research, hydraulic transport systems as well as status of deep-ocean mining systems are reviewed in the aspects of manganese nodules and crusts from 800-6,000-m d

    Jan 1, 1999

  • SME
    The Roles Of Lithology And Excavation In The Triggering Of Seismic Repeaters In A Deep Mine - RASIM 2022

    By Bernard P, Lhoumaud E, Gunzburger Y, Conin M, De Santis F, Kinscher J

    Seismic repeaters are commonly observed in natural fault zones dominated by slow aseismic motion. The corresponding seismic signal, characterized by highly similar wave forms, is usually interpreted a

    Apr 26, 2022

  • SME
    Pyrometallurgy (94b28e36-84a4-4dbd-930b-f31312a8aed4)

    By T. R. A. Davey, J. W. Sherman, B. J. DiSanto, G. Bjorling, G. S. Stacey, J. T. Cullom, R. L. Bird, S. E. Woods, J. C. Blair, Jorma Honkasalo

    Most pyrometallurgical processes take place at high temperature with rapid chemical reactions when the elements and compounds are usually liquid or gaseous. Smelting. The classical method of obtaining

    Jan 1, 1985

  • SME
    High Fidelity Simulation of the Mineral Liberation Process

    By J. A. Herbst

    Mineral liberation modeling can be traced back to the early work 0fA.M. Gaudin up through more recent population balance modeling by R.p. King, J.A. Herbst and G.T. Adel. A more micro-scopic look was

    Jan 1, 2005

  • SME
    Fire Fighting in Deep, Narrow, Tabular, Metalliferous Mines Using the Gag-3a Inert Gas Generator System

    By D. M. Walters, C. M. van der Vyver, L. J. deVulliers

    The occurrence of underground fires in narrow tabular ore- bodies where high density timber support is used is a dangerous and disruptive occurrence. The containment and extinguishing of the fire rema

    Jan 1, 1997

  • SME
    Investigation And Repair Of The Northeast Raw Water Tunnel

    By Harry R. Price, Keith M. Swaffar

    The Northeast Raw Water Tunnel transports untreated water to the Detroit Water and Sewerage Department's (DWSD) Northeast Water Plant where it is treated and distributed. The occurrence of a subs

    Jan 1, 1987

  • SME
    An Environmental Impact Assessment Of Seafloor Mineral Extraction

    By Samantha Smith

    Nautilus is completing the world's first environmental impact assessment (EIA) of seafloor mineral extraction and Nautilus has gained extensive experience conducting environmental studies in subs

    Jan 1, 2008

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • SME
    Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer Project

    By Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna

    The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially

    Jan 1, 2005

  • SME
    Development in Utility Tunnelling in the United Kingdom During the Years 1990–2000

    By Andy Mille

    The paper highlights development of tunneling methodology in the UK during the years 1990-2000 using the example of two major tunneling contracts where there solution of difficult tunneling problems d

    Jan 1, 2001