Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design of Inclined Braceless Excavation Support with Inclined Buttress Applicable to Deep Excavation

    By Yoichi Shimada, Katsuyuki Nishida, Shinichi Takahashi, Yasushi Okada, Yohei Nakamichi, Kazunori Oshiro, Taichi Terui, Sigehiko Sugie

    "Temporary retaining walls are ordinarily used for tunnel construction work conducted using the opencut construction method. Retaining walls in such instances are typically installed vertically. Howev

    Jan 1, 2016

  • SME
    Monitoring Stability Of High Waste Dumps - Introduction

    By M. K. McCarter

    In 1963, a major expansion program at Kennecott's Bingham Canyon mine converted rail operation in the upper portion of the pit to truck haulage. Since that time truck-haulage capacity has increas

    Jan 1, 1976

  • SME
    Improvements Of The Determination Of Block Grades From Blast Hole Data In Porphyry Type Deposits

    By Miche1 Dagbert

    In most open pit operations mining porphyry type deposits, production planning rests on an are reserve inventory block file which is derived from diamond drill hole data. With such a practice, the way

    Jan 1, 1978

  • SME
    Deep Inclined Water Intake Shafts At The Navajo Generating Station

    By Albert Ruiz

    The 2,250-MW, coal-fired Navajo Generating Station located in Page, AZ draws water from Lake Powell using submersible pumps installed in five inclined shafts. Drought threatens to lower the reservoir

    Jan 1, 2011

  • SME
    Sprayed Concrete Lining Falls and Exclusion Zone Management

    By David Brown, Adrian St. John, John Comins, Mike King

    "INTRODUCTION The Crossrail project provides an East-West link across London enabling an additional 200 million journeys each year linking up major business centres and existing transportation interch

    Jan 1, 2016

  • SME
    Structural Fire Protection to NFPA 502 - Performance-Based Design and Assessment of Passive and Active Fire Protection Systems

    By Robinson Leon-Diaz, Alberto Jaen-Toribio, Raymond Blanchard, Mike Deevy, Miguel Fuentes-Llanos

    "Tunnels designed to NFPA 502 are required to withstand the RWS time-temperature curve, more specifically prevent progressive spalling and loss of strength of steel reinforcement. Fire boards or spray

    Jan 1, 2016

  • SME
    Accessing deep orebodies using mechanical excavation equipment

    By W. Burger

    For the development of deep, hard rock, mines fast access to the orebody is critical. In some cases the mineralized area is more than 1,500 m (5,000 ft) below surface. Excavation of shafts or declines

    Jun 1, 2010

  • SME
    43. Discovery of the Thompson Creek Molybdenum Deposit, Custer County, Idaho

    By E. A. Schmidt

    In 1962, while investigating the tungsten potential in the Thompson Creek area for Union Carbide Corp., Henry T. Eyrich obtained anomalous concentrations of molybdenum (up to 19 ppm Mo) from stream se

    Jan 1, 1991

  • SME
    TARP - Comparative Study of the Mining and Concrete Lining Operations for Tunnels with Diameters over 9 m (30 ft)

    By Joseph Fernandez, Luminita Calin

    INTRODUCTION The Tunnel and Reservoir Plan (TARP), commonly known as the Deep Tunnel Project, is the daring and unique concept developed by the Metropolitan Water Reclamation District of Greater C

    Jan 1, 1997

  • SME
    The Use Of Drilling And Pregrouting Prior To Excavation Of Mine Shafts

    By Martin C. Jones

    INTRODUCTION This paper outlines the methods used to drill and pregrout prior to the excavation of five Mine Shafts in the Coal Measures of the Eastern United States. One example is the use of ceme

    Jan 1, 1979

  • SME
    6. Chaucha Porphyry Copper Deposit, Ecuador

    By P. M. Fozzard

    The Chaucha porphyry copper/molybdenum deposit was discovered by a United Nations team of geologists working with a ?counter- part" team of staff of the Ecuadorian government's General Directorat

    Jan 1, 1991

  • SME
    Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur Mine

    By C. W. Nelson, A. G. Moody

    This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110

    Jan 1, 1994

  • SME
    Factors Favouring The Selection Of Pressure Oxidation For Macraes Flat

    By S. R. La Brooy, P. C. Earley

    Gold and Resource Developments NL (GRD) operates the Macraes Gold Project in East Otago in the South Island of New Zealand, treating a carbonaceous, refractory sulphidic gold ore. The ore is concentra

    Jan 1, 1999

  • SME
    An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment Underground

    By J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller

    An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac

    Jan 1, 1985

  • SME
    Opening Of Talc Deposit In Gemerská Poloma - Slovakia

    By J. Engel

    The talc deposit in Gemerská Poloma lies 350 to 400 m under the surface; the whole deposit is located at the highest-level drinking-water-source protection zone, therefore, opening in this mining area

    Jan 1, 2007

  • SME
    Effect of Ventilation System Configuration on Purging of Harmful Gases in a Built-in-Place Refuge Alternative with a Borehole Air Supply

    By M. A. Reyes, J. Bickson, J. R. Srednicki

    Federal laws mandate the presence of refuge alternatives (RAs) in underground coal mines and provide guidelines for harmful gas removal. After an explosion, harmful gases can follow survivors into an

    Jan 1, 2019

  • SME
    Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

    By P. Marcheselli, Jean-Yves Peron

    A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac

    Jan 1, 1995

  • SME
    The Simulation Of An Airlift To Provide Insight Into Control And Design Parameters

    By M. S. Janssen

    The development of a design equation for, and the testing of, a constant- flow airlift pump IS described. The predictions of the new airlift model agree with the results of experiments carried out usi

    Jan 1, 1989

  • SME
    Cerro Colorado On-Off Leach Pad Built in Six Months

    By Dennis C. Martin

    Construction of the Cerro Colorado on-off leach pad in northern Chile required about 3 Mm2 (32.3 million sq ft) of fill over an area of about 600,000 m2 (6.5 million sq ft) in irregular terrain with r

    Jan 1, 1995

  • SME
    Synthesis Of Monolithic Si2n2o Ceramic From Reclaimed Silicon And Desert Sand

    By M. Radwan, S. Shimada, S. Z. El-Tawil, K. A. El-Barawy, Y. Miyamoto

    This study presents the results of synthesizing monolithic siliconoxynitride, Si2N2O, ceramic from a mixture composed of reclaimed silicon and natural desert sand by using the nitriding combustion syn

    Jan 1, 2004